MIS LOG IN

NPRR1066

Summary

Title Interconnection of Existing Generation Owned by a Municipally Owned Utility (MOU) or Electric Cooperative (EC) Transferring Load into the ERCOT System
Next Group
Next Step
Status Approved on 04/13/2021
Effective Dates
05/01/2021

Action

Date Gov Body Action Taken Next steps
04/13/2021 BOARD Approved
03/24/2021 TAC Recommended for Approval Revision Request Consideration
03/11/2021 PRS Recommended for Approval Revision Request Consideration
02/11/2021 PRS Recommended for Approval Impact Analysis Consideration

Voting Record

Date Gov Body Motion Result
04/13/2021 BOARD to approve NPRR1066 as recommended by TAC in the 3/24/21 TAC Report Passed
03/24/2021 TAC to recommend approval of NPRR1066 as recommended by PRS in the 3/11/21 PRS Report Passed
03/11/2021 PRS to endorse and forward to TAC the 2/11/21 PRS Report and Impact Analysis for NPRR1066 Passed
02/11/2021 PRS to recommend approval of NPRR1066 as revised by PRS Passed

Background

Status: Approved
Date Posted: Jan 27, 2021
Sponsor: ERCOT
Urgent: No
Sections: 1.6.5 and 7.4
Description: This Nodal Protocol Revision Request (NPRR) grants ERCOT the discretion to apply existing standards that are applicable to older Generation Resources registered with ERCOT (a “grandfathered” standard) to an existing generation unit owned by a Municipally Owned Utility (MOU) or Electric Cooperative (EC) that is transferring Load into ERCOT and seeks to interconnect the existing generation unit to the ERCOT Transmission Grid in conjunction with the Load transfer. ERCOT will only apply a grandfathered standard if the MOU or EC provides a written explanation as to why it cannot comply with the standard imposed on new Generation Resources, and demonstrates to ERCOT’s satisfaction that allowing the generation unit to comply with the grandfathered standard is reasonable and will not create a risk to reliability of the ERCOT System. This NPRR also clarifies that, should an MOU or EC interconnect an older generation unit to the ERCOT Transmission System as part of a Load integration, the unit will not qualify the MOU or EC to receive Pre-Assigned Congestion Revenue Rights (PCRRs).
Reason: Addresses current operational issues

Key Documents

Related Content