MIS LOG IN

MWG Meeting by Webex only

March 31, 2021
09:00 AM - 12:15 PM

Comments

Agenda

1.

Anti-Trust Admonition and Introduction

D. Breshears

9:00 AM

2.

Introduction of Chair/Vice Chair

D. Tucker

9:05 AM

3.

Update on NPRR1020 and SMOGRR024

D. Tucker

9:10 AM

4.

Loss of Telemetry Update

S. Nuckolls

9:30 AM

5.

Update on Line Loss Compensation Language Changes

D. Tucker

9:50 AM

6.

Discuss requests being received for connecting ESR (BESS) Auxiliary Loads to a throw over scheme to determine if the MWG has an interest in presenting the concept to WMS for direction to investigate

D. Tucker

10:00 AM

7.

Discuss requests being received for Metering Auxiliary Loads instead of the WSL behind a POI to determine if the MWG has an interest in presenting the concept to WMS for direction to investigate

D. Tucker

10:30 AM

8.

Discuss the possible utilization of TDSP Metering for EPS Metered Generation connected to a DSP system to determine if the MWG has an interest in presenting the concept to WMS for direction to investigate

D. Tucker

11:00 AM

9.

Reports on EPS Activities

S. Nuckolls/D. Maul

11:30 AM

10.

Standing reminder on NPRR949 implementation date of 1/1/2023

D. Breshears

11:45 AM

11.

New or other Business Items

D. Breshears

12:00 PM

12.

Meeting Summary and Closing Remarks

D. Breshears

12:10 PM

 

End of Meeting

 

12:15 PM

 

Deferred Open Action Items List

 

 
 

Voltage throw over schemes

   
 

Design proposal update to remove RARF

   

Scheduled mwg Meetings

Key Documents

Mar 25, 2021 - docx - 22.6 KB
Mar 25, 2021 - pptx - 129.8 KB
Mar 25, 2021 - pptx - 206.7 KB
Apr 2, 2021 - docx - 22.9 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content