MIS LOG IN

Power Operations Bulletins 2003 Archive

Date Subject Bulletin No.
12/10/2003 Procedure when OOMEing Combined Cycle Units Off Line - Transmission & Security Deskand 58 (doc – 41.5 KB)
12/04/2003 Replace RRS Through a Bilateral Trade - Operating Period Desk 57 (doc – 43.5 KB)
12/02/2003 Replace RRS Through a Bilateral Trade - Frequency Control Desk 56 (doc – 43 KB)
12/02/2003 Revision to the Transmission and Security Desk 55 (doc – 50 KB)
12/02/2003 Revision to Day Ahead Desk 54 (doc – 42 KB)
11/11/2003 Revision to Day Ahead Desk 53 (doc – 49.5 KB)
10/15/2003 Revision to Day Ahead Desk Procedure 52 (doc – 37.5 KB)
10/17/2003 Revision to Day Ahead Desk 51 (doc – 39 KB)
10/15/2003 Revision to the Frequency Control Desk 50 (doc – 39.5 KB)
10/15/2003 Revision to the Transmission and Security Desk 49 (doc – 39 KB)
10/15/2003 Revision to Operating Period Desk 48 (doc – 33.5 KB)
10/10/2003 Revision to Frequency Control Desk 47 (doc – 33.5 KB)
10/10/2003 Revision to Transmission and Security Desk 46 (doc – 37.5 KB)
10/09/2003 Revision of Operating Period Desk 45 (doc – 32.5 KB)
10/02/2003 Temporary solution to provide TOs with information on Planned Outages that require movement of generation 44 (doc – 32 KB)
10/02/2003 Revision to the Operating Procedures 43 (doc – 34 KB)
10/02/2003 Revision of Operating Period Desk Procedures 42 (doc – 34 KB)
10/02/2003 Revision of Transmission and Security Desk 41 (doc – 34.5 KB)
09/30/2003 Revision to the Transmission and Security Desk Procedures 40 (doc – 34 KB)
09/30/2003 Revision of the Operating Period Desk Procedures 39 (doc – 34 KB)
09/30/2003 Revision of Frequency Control Desk Procedures 38 (doc – 34 KB)
09/30/2003 Revision of Day-Ahead Desk Procedures 37 (doc – 34 KB)
09/30/2003 Revision of Direct Current Ties Procedures 36 (doc – 34 KB)
09/16/2003 Procedure when OOMEing Combined Cycle Units Off Line 35 (doc – 31.5 KB)
09/04/2003 Revision of Operating Procedures 34 (doc – 34.5 KB)
08/27/2003 Revised the Forced/Level 1 Outage Information Sheet 33 (doc – 26 KB)
08/27/2003 Actual Start and End Entries - Outage Scheduler Enhancements 32 (doc – 22 KB)
07/25/2003 Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis 31 (doc – 621 KB)
07/24/2003 Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis 30 (doc – 29.5 KB)
07/16/2003 Revision of Operating Procedures Development and Maintenance 29 (doc – 32.5 KB)
07/14/2003 Revision of Cancelled Outages 28 (doc – 32.5 KB)
07/14/2003 Revision of timeline for BES 27 (doc – 33.5 KB)
07/08/2003 Revision of Operating Procedures 26 (doc – 33 KB)
06/30/2003 Revision of Operating Procedures 25 (doc – 33.5 KB)
06/25/2003 Revision of Operating Procedures 24 (doc – 33.5 KB)
06/19/2003 Load Shed Ratios assigned to Transmission Operators in ERCOT for shedding firm load during step 4 of EECP 23 (doc – 27 KB)
06/06/2003 Voltage Collapse of Bryan-College Station Area April 15,2003 22 (doc – 33 KB)
05/28/2003 Revision of Operating Procedures 21 (doc – 33.5 KB)
05/21/2003 Revision of Operating Procedures 20 (doc – 33.5 KB)
05/09/2003 Revision of Operating Procedures 19 (doc – 34.5 KB)
04/29/2003 Revision of Operating Procedures 18 (doc – 66 KB)
04/01/2003 Revision of Operating Procedures 17 (doc – 33.5 KB)
03/06/2003 Revision of Operating Procedures 15 (doc – 28.5 KB)
02/13/2003 Revision of Operating Procedures 14 (doc – 28.5 KB)
01/07/2003 Revision of Operating Procedures 13 (doc – 81 KB)
01/07/2003 Revision of Operating Procedures 12 (doc – 33.5 KB)