- Home
- Grid Information
- Generation

Generation
This page provides current information on Generation Resources, including forecast and actual generation for Wind and PhotoVoltaic (Solar) Generation Resources; Resource Outages; Reliability Unit Commitment (RUC) constraints; Reliability Must Run (RMR) Resource deployments; Fuel Type; and aggregate High and Low Dispatch Limits (HDL, LDL) in the ERCOT region. The Key Documents section provides links to supporting documents related to resource asset registration, Outage scheduling, and monthly ERCOT Wind Integration Reports.
Advanced Action Notice Planning Assessment Input Details
-
Advanced Action Notice Planning Assessment Input Details
This report provides the Load and Resource inputs used by ERCOT to determine the need to issue an Advanced Action Notice (AAN) or Outage Schedule Adjustment.
Aggregate High and Low Dispatch Limits (HDL, LDL)
-
Summary Report of HDL and LDL
This report is posted after every SCED run and includes the sum of the HDL and the sum of the LDL for all Generation Resources On-Line and Dispatched by SCED.
Fuel Mix
-
Fuel Mix Report: 2020
Reports actual generation by fuel type for each 15-minute settlement interval, as well as totals by month and year-to-date.
(Jan 07, 2021 – xlsx – 3.4 MB) -
Fuel Mix Report: 2007 - 2019
Reports actual generation by fuel type for each 15-minute settlement interval, as well as totals by month and year-to-date.
(Mar 09, 2020 – zip – 33.4 MB)
Intermittent Renewable Resources
-
Aggregated Solar Resource Power Potential Forecast
This report is posted every hour and includes System-wide STPPF and PVGRPP for On-Line PVGRs for the rolling future 168-hour period.
-
Hourly Aggregated Wind Output
These files display the hourly aggregated wind power output for ERCOT for the year.
-
Hourly System-wide and Regional STWPF and WGRPP by Forecast Model
This report is posted every hour and includes system-wide and regional STWPF and WGRPP values produced by each forecast model for On-Line WGRs for the rolling future 168-hour period and also indicates which forecast model is used for each region to populate COPs.
-
Intra-Hour Wind Power Forecast By Geographical Region
Intra-Hour Wind Power Forecast (IHWPF) by wind region that provides a rolling two hour, five minute forecast of ERCOT-wide wind production potential.
-
Solar Power Production - Actual 5-Minute Averaged Values
This report is posted every 5 minutes and includes System-wide actual 5-minute averaged solar power production for On-Line PVGRs for a rolling historical 60-minute period.
-
Solar Power Production - Hourly Averaged Actual and Forecasted Values
This report is posted every hour and includes System-wide actual hourly averaged solar power production, STPPF, PVGRPP, and COP HSLs for On-Line PVGRs for a rolling historical 48-hour period as well as the System-wide STPPF, PVGRPP and COP HSLs for On-Line PVGRs for the rolling future 168-hour period.
-
Wind Power Production - Actual 5-Minute Averaged Values
This report is posted every 5 minutes and includes System-wide and Regional actual 5-minute averaged wind power production for a rolling historical 60-minute period.
-
Wind Power Production - Actual 5-Minute Averaged Values by Geographical Region
This report is posted every 5 minutes and includes System-wide and Geographic Regional actual 5-minute averaged wind power production for a rolling historical 60-minute period.
-
Wind Power Production - Hourly Averaged Actual and Forecasted Values
This report is posted every hour and includes System-wide and Regional actual hourly averaged wind power production, STWPF, WGRPP and COP HSLs for On-Line WGRs for a rolling historical 48-hour period as well as the System-wide and Regional STWPF, WGRPP and COP HSLs for On-Line WGRs for the rolling future 168-hour period.
-
Wind Power Production - Hourly Averaged Actual and Forecasted Values by Geographical Region
This report is posted every hour and includes System-wide and Geographic Regional actual hourly averaged wind power production, STWPF, WGRPP and COP HSLs for On-Line WGRs for a rolling historical 48-hour period as well as the System-wide and Regional STWPF, WGRPP and COP HSLs for On-Line WGRs for the rolling future 168-hour period.
Resource Outage Capacity
-
Hourly Resource Outage Capacity
This report includes all approved and accepted Planned, Forced and Maintenance Resource outages. The report excludes Resource outages for retirement of old equipment, seasonal mothballed (during the outaged season) and mothballed.
Reliability Unit Commitment (RUC)
-
Hourly RUC Active and Binding Transmission Constraints
View the list of all active and binding constraints observed in the Hourly Reliability Unit Commitment (RUC) process.
-
Hourly RUC Online In SCED Offline In COP Report
An hourly Reliability Unit Commitment (RUC) report containing the sum of the HSLs of Generation Resources that are online in the most recent SCED execution and indicated as offline in its COP, for each hour of the RUC study period. Online SCED statuses are ONRUC, ONREG, ON, ONDSR, ONOS, ONOSREG, ONDSRREG, FRRSUP, ONTEST, ONEMR, ONRR, ONOPTOUT, STARTUP, and OFFQS. Offline COP statuses are OFF, OUT, and EMR.
-
Daily RUC Active and Binding Transmission Constraints
View the list of all active and binding constraints observed in the Day-Ahead Reliability Unit Commitment (RUC) process.
-
Weekly RUC Active and Binding Transmission Constraints
View the list of all active and binding constraints observed in the Weekly Reliability Unit Commitment (RUC) process.
Reliability Must Run (RMR) Service
-
Hourly RMR Services Deployed
Reliability Must Run (RMR) Resources deployed for the prior hour, if any.
TCEQ Enforcement Discretion Policies
-
ERCOT Letter to TCEQ Permian Enforcement Discretion Policy
-
ERCOT Policy Concerning TCEQ Enforcement Discretion Relating to Transmission Emergencies in West Texas
-
TCEQ Enforcement Discretion Letter
-
TCEQ Procedure for Requesting TCEQ Enforcement Discretion Relating to a Power Emergency in Texas for ERCOT, MISO, or SPP Regions
Key Documents
-
Section 5 Planning Guide: Generation Resource Interconnection or Change Request
See Section 5 of the Current Planning Guide
-
Notification of Change of Generation Resource Designation
(Feb 06, 2017 – docx – 32.7 KB) -
Notification of Suspension of Operations
Must be completed prior to consideration of any Generation Resource for RMR status
(Feb 06, 2017 – docx – 41.3 KB) -
Resource Modification Forms
(Jan 16, 2014 – zip – 1.6 MB) -
Scheduled Zonal Generation - Historical
(Apr 23, 2007 – zip – 3.8 MB)
Stay Connected