Title Related to NPRR1355, Implementation of Electronic Real-Time Operations Communications
Next Group ROS
Next Step Language Consideration
Status Pending

Action

Date Gov Body Action Taken Next Steps
No updates have been made to this issue.

Voting Record

Date Gov Body Motion Result
No updates have been made to this issue.

Background

Status: Pending
Date Posted: Nov 24, 2026
Sponsor: ERCOT
Urgent: No
Sections: 2.2.9.1, 2.6.1, 3.1.3, 3.7, 4.1, 4.2.1, 4.2.2, 4.2.3, 4.2.4, 4.5.3, 4.5.3.2, 4.5.3.3, 4.5.3.5
Description: This Nodal Operating Guide Revision Request (NOGRR) addresses the implementation of an electronic Real-Time operations communication tool under System Change Request (SCR) 820, Operator Real-Time Messaging During Emergency, which facilitated the development of the system/tool without revising the Nodal Operating Guide. Therefore, this NOGRR (together with companion NPRR1355) makes the revisions needed for SCR820's implementation. This NOGRR: 1) Adds a new process for Dispatch Instructions issued via Electronic Real-Time Operations Communications as a supplement to the established Verbal Dispatch Instruction (VDI) process; 2) Provides an additional method by which a Transmission Operator (TO) may receive ERCOT's pre- and post-contingency “System Operating Limit” (SOL) exceedances communicated by ERCOT under Section 3.7; and 3) Updates references that currently require verbal notice via the Hotline.
Reason: General system and/or process improvement(s)