This Nodal Operating Guide Revision Request (NOGRR) addresses the implementation of an electronic Real-Time operations communication tool under System Change Request (SCR) 820, Operator Real-Time Messaging During Emergency, which facilitated the development of the system/tool without revising the Nodal Operating Guide. Therefore, this NOGRR (together with companion NPRR1355) makes the revisions needed for SCR820's implementation. This NOGRR: 1) Adds a new process for Dispatch Instructions issued via Electronic Real-Time Operations Communications as a supplement to the established Verbal Dispatch Instruction (VDI) process; 2) Provides an additional method by which a Transmission Operator (TO) may receive ERCOT's pre- and post-contingency “System Operating Limit” (SOL) exceedances communicated by ERCOT under Section 3.7; and 3) Updates references that currently require verbal notice via the Hotline.