MIS LOG IN

NPRR623

Summary

Title Measurement and Evaluation of ERS
Next Group
Next Step
Status Withdrawn

Action

Date Gov Body Action Taken Next steps
06/11/2014 PRS Deferred/Tabled PRS for consideration.

Voting Record

Date Gov Body Motion Result
06/11/2014 PRS To table NPRR623 and to refer the issue to WMS. Passed

Background

Status: Withdrawn
Date Posted: May 8, 2014
Sponsor: Good Company Associates
Urgent: No
Sections: 3.14.3.3, 8.1.3.1.2, 8.1.3.1.4
Description: This Nodal Protocol Revision Request (NPRR) proposes minor technical modification to the Protocols to explicitly account for the possibility that an ERS Load, and the ERS Generation located behind the same Point of Interconnection (POI) to the ERCOT Transmission Grid, can both jointly, or independently, provide ERS services and be evaluated appropriately, regardless of the operating characteristics of the industrial facility and its ERS baseline assignment.
Reason: Addresses current operational issues. Administrative Regulatory requirements Other: Clarifies ability of ERCOT to use available data to measure output /contribution of Resources in a configuration not fully anticipated in the Protocols.

Key Documents

Related Content