- Home
- Market Rules
- Issues
- Nodal Protocol Revision Requests
Nodal Protocol Revision Requests
This section contains nodal protocol revision requests (NPRRs) now in the approval process or already approved.
See NPRR Submission Process for access to revision request and comment forms.
Pending
Issue | Title | Next Group |
---|---|---|
NPRR956 | Designation of Providers of Transmission Additions | PRS |
NPRR1070 | Planning Criteria for GTC Exit Solutions | PRS |
NPRR1162 | Single Agent Designation for a QSE and its Sub-QSEs for Voice Communications over the ERCOT WAN | PRS |
NPRR1170 | Submission of Gas Supply Disruption | PUCT |
NPRR1179 | Fuel Purchase Requirements for Resources Submitting RUC Fuel Costs | PUCT |
NPRR1180 | Inclusion of Forecasted Load in Planning Analyses | PRS |
NPRR1186 | Improvements Prior to the RTC+B Project for Better ESR State of Charge Awareness, Accounting, and Monitoring | PUCT |
NPRR1188 | Implement Nodal Dispatch and Energy Settlement for Controllable Load Resources | PRS |
NPRR1190 | High Dispatch Limit Override Provision for Increased NOIE Load Costs | PRS |
NPRR1191 | Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater | PRS |
NPRR1193 | Related to SMOGRR027, Move OBD to Settlement Metering Operating Guide – EPS Metering Design Proposal | PUCT |
NPRR1195 | Resource Entity Metering Facilities Maintenance | PUCT |
NPRR1197 | Optional Exclusion of Load from Netting at ERCOT-Polled Settlement (EPS) Metering Facilities which Include Resources | PRS |
NPRR1198 | Congestion Mitigation Using Topology Reconfigurations | PRS |
NPRR1199 | Implementation of Lone Star Infrastructure Protection Act (LSIPA) Requirements | PUCT |
NPRR1200 | Utilization of Calculated Values for Non-WSL for ESRs | PRS |
NPRR1202 | Refundable Deposits for Large Load Interconnection Studies | PRS |
NPRR1205 | Revisions to Credit Qualification Requirements of Banks and Insurance Companies | PRS |
NPRR1206 | Revisions to QSE Operations and Termination Requirements, and Elimination of Providing Certain Market Participant Principal Information | PUCT |
NPRR1207 | Incidental Disclosure of Protected Information and ECEII During ERCOT Control Room Tours | PUCT |
NPRR1208 | Creation of Invoice Report | PUCT |
NPRR1210 | Next Start Resource Test and Load-Carrying Test Frequency | PUCT |
NPRR1211 | Move OBD to Section 22 – Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints | PUCT |
NPRR1212 | Clarification of Distribution Service Provider’s Obligation to Provide an ESI ID | PRS |
NPRR1213 | Allow DGRs and DESRs on Circuits Subject to Load Shed to Provide ECRS and Clarify Language Regarding DGRs and DESRs Providing Non-Spin | PUCT |
NPRR1214 | Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk | PRS |
NPRR1215 | Clarifications to the Day-Ahead Market (DAM) Energy-Only Offer Calculation | PRS |
NPRR1216 | Implementation of Emergency Pricing Program | PRS |
NPRR1217 | Remove Verbal Dispatch Instruction (VDI) Requirement for Deployment and Recall of Load Resources and Emergency Response Service (ERS) Resources | PRS |
NPRR1218 | REC Program Changes Per P.U.C. SUBST. R. 25.173, Renewable Energy Credit Program | PRS |
NPRR1219 | Methodology Revisions and New Definitions for the Report on Capacity, Demand and Reserves in the ERCOT Region (CDR) | PRS |
Recently approved within the last 30 days
There are no recently approved revision request.