Agenda

 1.

Antitrust Admonition

Sandeep Borkar  

    9:30 a.m.

 2.

Agenda Review

Sandeep Borkar  


 3.

Approval of ROS Meeting Minutes (Possible Vote)

Sandeep Borkar



  • April 2, 2026



 4.

Technical Advisory Committee (TAC) Update

Sandeep Borkar


 5.

ERCOT Reports and Updates


    9:40 a.m.


  • Operations Report   

Alex Lee



  • System Planning Report   

Ping Yan 

   


  • ISM2 Future Ready Program/NPRR1306 Update

Nisha Bhatia


 6.

ROS Revision Requests (Vote)

Sandeep Borkar

   10:10 a.m. 


Language Review




  • NOGRR287, Load Shed Provisions to Identify and Minimize Overlap of Essential Loads

ERCOT


 7.

Black Start Working Group (BSWG)

Michael Dieringer

   10:30 a.m.

 8.

Dynamics Working Group (DWG)

Aditi Upadhyay

   10:40 a.m.

 9.

Inverter-Based Resource Working Group (IBRWG)

Julia Matevosyan

   10:50 a.m.

10.

Network Data Support Working Group (NDSWG)

Teddi Flessner

   11:00 a.m.

11.

Performance, Disturbance, Compliance Working Group (PDCWG)

Bracy Nesbit

   11:10 a.m.

12.

Steady State Working Group (SSWG) (Possible Vote)

Chris Ramirez

   11:20 a.m.


  • SSWG Procedures



13.

Voltage Profile Working Group (VPWG)

Charles Aleman

   11:30 a.m.

16.

Planning Working Group (PLWG)

Mina Turner

   11:40 a.m.

17.

Tabled Revision Requests (Possible Vote)

Sandeep Borkar

   11:50 a.m.


NOGRRs




  • NOGRR273, Related to NPRR1264, Creation of a New Energy Attribute Certificate Program




  • NOGRR284, Related to NPRR1310, Dispatchable Reliability Reserve Service Plus Energy Storage Resource Participation and Release Factor




  • NOGRR286, Addition of 765-kV Operational Voltage Limits (VPWG)




PGRRs




  • PGRR073, Related to NPRR956, Designation of Providers of Transmission Additions 




  • PGRR122, Reliability Performance Criteria for Loss of Load (DWG, PLWG)




  • PGRR123, Related to NPRR1264, Creation of a New Energy Attribute Certificate Program




  • PGRR124, ESR Maintenance Exception to Modifications (DWG, PLWG)




  • PGRR126, Related to NPRR1284, Guaranteed Reliability Load Process (PLWG)




  • PGRR128, Regional Transmission Plan Review of Grid Enhancing Technologies (PLWG)




  • PGRR130, Related to NPRR1295, GTC Exit Solutions (PLWG)




  • PGRR134, Interconnection Studies Reform for Dispatchable Loads (PLWG)




  • PGRR136, Large Load Interconnection Study Scope Documentation




  • PGRR138, Large Load Interconnection Study Review and Approval Process




  • PGRR140, Related to NPRR1317, Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation (NDSWG, PLWG)




  • PGRR141, Large Load Interconnection Study Reform for Substantiated Load (PLWG)




  • PGRR142, In-kind Definition for Generation (DWG, PLWG)




  • PGRR144, Dynamic Model Submission and Review Requirements for Large Loads including Large Electronic Loads (DWG, PLWG)




RRGRRs




  • RRGRR038, Related to NPRR1264, Creation of a New Energy Attribute Certificate Program




NPRRs




  • NPRR1272, Voltage Support at Private Use Networks (PLWG, VPWG)




  • NPRR1278, Establishing Advanced Grid Support Service as an Ancillary Service (OWG)




  • NPRR1284, Guaranteed Reliability Load Process (PLWG)




  • NPRR1286, Establish Multi-Value Criteria for Resiliency-Related Transmission Project Evaluation (PLWG)




  • NPRR1295, GTC Exit Solutions (PLWG)




  • NPRR1317, Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation (NDSWG, PLWG)




  • NPRR1319, Modifications to Seasonal Mothball Periods and Clarification to Evaluation Process




Break


  12:30 p.m.

18.

PGRR145, Batch Zero Process for Large Load Interconnections (Possible Vote)


   1:00 p.m.

19.

Combo Ballot (Vote)

Sandeep Borkar

   2:45 p.m.

20.

Other Business

Sandeep Borkar

   3:00 p.m.


  • Review Open Action Items List




  • No Report




    • Meter Working Group (MWG)




    • Operations Training Working Group (OTWG)




    • Operations Working Group (OWG)




    • System Protection Working Group (SPWG)




Adjourn

Sandeep Borkar

   3:15 p.m.

Scheduled ROS Meetings

Key Documents

May 8, 2026 - xls - 109 KB
May 8, 2026 - xls - 97 KB
Apr 30, 2026 - docx - 32.1 KB
Apr 30, 2026 - doc - 299 KB
Apr 30, 2026 - docx - 615.9 KB
Apr 30, 2026 - docx - 436.3 KB
Apr 30, 2026 - pptx - 47.8 KB
Apr 30, 2026 - pptx - 50.7 KB
May 5, 2026 - pptx - 2.4 MB
Apr 30, 2026 - docx - 409.6 KB
Apr 30, 2026 - pptx - 52.2 KB
May 4, 2026 - pptx - 68.5 KB
May 7, 2026 - pptx - 1.2 MB
May 6, 2026 - zip - 26.5 MB
May 6, 2026 - zip - 24 MB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.