PGRR101 |
Related to NPRR1133, Clarify Responsibilities for Submission of Planning Model Data for DC Ties |
PGRR102 |
Dynamic Operation Model Improvement |
PGRR103 |
Establish Time Limit for Generator Commissioning Following Approval to Synchronize |
PGRR104 |
Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process |
PGRR106 |
Clarify Projects Included in Transmission Project Information and Tracking (TPIT) Report |
PGRR107 |
Related to NPRR1180, Inclusion of Forecasted Load in Planning Analyses |
PGRR108 |
Related to NPRR1183, ECEII Definition Clarification and Updates to Posting Rules for Certain Documents without ECEII |
PGRR109 |
Dynamic Model Review Process Improvement for Inverter-Based Resource (IBR) Modification |
PGRR110 |
Revision to Accommodate Steady-State Node-Breaker Modeling |
PGRR112 |
Dynamic Data Model and Full Interconnection Study (FIS) Deadline for Quarterly Stability Assessment |
PGRR113 |
Related to NPRR1198, Congestion Mitigation Using Topology Reconfigurations |
PGRR114 |
Related to NPRR1212, Clarification of Distribution Service Provider’s Obligation to Provide an ESI ID |
PGRR115 |
Related to NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater |
PGRR116 |
Related to NPRR1240, Access to Transmission Planning Information |
PGRR117 |
Addition of Resiliency Assessment and Criteria to Reflect PUCT Rule Changes |
PGRR118 |
Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era |
PGRR119 |
Stability Constraint Modeling Assumptions in the Regional Transmission Plan |