NPRR1077 |
Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs |
NPRR1078 |
Clarification of Potential Uplift |
NPRR1079 |
Day-Ahead Market RRS / ECRS 48-Hour Report Clarification |
NPRR1080 |
Limiting Ancillary Service Price to System-Wide Offer Cap |
NPRR1081 |
Revisions to Real-Time Reliability Deployment Price Adder to Consider Firm Load Shed |
NPRR1082 |
Emergency Response Service (ERS) Test Exception for Co-located ERS Loads |
NPRR1083 |
Modification of Uplift Allocation Rules to Address Role of Central Counter-Party Clearinghouses |
NPRR1084 |
Improvements to Reporting of Resource Outages, Derates, and Startup Loading Failures |
NPRR1085 |
Ensuring Continuous Validity of Physical Responsive Capability (PRC) and Dispatch through Timely Changes to Resource Telemetry and Current Operating Plans (COPs) |
NPRR1086 |
Recovery, Charges, and Settlement for Operating Losses During an LCAP Effective Period |
NPRR1087 |
Prohibit Participation of Critical Loads as Load Resources or ERS Resources |
NPRR1090 |
ERS Winter Storm Uri Lessons Learned Changes and Other ERS Items |
NPRR1091 |
Changes to Address Market Impacts of Additional Non-Spin Procurement |
NPRR1092 |
Reduce RUC Offer Floor and Limit RUC Opt-Out Provision |
NPRR1093 |
Load Resource Participation in Non-Spinning Reserve |
NPRR1094 |
Allow Under Frequency Relay Load to be Manually Shed During EEA3 |
NPRR1095 |
Texas SET V5.0 Changes |
NPRR1096 |
Require Sustained Two-Hour Capability for ECRS and Four-Hour Capability for Non-Spin |
NPRR1097 |
Create Resource Forced Outage Report |
NPRR1098 |
Direct Current Tie (DC Tie) Reactive Power Capability Requirements |
NPRR1099 |
Managing Network Operations Model Resource Nodes |
NPRR1100 |
Allow Generation Resources and Energy Storage Resources to Serve Customer Load When the Customer and the Resource are Disconnected from the ERCOT System |