| NPRR926 |
Removal of 90-Day Period Between SSR Study Approval and Synchronization |
| NPRR927 |
Administrative Changes for April 1, 2019 Nodal Protocols – Update ERCOT Email Address |
| NPRR928 |
Cybersecurity Incident Notification |
| NPRR929 |
PTP Obligations with Links to an Option DAM Award Eligibility |
| NPRR930 |
Process, Pricing, and Cost Recovery for Delayed Resource Outages |
| NPRR931 |
As Built Hub Average Calculation |
| NPRR932 |
Addition of Load to Existing Load Zone |
| NPRR933 |
Reporting of Demand Response by Retail Electric Providers and Non-Opt-In Entities |
| NPRR935 |
Post All Wind and Solar Forecasts |
| NPRR936 |
CRR Account Holder Limits |
| NPRR937 |
Distribution Voltage Level Block Load Transfer (BLT) Deployment |
| NPRR939 |
Modification to Load Resources Providing RRS to Maintain Minimum PRC on Generators During Scarcity Conditions |
| NPRR940 |
Removal of Language Related to NPRR664, Fuel Index Price for Resource Definition and Real-Time Make-Whole Payments for Exceptional Fuel Cost Events |
| NPRR941 |
Create a Lower Rio Grande Valley Hub |
| NPRR942 |
Clarification of Revised Transaction Limit Posting |
| NPRR943 |
Holiday Schedule Update |
| NPRR944 |
As Built Day-Ahead Market Energy Bid Curve Submission Validation |
| NPRR945 |
Net Metering Requirements |
| NPRR948 |
Instrument Transformer Testing Schedule and Removal of Reference to Fiber-Optic Current Transformers |
| NPRR949 |
January 1, 2023 Changes to EPS Meter Communications Path |
| NPRR950 |
Switchable Generation Resources Providing Black Start Service |