MIS LOG IN

RPG Meeting

July 29, 2025
09:30 AM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Rooms A and B
Teleconference: 877-668-4493
Meeting number: 2556 446 6507
Meeting password: UTHmG2

Comments

The PLWG meeting will begin following the conclusion of the RPG meeting and will share the same WebEx information.   


Agenda

1.

Antitrust Admonition


9:30 a.m.

2.

Miscellaneous Updates

ERCOT

9:35 a.m.

3.

2025 Regional Transmission Plan (RTP) Economic Study: Stability Interface Limits

ERCOT

9:40 a.m.

4.

EIR Status Update – Baytown Area Load Addition Project

ERCOT

10:00 a.m.

5.

EIR Status Update – Connell 345/138-kV Switch and Connell to Rockhound 345-kV Double-Circuit Line Project

ERCOT

10:10 a.m.

6.

EIR Status Update – Muscovy and Voss Lake 345/138-kV Project

ERCOT

10:20 a.m.

7.

EIR Status Update – BEC Hamilton County Conversion Project

ERCOT

10:30 a.m.

8.

EIR Status Update – Texas A&M University System RELLIS Campus Reliability Project

ERCOT

10:40 a.m.

9.

EIR Status Update – Southern DFW Load Interconnection and General Grid Strengthening Project

ERCOT

10:50 a.m.

10.

Reactive Power Planning Project Overview

CPS Energy

11:00 a.m.

11.

Helotes 345/138-kV Switching Station & Autotransformer Addition at Eastside Switching Station Project Overview

CPS Energy

11:10 a.m.

12.

ERCOT Independent Review Combined Scope: Reactive Power Planning Project & Helotes 345/138-kV Switching Station and Autotransformer Addition at Eastside Switching Station Project

ERCOT

11:20 a.m.

13.

Ammonia Plant Load Project Overview

STEC

11:30 a.m.

14.

ERCOT Independent Review Scope: Ammonia Plant Load Project

ERCOT

11:40 a.m.

15.

Nueces Green Ammonia Load Interconnection Project Overview

STEC

11:50 a.m.

16.

ERCOT Independent Review Scope: Nueces Green Ammonia Load Interconnection Project

ERCOT

12:00 p.m.

17.

Childress Area Transmission Improvement Project Overview

AEPSC

12:10 p.m.

18.

ERCOT Independent Review Scope: Childress Area Transmission Improvement Project

ERCOT

12:20 p.m.

19.

2025 RTP Assumptions

ERCOT

12:30 p.m.

20.

Adjourn

ERCOT

1:00 p.m.

Scheduled RPG Meetings

Key Documents

Jul 28, 2025 - pptx - 4.1 MB
Jul 28, 2025 - pptx - 3.2 MB
Jul 29, 2025 - pdf - 428.4 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content