MIS LOG IN

NOGRR075

Summary

Title Synchronization with NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI
Next Group
Next Step
Status Rejected on 08/11/2011

Action

Date Gov Body Action Taken Next steps
08/11/2011 ROS Rejected
07/20/2011 OWG Recommended for Rejection ROS Consideration
06/15/2011 OWG Deferred/Tabled OWG Language Consideration

Voting Record

Date Gov Body Motion Result
08/11/2011 ROS To reject NOGRR075 as recommended by OWG in the 7/20/11 OWG Report Passed
07/20/2011 OWG Consensus to recommend rejection of NOGRR075
06/15/2011 OWG Consensus to table NOGRR075 for one month. Passed

Background

Status: Rejected
Date Posted: May 19, 2011
Sponsor: APX Power Markets
Urgent: No
Sections: 4.5.3.3
Description: This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI, which adds an additional requirement for ERCOT to indicate which time period is being dispatched during their Emergency Interruptible Load Service (EILS) Verbal Dispatch Instruction (VDI) to the Qualified Scheduling Entity (QSE) Hotline during EEA Level 2B.
Reason: To synchronize the Nodal Operating Guides with NPRR363.

Key Documents