- Home
- Market Rules
- Issues
- Nodal Protocol Revision Requests
Nodal Protocol Revision Requests
This section contains nodal protocol revision requests (NPRRs) now in the approval process or already approved.
See NPRR Submission Process for access to revision request and comment forms.
Pending
Issue | Title | Next Group |
---|---|---|
NPRR956 | Designation of Providers of Transmission Additions | PRS |
NPRR1070 | Planning Criteria for GTC Exit Solutions | PRS |
NPRR1202 | Refundable Deposits for Large Load Interconnection Studies | PRS |
NPRR1214 | Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk | PRS |
NPRR1226 | Estimated Demand Response Data | BOARD |
NPRR1229 | Real-Time Constraint Management Plan Cost Recovery Payment | BOARD |
NPRR1235 | Dispatchable Reliability Reserve Service as a Stand-Alone Ancillary Service | PRS |
NPRR1238 | Registration of Loads with Curtailable Load Capabilities | TAC |
NPRR1255 | Introduction of Mitigation of ESRs | PRS |
NPRR1263 | Remove Accuracy Testing Requirements for CCVTs | PRS |
NPRR1264 | Creation of a New Energy Attribute Certificate Program | PRS |
NPRR1265 | Unregistered Distributed Generator | PRS |
NPRR1266 | Opt-Out Status Held by a Transmission-Voltage Customer Cannot be Transferred | PRS |
NPRR1267 | Large Load Interconnection Status Report | BOARD |
NPRR1271 | Revision to User Security Administrator and Digital Certificates Opt-out Eligibility | BOARD |
NPRR1272 | Voltage Support at Private Use Networks | PRS |
NPRR1274 | RPG Estimated Capital Cost Thresholds of Proposed Transmission Projects | PRS |
NPRR1275 | Expansion of Qualifying Pipeline Definition for Firm Fuel Supply Service in Phase 3 | PRS |
NPRR1276 | Move OBD to Section 22 – Emergency Response Service Procurement Methodology | BOARD |
NPRR1277 | Revisions to EAL Formula | PRS |
NPRR1278 | Establishing Advanced Grid Support Service as an Ancillary Service | PRS |
NPRR1279 | Reinstate Enhancements to the Exceptional Fuel Cost Process | PRS |
NPRR1280 | Establish Process for Permanent Bypass of Series Capacitor | PRS |
NPRR1281 | Improvements to Alternate FFSS Resource Designation | PRS |
NPRR1282 | Ancillary Service Duration under Real-Time Co-Optimization | BOARD |
NPRR1283 | Modification of SSR Mitigation Timeline | PRS |
NPRR1284 | Guaranteed Reliability Load Process | PRS |
NPRR1285 | Improve Self-Commitment within RUC Opt Out Window | PRS |
NPRR1286 | Establish Multi-Value Criteria for Resiliency-Related Transmission Project Evaluation | PRS |
NPRR1287 | Revisions to Outage Coordination | PRS |
NPRR1288 | Remove Multiple Month Transactions in CRR Auctions | PRS |
NPRR1289 | Option Price Report and Establish 1 MW Bid Minimum | PRS |
NPRR1290 | Gap Resolutions and Clarifications for the Implementation of RTC+B | PRS |
NPRR1291 | Modify Annual Demand Response Report Posting Date and Include Language to Address PUCT SUBST. R. 25.186 | PRS |
Recently approved within the last 30 days
Issue | Title | Approved On |
---|---|---|
NPRR1273 | Appropriate Accounting for ESRs in PRC Calculation | 05/15/2025 |
NPRR1270 | Additional Revisions Required for Implementation of RTC | 05/15/2025 |
NPRR1269 | RTC+B Three Parameters Policy Issues | 05/15/2025 |
NPRR1268 | RTC – Modification of Ancillary Service Demand Curves | 05/15/2025 |
NPRR1256 | Settlement of MRA of ESRs | 05/15/2025 |
NPRR1241 | Firm Fuel Supply Service (FFSS) Availability and Hourly Standby Fee | 05/15/2025 |
NPRR1234 | Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater | 05/15/2025 |
NPRR1190 | High Dispatch Limit Override Provision for Increased Load Serving Entity Costs | 05/15/2025 |