MIS LOG IN

NOGRR029

Summary

Title Synchronization of OGRR224, Special Protection System (SPS) Operations Under No Contingency
Next Group
Next Step
Status Approved on 01/06/2010
Effective Dates
12/01/2010

or per the Nodal Protocol Transition Plan http://www.ercot.com/mktrules/protocols (02/01/10 Nodal Operating Guide Library)

Action

Date Gov Body Action Taken Next steps
01/06/2010 TAC Approved
12/10/2009 ROS Recommended for Approval TAC Consideration
10/21/2009 OWG Recommended for Approval OWG consider the Recommendation Report and Impact Analysis

Voting Record

Date Gov Body Motion Result
01/06/2010 TAC To approve NOGRR029 as recommended by ROS in the 12/10/10 ROS Recommendation Report. Passed
12/10/2009 ROS To recommend approval of NOGRR029 as recommended by OWG in the 11/17/09 OWG Recommendation Report Passed
10/21/2009 OWG Consensus to recommend approval of NOGRR029 as submitted. Passed

Background

Status: Approved
Date Posted: Sep 2, 2009
Sponsor: John Dumas
Urgent: No
Sections: 6.2.1, Introduction 6.2.2 Design and Operating Requirements for ERCOT System Facilities
Description: This Nodal Operating Guide Revision Request (NOGRR) adds addtional monitoring and control requirements for Special Protection Systems (SPSs) that involve generation reduction to synchronize the Nodal Operating Guides with OGRR224.
Reason: ERCOT observed several SPS operations in 2008 that occurred under normal loading without any system disturbances. This NOGRR presented herein places an obligation on Resource owners who have an SPS to monitor fthe flows monitored by the SPS in the base case and reduce output as needed before the arming point of the SPS is reached.

Key Documents