NPRR1197
Summary
Title
Optional Exclusion of Load from Netting at ERCOT-Polled Settlement (EPS) Metering Facilities which Include Resources
Next Group
PUCT
Next Step
PUCT for consideration
Status
Pending
Voting Record
Date
Gov Body
Motion
Result
04/23/2024
BOARD
To recommend approval of NPRR1197 as recommended by TAC in the 3/27/24 TAC Report
Passed
03/27/2024
TAC
To recommend approval of NPRR1197 as recommended by PRS in the 3/20/24 PRS Report
Passed
03/20/2024
PRS
To endorse and forward to TAC the 2/8/24 PRS Report and 2/28/24 Impact Analysis for NPRR1197
Passed
02/08/2024
PRS
To recommend approval of NPRR1197 as amended by the 2/7/24 Oncor comments as revised by PRS
Passed
10/12/2023
PRS
To table NPRR1197 and refer the issue to WMS
Passed
Background
Status:
Pending
Date Posted:
Aug 31, 2023
Sponsor:
Engie
Urgent:
No
Sections:
10.3.2.3 and 11.1.6
Description:
This Nodal Protocol Revision Request (NPRR) adds the ability for Resources to separately meter and settle Load(s) located behind the EPS metering point at the Resource’s POI.
Reason:
General system and/or process improvement(s)
ERCOT-Lockup-white