MIS LOG IN

Nodal Protocol Revision Requests

This section contains nodal protocol revision requests (NPRRs) now in the approval process or already approved.

See NPRR Submission Process for access to revision request and comment forms.

Pending

Issue Title Next Group
NPRR956 Designation of Providers of Transmission Additions PRS
NPRR1070 Planning Criteria for GTC Exit Solutions PRS
NPRR1162 Single Agent Designation for a QSE and its Sub-QSEs for Voice Communications over the ERCOT WAN PRS
NPRR1170 Submission of Gas Supply Disruption PUCT
NPRR1179 Fuel Purchase Requirements for Resources Submitting RUC Fuel Costs PUCT
NPRR1180 Inclusion of Forecasted Load in Planning Analyses PRS
NPRR1186 Improvements Prior to the RTC+B Project for Better ESR State of Charge Awareness, Accounting, and Monitoring PUCT
NPRR1188 Implement Nodal Dispatch and Energy Settlement for Controllable Load Resources PRS
NPRR1190 High Dispatch Limit Override Provision for Increased NOIE Load Costs PRS
NPRR1191 Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater PRS
NPRR1193 Related to SMOGRR027, Move OBD to Settlement Metering Operating Guide – EPS Metering Design Proposal PUCT
NPRR1195 Resource Entity Metering Facilities Maintenance PUCT
NPRR1197 Optional Exclusion of Load from Netting at ERCOT-Polled Settlement (EPS) Metering Facilities which Include Resources PRS
NPRR1198 Congestion Mitigation Using Topology Reconfigurations PRS
NPRR1199 Implementation of Lone Star Infrastructure Protection Act (LSIPA) Requirements PUCT
NPRR1200 Utilization of Calculated Values for Non-WSL for ESRs PRS
NPRR1202 Refundable Deposits for Large Load Interconnection Studies PRS
NPRR1205 Revisions to Credit Qualification Requirements of Banks and Insurance Companies PRS
NPRR1206 Revisions to QSE Operations and Termination Requirements, and Elimination of Providing Certain Market Participant Principal Information PUCT
NPRR1207 Incidental Disclosure of Protected Information and ECEII During ERCOT Control Room Tours PUCT
NPRR1208 Creation of Invoice Report PUCT
NPRR1210 Next Start Resource Test and Load-Carrying Test Frequency PUCT
NPRR1211 Move OBD to Section 22 – Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints PUCT
NPRR1212 Clarification of Distribution Service Provider’s Obligation to Provide an ESI ID PRS
NPRR1213 Allow DGRs and DESRs on Circuits Subject to Load Shed to Provide ECRS and Clarify Language Regarding DGRs and DESRs Providing Non-Spin PUCT
NPRR1214 Reliability Deployment Price Adder Fix to Provide Locational Price Signals, Reduce Uplift and Risk PRS
NPRR1215 Clarifications to the Day-Ahead Market (DAM) Energy-Only Offer Calculation PRS
NPRR1216 Implementation of Emergency Pricing Program PRS
NPRR1217 Remove Verbal Dispatch Instruction (VDI) Requirement for Deployment and Recall of Load Resources and Emergency Response Service (ERS) Resources PRS
NPRR1218 REC Program Changes Per P.U.C. SUBST. R. 25.173, Renewable Energy Credit Program PRS
NPRR1219 Methodology Revisions and New Definitions for the Report on Capacity, Demand and Reserves in the ERCOT Region (CDR) PRS

Recently approved within the last 30 days