MIS LOG IN

NPRR1200

Summary

Title Utilization of Calculated Values for Non-WSL for ESRs
Next Group PRS
Next Step Language Consideration
Status Pending

Action

Date Gov Body Action Taken Next steps
10/12/2023 PRS Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
10/12/2023 PRS to table NPRR1200 and refer the issue to WMS Passed

Background

Status: Pending
Date Posted: Sep 14, 2023
Sponsor: NextEra Energy
Urgent: No
Sections: 10.2.4
Description: This Nodal Protocol Revision Request (NPRR) permits Energy Storage Resources (ESRs) with unmetered non-Wholesale Storage Load (WSL) from system protection equipment such as current-limiting reactors to utilize calculated auxiliary Load values when the non-WSL from the protective equipment is less than 15 kWh per charge cycle.
Reason: Strategic Plan Objective 2

Key Documents

Related Content