MIS LOG IN

Operations Working Group (OWG) Meetings

October 16, 2013
09:30 AM - 03:00 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Dial-In: 512-874-5430
Dial-In Code: 5635

Agenda

1.

Antitrust Admonition

Warren

9:30 am

2.

ROS Meeting Report No new assignments

Warren

 

3.

OWG meeting notes approval:  September meeting notes review and approval.

All

 

4.

NOGRRs for review and language changes:

  • 121NOGRR ERCOT Operator Certification Program and ERCOT Fundamentals Manual.  This Nodal Operating Guide Revision Request (NOGRR) describes ERCOT’s responsibilities with respect to the ERCOT operator certification program and ERCOT Fundamentals Manual. (ERCOT) IA Review
  • 122NOGRR CRR Network Model Clarification for Accepted Outages. This Nodal Operating Guide Revision Request (NOGRR) aligns the Operating Guides with current practice by clarifying that approved as well as accepted Transmission Outages in the Outage Scheduler are utilized in ERCOT’s Congestion Revenue Rights (CRR) Auction at the time of building the CRR Network Model. ( ERCOT ) IA Review
  • 123NOGRR Revisions to Misoperations Reporting Requirements.  This Nodal Operating Guide Revision Request (NOGRR) clarifies the reporting requirements for misoperations to ERCOT and Texas Reliability Entity (OWG). IA Review
  • 124NOGRR Additional VRT Requirement for IRRs. This Nodal Operating Guide Revision Request (NOGRR) specifies new high Voltage Ride-Through (VRT) requirements for Intermittent Renewable Resources (IRRs) and prohibits IRRs from tripping for events that are less severe than the defined thresholds and occur for shorter time durations. (  ) Language Review
  • 125NOGRR Minimum Notice for Coordinated Reactive Testing. This Nodal Operating Guide Revision Request (NOGRR) changes the minimum advance notification for a coordinated reactive capability test of a Generation Resource from 48 hours prior, to 1700 the day prior to the day of the test. (    ) Language Review

All

 

5.

Operations Report

  • Monthly Operations Report Summary/Questions

ERCOT

 

6.

Operations Task Force Report

  • Action Items: Assignments Pending.

Morris/Blackmer

 

7.

Texas RE Update Report

  • Standards Updates

Penney

 

8.

System Operations Report

  • Operating Procedure changes that impact market participants.

ERCOT

 

9.

Seminar Task Force Report

  • Update on 2014 Operations Training Seminar.

ERCOT/Allgower

 

10.

Other:

  • For group discussion Review Draft Calendar for OWG Meetings in 2014.

All

 

11.

Future Meeting Date: Wednesday November 20th, 2013 at the ERCOT Met Center room 168.

Warren

 

 

Adjourn

Warren

3:00 pm

Scheduled owg Meetings

Key Documents

Oct 16, 2013 - doc - 58.5 KB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.