MIS LOG IN

PGRR107

Summary

Title Related to NPRR1180, Inclusion of Forecasted Load in Planning Analyses
Next Group ROS
Next Step Language Consideration
Status Pending

Action

Date Gov Body Action Taken Next steps
06/08/2023 ROS Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
06/08/2023 ROS to table PGRR107 and refer the issue to the Planning Working Group (PLWG) Passed

Background

Status: Pending
Date Posted: May 11, 2023
Sponsor: Oncor
Urgent: No
Sections: 3.1.2.1, 3.1.3, 3.1.4.1, 3.1.4.2, 3.1.7, 4.1.1.1
Description: This Planning Guide Revision Request (PGRR) aligns the Planning Guide with NPRR1180. PGRR107 revises the Planning Guide to address recent amendments to P.U.C. SUBST. R. 25.101, Certification Criteria, which became effective on December 20, 2022. Specifically, PGRR107 incorporates the requirement in P.U.C. SUBST. R. 25.101(b)(3)(A)(ii)(II) for any review conducted by ERCOT to incorporate the historical Load, forecasted Load growth, and additional Load seeking interconnection, in ERCOT’s analysis. PGRR107 also requires a Regional Planning Group (RPG) project submitter to provide such information to ERCOT, when available, for inclusion in ERCOT’s planning analyses.
Reason: Regulatory requirements

Key Documents

Related Content