MIS LOG IN

Operations Working Group (OWG) Meetings

July 17, 2013
09:30 AM - 03:00 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Rooom 168
Dial-In: 512-874-5430
Dial-In Code: 5635

Agenda

1.

Antitrust Admonition

Owens

9:30 am

2.

ROS Meeting Report - ROS remanded NOGRR110 back to OWG and SCR774.

Owens

 

3.

OWG meeting notes approval:  June meeting notes review and approval.

All

 

4.

NOGRRs for review and language changes:

  • 104NOGRR Removal of Transmission Operator Definition from the Nodal Operating Guide. This Nodal Operating Guide Revision Request (NOGRR) proposes deleting the definition of Transmission Operator from the Nodal Operating Guides. [ERCOT] Language Review New Comments?  Tabled
  • 110NOGR Synchronization with NPRR529, Congestion Management Plan.  This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guide with revisions proposed by NPRR529, Congestion Management Plan. [ERCOT] Language Review
  • 111NOGRR Synchronization with NPRR527, Required Combined Cycle Telemetry for Operational Awareness and PDCWG Analysis.  This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guide with NPRR527, Required Combined Cycle Telemetry for Operational Awareness and PDCWG Analysis, requires Combined Cycle Generation Resources to telemeter individual High Sustainable Limits (HSLs) for gas and steam turbines.  The HSLs for combustion and steam turbines were previously submitted in zonal and ERCOT requests this practice be resumed in the nodal. [ERCOT] Language Review
  • 114NOGRR Synchronization with NPRR540, Clarification of Credible Single Contingency.  This Nodal Operating Guide Revision Request (NOGRR) revises the use of Credible Single Contingency to align with actual practice and with NPRR540. [OWG]
  • 116NOGRR Synchronization with NPRR542, Clarification of the Use of Emergency Condition.  This Nodal Operating Guide Revision Request (NOGRR) clarifies the use of Emergency Condition and synchronizes the Nodal Operating Guides with NPRR542. [OWG] IA Review. NPRR542 was tabled at PRS, may need to table until next month.
  • 118NOGRR Hydro Responsive Test Reporting.  This Nodal Operating Guide Revision Request (NOGRR) revises the requirement for ERCOT to develop a monthly report related to hydro responsive tests to a quarterly report. [ERCOT] IA Review
  • 120NOGRR Black Start Plan Template Revision. This NOGRR provides substantial additional details and clarifications to the Black Start Plan Template. (BSWG) Language review
  • 528NPRR Clarification of Assessment of Chronic Congestion.  This Nodal Protocol Revision Request (NPRR) consolidates into one section, the steps ERCOT will take when active or binding transmission constraints are identified. [ERCOT]
  • 529NPRR Congestion Management Plan.  This Nodal Protocol Revision Request (NPRR) defines Congestion Management Plan (CMP) and several subcategories such as a Mitigation Plan and a Remedial Action Plan (RAP) and clarifies actions to be taken when Security-Constrained Economic Dispatch (SCED) is unable to resolve a constraint causing a security violation. [ERCOT]
  • 540NPRR Clarification of Credible Single Contingency.  This Nodal Protocol Revision Request (NPRR) revises the use of Credible Single Contingency to align with actual practice. [OWG]
  • 542NPRR Clarification of the Use of Emergency Condition.  This Nodal Protocol Revision Request (NPRR) clarifies the use of Emergency Condition in the Nodal Protocols.  [OWG] Review
  • SCR774 Enhancement to Outage Scheduler and Reports.  This System Change Request (SCR) adds fields to the Outage Scheduler in order to provide information on changes to approved Outages, and adds a report on cancelled Outages. [Edison Mission] ROS directive to review for final comments.

All

 

5.

Operations Report

  • Monthly Operations Report Summary/Questions

ERCOT

 

6.

Operations Task Force Report

  • Action Items: Assignments Pending.

Morris/Blackmer

 

7.

Texas RE Update Report

Penney

 

8.

System Operations Report

  • Operating Procedure changes that impact market participants. POB 631, 632, 633, 634, 635 and 636.

ERCOT

 

9.

Seminar Task Force Report

  • Update on 2014 Operations Training Seminar.

ERCOT/Allgower

 

10.

Other:

  • For group discussion - We may have a sample from OTF for verifying RARF data vs Real-time Reactive testing each calendar year. Final Scorecard
  • Review OWG Draft Proposal for ERCOT Fundamentals Task Force (EFTF)
  • Review OWG Scope for revisions

All

 

11.

Future Meeting Date: Wednesday August 21st, 2013 at the ERCOT Met Center room 168.

Owens

 

 

Adjourn

Owens

3:00 pm

Scheduled owg Meetings

Key Documents

Jul 15, 2013 - doc - 71.5 KB
Jul 15, 2013 - doc - 48 KB
Jul 15, 2013 - doc - 56.5 KB
Jul 15, 2013 - doc - 53.5 KB
Jul 15, 2013 - doc - 27.5 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content