Large Load Integration
This section contains guides and documentation to assist Transmission Service Providers (TSPs), Resource Entities (REs), and Interconnecting Large Load Entities (ILLEs) through the interconnection process for new or modified Large Loads to the ERCOT System. Entities wishing to interconnect a load facility of 75 MW or greater should consult Section 9.2.1 of the ERCOT Planning Guide to determine if the request must go through the Large Load Interconnection process. The guides and documents on this page are used as part of the interconnection process.
Questions on the Large Load interconnection process or the materials on this page may be sent to LargeLoadInterconnection@ercot.com.
Guides Guides
ERCOT Planning Guide
Section 9 of the Planning Guide defines the requirements and processes used to facilitate new or modified Large Load Interconnections.
Forms and Other Documents Forms and Other Documents
Energization Request for New Standalone Large Load
This form must be completed, submitted to ERCOT, and approved prior to the energization of a new Large Load that is not netted with a Generation Resource. Requests to energize a new Large Load netted with a Generation Resource and to increase the amount of load approved to energize at an existing Large Load facility are also covered by other forms in this section.
Jul 18, 2025 - docx - 97 KB