NOGRR291

Summary

Title Alignment of Criteria for Exemptions from LCL Ride-Through Requirements with Batch Zero
Next Group ROS
Next Step ROS for language consideration
Status Pending

Action

Date Gov Body Action Taken Next Steps
No updates have been made to this issue.

Voting Record

Date Gov Body Motion Result
No updates have been made to this issue.

Background

Status: Pending
Date Posted: Nov 17, 2026
Sponsor: ERCOT
Urgent: No
Sections: 2.6.4 and 2.15
Description: This Nodal Operating Guide Revision Request (NOGRR) aligns criteria for Large Computational Loads (LCL) to be exempt from the frequency and voltage ride-through requirements that were approved in NOGRR282, Board Priority - Large Computational Load Ride-Through Requirements, with the eligibility criteria for inclusion in Batch Zero introduced in Planning Guide Revision Request (PGRR) 145, Batch Zero Process for Large Load Interconnections. In order to be exempt from frequency and voltage ride-through requirements, the LCL must also have been included in Batch Zero as base load in accordance with Planning Guide Section 9.2.1.1 Eligibility Criteria for Inclusion of a Large Load as Base Load not Subject to Additional Study in the Batch Zero Process.
Reason: General system and/or process improvement(s)