MIS LOG IN

PGRR038

Summary

Title Require ERCOT to Report Circuits Loaded Above 95% of Their Facility Rating
Next Group
Next Step
Status Approved on 08/12/2014
Effective Dates
09/01/2014

Action

Date Gov Body Action Taken Next steps
08/12/2014 BOARD Approved
07/31/2014 TAC Recommended for Approval ERCOT Board for consideration.
07/10/2014 ROS Recommended for Approval TAC for consideration.

Voting Record

Date Gov Body Motion Result
08/12/2014 BOARD To approve PGRR038 as recommended by TAC in the 7/31/14 TAC Report. Passed
07/31/2014 TAC To recommend approval of PGRR038 as recommended by ROS in the 7/10/14 ROS Report. Passed
07/10/2014 ROS To recommend approval of PGRR038 as revised by ROS with Option 1. Passed

Background

Status: Approved
Date Posted: May 21, 2014
Sponsor: ERCOT
Urgent: No
Sections: 3.1.1.2
Description: This Planning Guide Revision Request (PGRR) requires ERCOT to report when circuits are loaded above 95% of their Facility Rating for single contingency events in the annual Regional Transmission Plan.
Reason: Addresses current operational issues; and Other: The Operations and Planning Synchronization Task Force (OPSTF) identified several factors that could lead to overloads in operations that were not observed in planning studies. This PGRR will require ERCOT to report circuits that are near overload so that planners are aware of them.

Key Documents

Related Content