- Home
- Market Rules
- Issues
PRR399
Summary
| Title | IDR Replacement with Non-IDR Meter Requirements |
|---|---|
| Next Group | |
| Next Step | |
| Status | Withdrawn |
Action
| Date | Gov Body | Action Taken | Next Steps |
|---|---|---|---|
| No updates have been made to this issue. | |||
Voting Record
| Date | Gov Body | Motion | Result |
|---|---|---|---|
| No updates have been made to this issue. | |||
Background
| Status: | Withdrawn |
|---|---|
| Date Posted: | Apr 15, 2003 |
| Sponsor: | Center Point Energy |
| Urgent: | Yes |
| Sections: | 18.6.1 & 18.6.6 |
| Description: | This revision allows 1) IDR installations where they are needed or required and provide the most effective utilization of this type of reporting to ERCOT; and 2) Removal of IDR installations that are no longer valid for a premise or ESI ID because of reduced load or consumption based upon 12-month consecutive usage data. |
| Reason: |
Key Documents
Apr 24, 2003 - doc - 57.5 KB
Apr 15, 2003 - doc - 86 KB
Jun 25, 2003 - doc - 71.5 KB
Apr 24, 2003 - doc - 61 KB