MIS LOG IN

NOGRR252

Summary

Title Related to NPRR1176, Update to EEA Trigger Levels
Next Group ROS
Next Step Language Consideration
Status Pending

Action

Date Gov Body Action Taken Next steps
No updates have been made to this issue.

Voting Record

Date Gov Body Motion Result
No updates have been made to this issue.

Background

Status: Pending
Date Posted: Apr 25, 2023
Sponsor: ERCOT
Urgent: No
Sections: 4.2.2, 4.5.3, and 4.5.3.1
Description: This Nodal Operating Guide Revision Request (NOGRR) aligns Nodal Operating Guide language with NPRR1176, which revises the Energy Emergency Alert (EEA) procedures to require a declaration of EEA Level 3 when Physical Responsive Capability (PRC) cannot be maintained above 1,500 MW and will require ERCOT to shed firm Load to recover 1,500 MW of reserves within 30 minutes, modifies the trigger levels for EEA Level 1 and EEA Level 2, changes the trigger for ERCOT’s consideration of alternative transmission ratings or configurations from Advisory to Watch when PRC drops below 3,000 MW, and restores a frequency trigger for the declaration of EEA Level 3 if the steady-state frequency drops below 59.8 Hz for any period of time.
Reason: Addresses current operational issues

Key Documents