MIS LOG IN

Retail Metering Working Group Meeting

September 18, 2009
09:30 AM - 03:30 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Teleconference: 866-469-3239
Meeting number: 351 378 161
Meeting password: Meter123!!

Agenda

1

Antitrust Admonition

 

T. Bates

  9:30 a.m.

 

2

Introductions

T. Bates

  9:35 a.m.

 

3

Discuss the Process for Changing IDR to AMS

  • Overview
  • Continue to review the following scenarios:
    • ESI IDs above the mandatory threshold that have an IDR meter installed
    • ESI IDs currently below the mandatory threshold with an advanced meter where the demand moves above the threshold
    • ESI IDs currently below the threshold with an IDR meter
    • ESI IDs currently above the threshold with an IDR meter where the demand moves below the threshold
  • Open Questions
    • Does the advanced meter need to be replaced with an IDR meter?
    • Can customers request to have an IDR meter replaced with an advanced meter?
    • If the IDR meter is replaced can the TDSP charge the AMS surcharge?
    • Is the TDSP allowed to install an advanced meter and maintain the IDR meter profile and existing TX SET data transmission process?
    • What are the market expectations for a new Premise that has an estimated load over 700 kW / kVA?  Does the TDSP install an advanced meter or an IDR?
  • Review & Draft Protocol language in support of RMWG recommendations
  • Review the RMG for possible updates to IDR meter install and remove revisions
  • Review timing of feedback from REP to TDSP

T. Bates / M. McCabe

  9:40 a.m.

 

 

 

 

 

 

Break

Team

10:15 a.m.

 

 

 

 

4

Discuss the Process for Changing IDR to AMS (continued)

T. Bates / M. McCabe

10:30 a.m.

 

 

 

 

 

Lunch

Team

11:30 a.m.

 

 

 

 

5

Discuss the Process for Changing IDR to AMS (continued)

T. Bates / M. McCabe

12:45 p.m.

 

Break

 

Team

  2:15 p.m.

 

 

Break

 

 

 

 

 

 

6

Discuss the Process for Changing IDR to AMS (continued)

T. Bates / M. McCabe

  2:30 p.m.

 

 

 

 

7

Other Business

 

 

  3:15 p.m.

 

Adjourn

 

  3:30 p.m.

Scheduled rmwg Meetings

Key Documents

Sep 30, 2009 - doc - 51.5 KB
Sep 21, 2009 - pdf - 182.7 KB
Aug 28, 2009 - doc - 40.5 KB
Sep 18, 2009 - doc - 101 KB
Sep 18, 2009 - doc - 57 KB
Sep 18, 2009 - doc - 121 KB
Sep 14, 2009 - doc - 258.5 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content