MIS LOG IN

Congestion Management Working Group Meeting

July 22, 2008
09:30 AM - 03:30 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Dial-In: 512-225-7278
Dial-In Code: 5712

Agenda

All Times Are Approximate. We strive to adhere to the agenda, but changes may occur. 

1

Open Meeting/ Anti-Trust Admonition

M. Wagner

9:30-9:35

2

Shadow Price Cap for Nodal

- review existing capabilities of ABB System

- review ERCOT proposal

- discuss merits of ERCOT proposal

- discuss alternate proposal for graduated SP cap penalty

- discuss merits of alternate proposal

R. Surendran

S. Siddiqi

D. Jones

 

9:35-11:45

3

Lunch

 

 

11:45 - 1

4

Update on NàS issue of 1 MW - What caused this? What line upgrades are needed to get N - S above 100 MW? Does this need to be referred to RPG?

 

ERCOT Planning/Operations

1-1:30

5

2009 CSC Evaluation Update/Discussion

 

ERCOT/Group

1:30-3:15

6

Review & Next steps

 Topics for Upcoming CMWG:

 Outage Coordination - Develop recommendation on how to break up Outage Coordination issue per instruction from 7/16/08 WMS

 CCT - Update from ERCOT on data sets, type of conversion process underway, status of evaluation process

 Stability Studies - any update on plan for validating methodology for low load/high wind? What are seasonal sensitivities for stability studies

M. Wagner

3:15-3:30

Scheduled cmwg Meetings

Key Documents

2009 CSC_comments20080718
2009 CSC proposal comments
Jul 18, 2008 - doc - 26.5 KB
2009 CSC_comments20080721
Compiled CSC comments
Jul 21, 2008 - doc - 30.5 KB
2009_CSC_Cluster_Data
Shift factor data for CSC scenarios
Jul 16, 2008 - zip - 2.1 MB
2009_CSC_Study20080716
2009 CSC Study
Jul 21, 2008 - zip - 7.4 MB
Jul 21, 2008 - pdf - 150.8 KB
SingletonProject_update20080718
Singleton project update by CenterPoint
Jul 18, 2008 - ppt - 3.8 MB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.