Large Load Working Group (LLWG)

The Large Load Working Group (LLWG) is non-voting body that reports directly to the ERCOT Technical Advisory Committee (TAC) and provides recommendations to TAC under the scope of its Charter.

LLWG is responsible for developing and recommending policies to facilitate the reliable and efficient integration of Large Loads into the ERCOT system. LLWG’s work covers a range of technical and market issues, including planning, operations, and market-related processes for Large Load interconnection and management. LLWG will also review and provide feedback on associated ERCOT market rules and Revision Requests.

All documents and information from the previous Large Flexible Load Task Force (LFLTF) that was replaced by the LLWG can be found here: Large Flexible Load Task Force.

ERCOT has initiated an extensive stakeholder process to address challenges created by the rapid increase in Large Load interconnection requests. The ultimate goal of the process is a new Large Load interconnection process, referred to as the "Batch Study process.” ERCOT envisions a Batch Study process that will group Large Loads that meet certain stringent requirements into a single study to provide Large Load Customers with study efficiency, consistency, transparency, and certainty while maintaining a system-wide focus on reliability.

View ERCOT’s stakeholder engagement plan and the upcoming milestones regarding development of the Batch Study process framework.

Date

Meeting

Purpose

Link

12/18/2025 PUCT - Open Meeting Introduction Link to Meeting
1/15/2026 PUCT - Open Meeting Update Link to Meeting
01/21/2025 Technical Advisory Committee (TAC) Overview Link to Meeting
01/22/2026 Large Load Working Group Overview Link to Meeting
01/29/2026 PUCT - Open Meeting Update Link to Meeting
02/03/2026 ERCOT Workshop Draft Framework Link to Meeting
02/06/2026 PUCT - Open Meeting Update Link to Meeting
02/10/2026 ERCOT Board of Directors Meeting Overview Link to Meeting
02/12/2026 ERCOT Workshop Feedback Review and Next Steps Link to Meeting
02/19/2026 Large Load Working Group Batch Study Next Steps Link to Meeting
02/20/2026 PUCT - Open Meeting Update Link to Meeting
02/26/2026 Batch Study Process for Large Load Interconnections Workshop #3 Batch Study Draft Revision Request Link to Meeting
03/10/2026 Batch Study Process for Large Load Interconnections Workshop #4 Batch Study Revision Request(s) Discussion Link to Meeting
03/11/2026 PRS Meeting Batch Study Revision Request(s) Discussion Link to Meeting
03/24/2026 Batch Study Process for Large Load Interconnections Workshop #5 Batch Study Revision Request(s) Discussion Link to Meeting
03/25/2026 TAC TBD Link to Meeting
03/30/2026 Batch Study Process for Large Load Interconnections Workshop #6 Batch Study Revision Request(s) Discussion TBD
TBD Batch Study Process for Large Load Interconnections Workshop #7 Batch Study Revision Request(s) Discussion TBD
04/15/2026 PRS Batch Study Revision Request(s) Discussion Link to Meeting
04/20-04/21/2026 ERCOT Board of Directors Meeting TBD Link to Meeting
04/22/2026 Special PRS Batch Study Revision Request(s) Discussion Link to Meeting
04/29/2026 TAC Batch Study Revision Request(s) Discussion Link to Meeting
05/06/2026 PRS Batch Study Revision Request(s) Discussion Link to Meeting
05/13/2026 Special TAC Batch Study Revision Request(s) Discussion Link to Meeting
05/19/2026 Two-Day TAC Meeting - Day 1 Batch Study Revision Request(s) Discussion Link to Meeting
05/20/2026 Two-Day TAC Meeting - Day 2 Batch Study Revision Request(s) Discussion Link to Meeting

Contact Information


Chair:  Bob Wittmeyer

Vice Chair:  Patrick Gravois


!  Send an email to this group: llwg@lists.ercot.com or Subscribe to this email list.