MIS LOG IN

OWG Meeting

November 18, 2010
09:30 AM - 03:00 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Dial-In: 512-225-7260
Dial-In Code: 4341

Agenda

 

Antitrust Admonition

Owens

9:30 AM

1.

ROS meeting Report - 049NOGRR Alignment with NERC Reliability Standard PRC-001-1, System Protection Coordination. Approved by ROS

Owens

 

2.

OWG meeting note’s approval

ALL

 

3.

OGRRs and NOGRRs for review and language changes:

  • 044NOGRR Clarification of a PSS In-Service.  This Nodal Operating Guide Revision Request (NOGRR) clarifies that a Power System Stabilizer (PSS) must be On and in an active MW range to be considered in service.  This NOGRR also updates the specific dates of PSS installation from 2008 to 2011. [LCRA]

IA Review and vendor comments. Table for one month.

  • ROS approved the NOGRR043 (OWG comments) as amended by ROS.  ROS directed OWG to resolve the issue relating to the language change made in Section 2.9.1, 1)b): (note turbines was revised to WGRs) A draft NOGRR will be submitted to address this issue. ERCOT Planning and Wind Coalition.
  • 052NOGRR Conductor/Transformer Facility Rating. This NOGRR adds the Conductor/Transformer rating normally used as Rate C in the Annual Planning Models as a fourth Transmission facility rating required to be provided by Transmission Service Providers (TSPs). [ERCOT] Language Consideration - Possible NDSWG Comments Tabled for one month.

 

ALL

 

 

 

 

 

 

 

 

   

 

4.

Operations Report 

  • Monthly Operations Report Summary/Questions 

 

ERCOT

 

5.

Nodal Operating Guides Review and Revision Task Force Report.

 

Owens

 

6.

Operations Task Force Report - update on Voltage Profile issues with +/- 2 % or +/- 5 % of nominal. Action for OTF to complete assignment.

 

Morris/Blackmer

 

7.

Black Start Task Force Report

 

 

R. Kelm

Kelly Blackmer

 

8.

Compliance Report

 

Texas RE

 

9.

System Operations

 

ERCOT

 

10.

Other items.

Review draft NOGRR and NPRR for Black Start

 

ALL

 

 

Adjourn

 

ALL

 

Scheduled owg Meetings

Key Documents

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content