- Home
- Market Rules
- Issues
NOGRR289
Summary
| Title | Extension for LCL Cooling Load Ride-Through Compliance |
|---|---|
| Next Group | ROS |
| Next Step | ROS for consideration |
| Status | Pending |
Action
| Date | Gov Body | Action Taken | Next Steps |
|---|---|---|---|
| 08/06/2026 | ROS | Deferred/Tabled | ROS for consideration |
Voting Record
| Date | Gov Body | Motion | Result |
|---|---|---|---|
| 08/06/2026 | ROS | To grant NOGRR289 Urgent status and to table NOGRR289 | Passed |
Background
| Status: | Pending |
|---|---|
| Date Posted: | Jul 21, 2026 |
| Sponsor: | SB Energy |
| Urgent: | Yes |
| Sections: | 2.6.4 and 2.15 |
| Description: | This Nodal Operating Guide Revision Request (NOGRR) permits a Large Computational Load (LCL) to achieve compliance with the applicable ride-through requirements within 365 days after its in-service date where the LCL’s cooling load is unable to satisfy such requirements as of the in-service date due to ongoing design and manufacturing limitations, including constraints associated with vendors’ continued adaptation of chiller and Variable Frequency Drive (VFD) equipment to the applicable standards. |
| Reason: | General system and/or process improvement(s) |
Key Documents
Jul 21, 2026 - docx - 44.7 KB
Aug 7, 2026 - xls - 138 KB
Aug 7, 2026 - docx - 45.7 KB
Aug 7, 2026 - docx - 24.3 KB