MIS LOG IN

ROS Information Session - Webex Only

May 07, 2020
09:30 AM
Teleconference: 877-668-4493
Meeting number: 290 105 946
Meeting password: ROS

Comments

To minimize noise disruptions on the WebEx while allowing maximum participation, a few tips:

  • When logging in to WebEx, please use this name convention: First Last (Company)
  • When connected to WebEx and using a phone for audio, please associate your phone to your name. There are two ways to do this:
    • Easiest: Use the "Call me" option for audio (enter your phone number; you’ll be called right away), then enter "1"
    • Use the "Call in" option and enter your assigned Attendee ID when prompted (you may have to scroll down to the bottom of the audio pop-up to see your Attendee ID)
  • To mute/unmute, hover over the bottom of the WebEx screen to activate the circle icons – mute is the mic on the far left
  • When speaking, please announce your name and company e.g. "Question from Joe with Electric Company"

Agenda

1.

Antitrust Admonition

K. Bunch

9:30 a.m.

2.

Agenda Review

K. Bunch

 

3.

Technical Advisory Committee (TAC) Update

K. Bunch

9:35 a.m.

4.

ERCOT Reports

 

9:40 a.m.

 

Operations Report

ERCOT Staff

 
 

System Planning Report

J. Billo

 
 

System Operating Limits (SOL) Methodology Update

D. Woodfin

 
 

Panhandle and West Texas Stability Studies Update

J. Schmall

 

5.

NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications (Possible Email Vote)

LCRA/ERCOT

10:25 a.m.

6.

NPRR1002, BESTF-5 Energy Storage Resource Single Model Registration and Charging Restrictions in Emergency Conditions, (Possible Email Vote)

S. Sharma

10:45 a.m.

7.

Revision Requests Tabled at PRS, Referred to ROS (Possible Email vote)

K. Bunch

11:00 a.m.

 

NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols

   

8.

ROS Revision Requests (Possible Email Vote)

K. Bunch

11:10 a.m.

 

Impact Analysis Review

   
 

NOGRR200, Delete Remaining Grey-Boxed Language Associated with NOGRR025, Monitoring Programs for QSEs, TSPs, and ERCOT

   
 

NOGRR205, Clarification to Grey-boxed Language in Section 4.8.1

   
 

NOGRR204, Related to NPRR989, BESTF-1 Energy Storage Resource Technical Requirements

   
 

Language Review

   
 

NOGRR207, Related to NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications

   
 

NOGRR208, Related to NPRR1002, BESTF-5 Energy Storage Resource Single Model Registration and Charging Restrictions in Emergency Conditions

   
 

RRGRR023, Related to NPRR1002, BESTF-5 Energy Storage Resource Single Model Registration and Charging Restrictions in Emergency Conditions

   
 

NOGRR209, Related to NPRR1003, Elimination of References to Resource Asset Registration Form

   
 

RRGRR024, Related to NPRR1003, Elimination of References to Resource Asset Registration Form

   
 

PGRR079, Related to NPRR1003, Elimination of References to Resource Asset Registration Form

   
 

NOGRR210, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB)

   
 

RRGRR025, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB)

   
 

NOGRR211, RTC – NOG 2 and 9: System Operations and Control Requirements and Monitoring Programs

   
 

NOGRR212, Related to NPRR1016, Clarify Requirements for Distribution Generation Resources (DGRs) and Distribution Energy Storage Resources (DESRs)

   
 

RRGRR026, Related to NPRR1016, Clarify Requirements for Distribution Generation Resources (DGRs) and Distribution Energy Storage Resources (DESRs)

   
 

PGRR080, Updated Responsibilities for Performing GMD Vulnerability Assessments

   

9.

Revision Requests Tabled at ROS (Possible Email vote)

K. Bunch

11:40 a.m.

 

PGRR073, Related to NPRR956, Designation of Providers of Transmission Additions

   
 

NOGRR195, Generator Voltage Control Tolerance Band

   
 

NOGRR199, Related to NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols

   

10.

Planning Working Group (PLWG)

T. Cook

12:00 p.m.

 

NPRR994, Clarify Generator Interconnection Neutral Project Classification (Possible Email Vote)

   
 

PGRR076, Improvements to Generation Resource Interconnection or Change Request (GINR) Process (PLWG) (Possible Email Vote)

   
 

PGRR077, DC Tie Planning Assumptions (PLWG) (Possible Email Vote)

   
 

PGRR078, Market Data Transparency Update for Planning Postings (Possible Email Vote)

   

11.

Operations Training Group (OTWG)

Tammie. Chilton

12:15 p.m.

 

OTWG Scope (Possible Email Vote)

   

12.

Other Business

K. Bunch

12:20 p.m.

 

Posted Reports for Working Groups

   
 

Performance Disturbance Compliance Working Group (PDCWG)

   
 

Network Data Support Working Group (NDSWG )

   
 

System Protection Working Group (SPWG )

   
 

Steady State Working Group (SSWG)

   
 

Planning Geomagnetic Disturbance Task Force (PGDTF )

   
 

Review Open Action Items

   
 

No Report:

   
 

Black Start Working Group (BSWG)

   
 

Dynamic Working Group (DWG)

   
 

Operations Working Group (OWG)

   
 

Voltage Profile Working Group (VPWG)

   
 

Adjourn

K. Bunch

12:30 p.m.

Scheduled ros Meetings

Key Documents

Apr 30, 2020 - docx - 36.9 KB
May 7, 2020 - docx - 823.1 KB
Apr 10, 2020 - docx - 558.6 KB
May 5, 2020 - pptx - 76.9 KB
May 1, 2020 - pptx - 93.7 KB
May 6, 2020 - pptx - 1.4 MB
Apr 30, 2020 - pdf - 9.3 KB
Apr 30, 2020 - pptx - 478 KB
Apr 30, 2020 - pptx - 58.2 KB
Apr 30, 2020 - zip - 3.8 MB
May 7, 2020 - zip - 7.7 MB
May 7, 2020 - zip - 7.7 MB
May 7, 2020 - zip - 7.7 MB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.