MIS LOG IN

SMOGRR027

Summary

Title Move OBD to Settlement Metering Operating Guide – EPS Metering Design Proposal
Next Group WMS
Next Step Language Consideration
Status Pending

Action

Date Gov Body Action Taken Next steps
09/06/2023 WMS Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
09/06/2023 WMS to table SMOGRR027 and refer the issue to the Metering Working Group (MWG) Passed

Background

Status: Pending
Date Posted: Aug 9, 2023
Sponsor: ERCOT
Urgent: No
Sections: 3.4 and 12 Attachment A (new)
Description: This Settlement Metering Operating Guide Revision Request (SMOGRR) moves the EPS Metering Design Proposal from the Other Binding Document List into the Settlement Metering Operating Guide to standardize the approval process, and amends the design proposal form to require additional information identifying any and all Distribution Service Providers (DSPs) that have the right to serve a project. The amendments also make clear that this requirement does not apply to Wholesale Storage Load (WSL), and deletes references to the Resource Asset Registration Form (RARF) in the ERCOT-Polled Settlement (EPS) Metering Design Proposal form.
Reason: Administrative; Regulatory requirements

Key Documents