Controllable Load Resource Base Point Deviation Charge for Under-Consumption Variables
The Controllable Load Resource Base Point Deviation Charge for under-consumption variables XU and YU shall be posted to the MIS Public Area after TAC approval. Replaced by NP6-653-M upon the Implementation of RTC+B PR447-03. Link to remain until December 2026.