MIS LOG IN

NPRR854

Summary

Title NOIE TDSP Submittal of Meters with Bidirectional Flow Caused by Generation Interconnected at Distribution Voltage
Next Group
Next Step
Status Approved on 04/10/2018
Effective Dates
08/09/2018

Action

Date Gov Body Action Taken Next steps
04/10/2018 BOARD Approved
02/22/2018 TAC Recommended for Approval Revision Request Consideration
02/08/2018 PRS Recommended for Approval Revision Request Consideration
01/18/2018 PRS Recommended for Approval Impact Analysis Consideration
12/14/2017 PRS Deferred/Tabled Language Consideration

Voting Record

Date Gov Body Motion Result
04/10/2018 BOARD approved NPRR854 as recommended by TAC in the 2/22/18 TAC Report Passed
02/22/2018 TAC to recommend approval of NPRR854 as recommended by PRS in the 2/8/18 PRS Report. Passed
02/08/2018 PRS to endorse and forward to TAC the 1/18/18 PRS Report and the Impact Analysis for NPRR854 with a recommended priority of 2018 and rank of 2160 Passed
01/18/2018 PRS to recommend approval of NPRR854 as submitted Passed
12/14/2017 PRS to table NPRR854 and refer the issue to WMS Passed

Background

Status: Approved
Date Posted: Nov 14, 2017
Sponsor: South Texas Electric Coop., Inc. (STEC)
Urgent: No
Sections: 10.2.2, 10.2.3
Description: This Nodal Protocol Revision Request (NPRR) removes the ERCOT Polled Settlement (EPS) Meter requirement for Non Opt-In Entity (NOIE) points of delivery that realize bi-directional flows as a result of generation that is interconnected to the Distribution System. NOIE Transmission and/or Distribution Service Providers (TDSPs) would assume the responsibility for supplying ERCOT with this meter data.
Reason: Market efficiencies or enhancements

Key Documents

Related Content