Emergency Interruptible Load Service
ERCOT procures Emergency Interruptible Load Service (EILS) by selecting qualified Loads to make themselves available for interruption in an electric grid emergency. EILS is an emergency load reduction service designed to decrease the likelihood of the need for firm Load shedding (a.k.a, “rolling blackouts”). Customers meeting EILS criteria may bid to provide the service through their qualified scheduling entities (QSEs). EILS is authorized by Public Utility Commission Substantive Rule §25.507.
All submittals for the FebMay 2012 contract period must be on the new version of the EILS Submission Form (12.1). Please read carefully the affirmations on the Identification page as they have changed. Form is posted under Forms & Supporting Documents.
 | |
 | |
 |
-
EILS Submission Form Instructions
Updated: 07/06/2011
(12/22/11, .doc, 52 KB)
-
12.1 EILS Submission Form
Updated: 11/15/2011
(11/15/11, .xls, 118 KB)
-
EILS Update
Updated: January 4, 2012
(01/04/12, .ppt, 2.8 MB)
-
Process for Determining Cost Limits & Reasonableness of Bids
Updated: 02/13/09
(02/13/09, .pdf, 23.4 KB)
-
Unavailability Submission Instructions
Updated: 07/06/2011
(07/06/11, .doc, 48.5 KB)
-
Unavailability Submission Form
Updated: 07/06/2011
(08/03/11, .xls, 2.3 MB)
-
Default Baseline Methodolgy
Updated: April 2009
(04/03/09, .doc, 384 KB)
-
EILS Split Deployment Methodology
(11/10/10, .ppt, 205 KB)
-
Appendix A - Supplement to QSE Agreement
Updated: 11/11/10
(06/23/11, .doc, 40 KB)
-
Notification of Self Provision Form
Updated: 11/11/10
(08/25/09, .doc, 54.5 KB)
-
QSE-Third Party EILS Pre-Qual Testing Procedures
(11/11/10, .doc, 59.5 KB)
-
EILS Substitution Test Affidavit
Updated: 11/11/10
(11/11/10, .doc, 38 KB)
-
Preliminary Baseline Review Process
Updated: 11/10/10
(11/10/10, .doc, 34 KB)
-
EILS Non-IDR Guidelines
(07/21/08, .doc, 49.5 KB)
-
EILS Non-IDR Proposal Form & Affidavit
(07/21/08, .doc, 67 KB)
-
EILS Technical Workshop 2.0
Presented 02-16-2010
(02/16/10, .ppt, 256.5 KB)
|
 |
-
Descriptions of Accepted Interval Data File Formats
New format added! Now accepting Excel formats!
(05/05/11, .doc, 37.5 KB)
-
Excel Data Column format example
New!
(05/05/11, .xls, 30 KB)
-
Excel Data Column format Fall dst example
New!
(05/05/11, .xls, 29 KB)
-
Excel Data Column format Spring dst example
New!
(05/05/11, .xls, 26.5 KB)
-
Interval Data ERCOT Standard format example
(10/30/09, .csv, 30.5 KB)
-
Interval Data Column format Fall dst example
(02/18/10, .csv, 1.1 KB)
-
Interval Data Column format Spring dst example
(02/18/10, .csv, 840 Bytes)
-
Interval Data Column format example
(10/30/09, .csv, 4.1 KB)
-
Interval Data LS format example
(11/02/09, .zip, 2.4 KB)
-
Interval Data LSE format example
(11/02/09, .zip, 591 Bytes)
-
Interval Data MV90 lotus format example
(10/30/09, .csv, 18.3 KB)
-
Affidavit for IDR Meter Data
(11/13/09, .doc, 36 KB)
|
Archives
 |
-
EILS Procurement for Oct2011-Jan 2012 Contract Period
(10/24/11, .doc, 38.5 KB)
-
Procurement Schedule
Oct11-Jan12
(06/21/11, .doc, 44.5 KB)
-
EILS Request for Proposal
Oct11-Jan12 Final
(07/15/11, .doc, 126.5 KB)
-
EILS Tech Requirements Oct11-Jan12_FINAL
Oct11-Jan12 Final
(09/21/11, .doc, 266 KB)
-
EILS Tech Requirements & Scope of Work v1
Oct11-Jan12 Final
(07/15/11, .doc, 289.5 KB)
-
Appendix A_EILS Submission Form
EILS Technical Requirements & Scope of Work
(07/20/11, .xls, 3.3 MB)
-
Appendix B_Non-Interval Metering Requirements
EILS Technical Requirements & Scope of Work
(07/15/11, .doc, 100 KB)
-
Appendix C_Affidavit Non-TSP-DSP Data Submittal
EILS Technical Requirements & Scope of Work
(07/15/11, .doc, 78.5 KB)
-
Appendix D_Notification of Self-Provision Form
EILS Technical Requirements & Scope of Work
(07/15/11, .doc, 78 KB)
-
Reinstatement Schedule 2nd Cycle Oct11Jan12
Revised Dates
(07/22/11, .doc, 40.5 KB)
|