MIS LOG IN

SCR770

Summary

Title Revision to Outage Scheduler Entry for Resource Maintenance Outage Level Designation
Next Group
Next Step
Status Approved on 05/15/2012

Action

Date Gov Body Action Taken Next steps
05/15/2012 BOARD Approved
04/05/2012 TAC Recommended for Approval ERCOT Board Consideration
03/29/2012 PRS Recommended for Approval TAC consideration
02/23/2012 PRS Recommended for Approval PRS review the Impact Analysis

Voting Record

Date Gov Body Motion Result
05/15/2012 BOARD To approve SCR770 as recommended by TAC in the 4/5/12 TAC Report. Passed
04/05/2012 TAC To recommend approval of SCR770 as recommended by PRS in the 3/22/12 PRS Report Passed
03/29/2012 PRS To endorse and forward the 2/23/12 PRS Report and Impact Analysis for SCR770 to TAC with a recommended priority of 2013 and rank of 700.
02/23/2012 PRS To recommend approval of SCR770 as submitted. Passed

Background

Status: Approved
Date Posted: Jan 18, 2012
Sponsor: Luminant Energy Company LLC
Urgent: No
Sections: Not applicable
Description: This System Change Request (SCR) will make a change to the Outage Scheduler system so that the Qualified Scheduling Entity (QSE) is able to schedule Level I, II and III Maintenance Outages in a way that coincides with the definition of these Maintenance Outages shown in Protocol Section 2.1. Currently the data entry into the Outage Scheduler allows the user to enter the start of the proposed Outage only and the system infers from that the Maintenance Level of the Outage. However, there are instances where the start of the Outage can actually be earlier than that required by the designated Maintenance Level. The system needs to be changed so that the user can enter the requested start date of the Outage separately from the duration of time allowed before the maintenance would prevent a Forced Outage.
Reason: The current Outage Scheduler system does not allow the user to provide all of the information ERCOT needs for optimal and precise Outage scheduling and actually could infer information in an incorrect way. The system needs to request additional information to adequately inform ERCOT of the need for a Maintenance Outage.

Key Documents

Related Content