OWG Meeting

July 23, 2015
09:30 AM - 03:30 PM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 168
Teleconference: 877-668-4493
Meeting number: 294 095 119
Meeting password: owg0723

Agenda

1.

Antitrust Admonition

M. Carter

9:30 am

2.

ROS Meeting Report --

M. Carter

 

3.

Mod-025 update

Sherry L.

9:45 am

4.

NOGRRs for review and language changes:

  • NOGRR146 Alignment with NPRR708, Clarifying ERCOT Actions During Energy Emergency Alerts. This Nodal Operating Guide Revision Request (NOGRR) revises the Energy Emergency steps to include concepts discussed during the 4/2/15 Energy Emergency Alerts (EEA) Workshop which will improve the management of EEA.  Specifically, this NOGRR aligns the Nodal Operating Guide with changes proposed in Nodal Protocol Revision Request (708), Clarifying ERCOT Actions during Energy Emergency Alerts, with the Nodal Operating Guides. [ERCOT]MOD-025 Discuss issues associated with 40% of resources being tested.  Coordination with ERCOT Operations for summer 2015 tests.  Possible revisions to ERCOT Nodal Protocols, Operating Guides and NDCRC test forms to harmonize with NERC standard.(impact analysis review)                                                                               
  • NOGRR143 Alignment of Nodal Operating Guides with NERC Reliability Standard, BAL-001-TRE-1. This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guides with North American Electric Reliability Corporation (NERC) Reliability Standard, BAL-001-TRE-1. [PDCWG] (language review)
  • NOGRR145 Alignment with NPRR705, Provides Consistency for References to the End Date of the Generation Interconnection Process.  In the Resource Interconnection Handbook, the term "commercial operations" has a different meaning to Resource Entities and financial institutions involved in construction and financing of Generation Resources than it does in the context of performance testing by ERCOT for new Generation Resources.  This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guides with NPRR705 by replacing various terms used to refer to the date on which Generation Resources complete the Resource interconnection process with the proposed defined terms "Commercial Operations Date" and "Resource Commissioning Date" to provide consistency for references to the end of the generation interconnection process. [ERCOT](language review)
  • NOGRR147 Reactive Power Testing Requirements. This Nodal Operating Guide Revision Request (NOGRR) revises the language in Section 3.3.2.1, Corrected Unit Reactive Limits (CURL), to harmonize the ERCOT reactive testing requirements with the recently approved North American Electric Reliability Corporation (NERC) Reliability Standards.  [Luminant](language review)
  • NOGRR148 Administrative Changes for August 1, 2015 Nodal Operating Guides. This Administrative Nodal Operating Guide Revision Request (NOGRR) updates the ERCOT Load Shed Table to reflect Transmission Operator designation forms submitted by Market Participants and to reflect the 2014 peak Load percentages. [ERCOT](no action required FYI)
  • NPRR713 Reactive Power Testing Requirements. This Nodal Protocol Revision Request (NPRR) revises the language in Section 8.1.1.2.1.4, Voltage Support Service Qualification, to reference the reactive power testing requirements in the Nodal Operating Guides and reflect the revisions to harmonize the Nodal Protocol requirements with recently approved North American Electric Reliability Corporation (NERC) Reliability Standards. [Luminant](language review)

 

All

 

5.

ROS update Voltage discussion

S. Solis

 

6.

ERCOT operations Report

ERCOT

 
 

LUNCH

   

7.

Texas RE Update Report

  • ROS Update EMS Support working group

M. Henry

1:00 pm

8.

Other:

J. Warren

1:15 pm

 

Adjourn

 

3:30 pm