NPRR977 |
Create MIS Posting for RUC Cancellations |
NPRR978 |
Alignment with Amendments to PUCT Substantive Rule 25.505 |
NPRR979 |
Incorporate State Estimator Standards and Telemetry Standards into Protocols |
NPRR980 |
Accounting for NSO Forced Outages and GINR Inactive Projects in the Report on the Capacity, Demand and Reserves in the ERCOT Region |
NPRR982 |
Alignment of Block Load Transfer (BLT) Requirements Between Protocols and Nodal Operating Guide |
NPRR983 |
Delete Remaining Grey-Boxed Language Associated with NPRR257, Synchronization with Nodal Operating Guide Section 9, Monitoring Programs and Changes to Posting Requirements of Documents Considered CEII |
NPRR984 |
Change ERS Standard Contract Terms |
NPRR985 |
Modify Forward Adjustment Factors to Include Pricing for the Current Operating Day |
NPRR986 |
BESTF-2 Energy Storage Resource Energy Offer Curves, Pricing, Dispatch, and Mitigation |
NPRR987 |
BESTF-3 Energy Storage Resource Contribution to Physical Responsive Capability and Real-Time On-Line Reserve Capacity Calculations |
NPRR988 |
Correction to Conditions for DAM Award Eligibility for PTP Obligations with Links to an Option |
NPRR989 |
BESTF-1 Energy Storage Resource Technical Requirements |
NPRR990 |
Relocation of Combined Cycle Train to Resource Attribute |
NPRR992 |
Updated Day-Ahead Liability for NPRR863, Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve |
NPRR993 |
Grey Box Resolution re NPRR902 and NPRR928 |
NPRR994 |
Clarify Generator Interconnection Neutral Project Classification |
NPRR995 |
RTF-6 Create Definition and Terms for Settlement Only Energy Storage |
NPRR996 |
Alignment of Hub Bus Names Between Protocols and ERCOT Model |
NPRR997 |
Natural Gas Pipeline Coordination Requirements for Resource Entities with Natural Gas Generation Resources |
NPRR998 |
ERS Deployment and Recall Messages |
NPRR999 |
DC Tie Ramp Limitations |
NPRR1000 |
Elimination of Dynamically Scheduled Resources |