NPRR1299
Summary
Title | Clarifications to Emergency Response Service (ERS) |
---|---|
Next Group | PRS |
Next Step | Impact Analysis Consideration |
Status | Pending |
Action
Date | Gov Body | Action Taken | Next Steps |
---|---|---|---|
09/17/2025 | PRS | Recommended for Approval | Impact Analysis Consideration |
Voting Record
Date | Gov Body | Motion | Result |
---|---|---|---|
09/17/2025 | PRS | to recommend approval of NPRR1299 as amended by the 9/16/25 ERCOT comments | Passed |
Background
Status: | Pending |
---|---|
Date Posted: | Sep 2, 2025 |
Sponsor: | ERCOT |
Urgent: | No |
Sections: | 3.14.3.1, 3.14.3.4, and 8.1.3.1.2 |
Description: | This Nodal Protocol Revision Request (NPRR) addresses four independent issues related to Emergency Response Service (ERS): 1) Paragraph (5)(c) of Section 3.14.3.1 is incorrectly included as a subparagraph of paragraph (5) and instead should be paragraph (6) of Section 3.14.3.1. 2) In paragraph (3)(j) of Section 3.14.3.4 the ERS Preliminary Baseline Review Results document is being removed from the Market Information System (MIS) posting list because it is a legacy report that is no longer needed. The information previously provided by the posting of that document has been replaced by the mandatory ERS Resource Identification (ERID) process to get this information and is no longer applicable or being requested by Qualified Scheduling Entities (QSEs). 3) A timing change to paragraph (6) of Section 3.14.3.4 provides flexibility for the ERS offer posting requirement so that instead of posting exactly on the 60th day after the first day of the ERS Standard Contract Term (SCT) there will now be a window for posting no sooner than 60 days and no later than 65 days after the first day of the ERS SCT. 4) A change to paragraph (2) of Section 8.1.3.1.2 clarifies that for non-weather sensitive ERS Loads to be classified as co-located with an ERS Generator, both must be awarded in the same service type and for all the same ERS Time Periods. This has been an issue when both are offered into the same service type and/or Time Periods but for various reasons not awarded. |
Reason: | General system and/or process improvement(s) |