Data Aggregation

This section contains daily data aggregation reports, including unaccounted for energy (UFE) reporting.

Also find transmission/distribution service provider (TDSP) distribution and transmission loss factors; and reports on peak demand for June, July, August and September (four coincident peaks).

Interval data recorder (IDR) and non-IDR load estimation and reports on compliance for IDR consumption data loading are also available.

Current Information
Actual Distribution Loss Factors Opens new browser window
Deemed actual distribution loss factors used in the ERCOT settlement process which are calculated from the distribution loss coefficients submitted by DSPs and the ERCOT actual load.
Actual Transmission Loss Factors Opens new browser window
Deemed actual transmission loss factors used in the ERCOT settlement process which are calculated based upon a linear interpolation or extrapolation using the on-peak and off-peak TLFs corresponding to the actual ERCOT system load.
Confidentiality Expired Adjusted Meter Load Report Opens new browser window
View the AML for each QSE by LSE, by Load Zone and by Settlement Interval, both from the initial settlement and all subsequent settlements, 180 days after the Operating Day.
Forecasted Distribution Loss Factors Opens new browser window
Deemed forecasted distribution loss factors which are calculated from the distribution loss coefficients submitted by DSPs and the ERCOT forecasted load.
Forecasted Transmission Loss Factors Opens new browser window
Deemed forecasted transmission loss factors which are calculated based upon a linear interpolation or extrapolation using the on-peak and off-peak TLFs corresponding to the forecasted ERCOT system load.
IDR Protocol Compliance Report Opens new browser window
This report displays a Protocol Compliance percentage (%) value for each MRE and the MARKET for the minimum RTM True-Up trade date scheduled for settlement plus the next 29 consecutive RTM True-Up trade dates.
Load Estimation Counts Report Opens new browser window
Counts of ESIIDs and percentages of counts by MRE settled with actual meter data, estimated using historical meter data, and estimated using default load.
Non-Registered DG Installed Capacity and Current DG Registration Threshold Quarterly Report Opens new browser window
This report shows the total unregistered installed capacity of DG greater than 50 kW and below the current DG registration threshold as required by protocol 16.5(2).

Opens new browser window System or application launches in a new browser window.