Notice_Operations@lists.ercot.com

7/24/23 4:03 PM

W-A072423-01 Re-evaluation of maximum Shadow Price for an irresolvable constraint in SCED


NOTICE DATE:  July 24, 2023

NOTICE TYPE: W-A072423-01 Operations

SHORT DESCRIPTION: Re-evaluation of maximum Shadow Price for an irresolvable constraint in SCED  

INTENDED AUDIENCE: ERCOT Market Participants

DAYS AFFECTED: July 24, 2023

LONG DESCRIPTION:  On July 24, 2023, ERCOT re-evaluated the maximum Shadow Price for SDIMBEV8: HAMILT_MAVERI1_1, an irresolvable constraint that as of July 23, 2023, had accumulated a net margin exceeding $95,000/MW, per the criteria defined in in Section 3.6.2 of the Other Binding Document (OBD), “Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints.”  

The maximum shadow price for the aforementioned contingency/constraint pair was re-determined in accordance with Section 3.6.2 of that same document to be $2,000 per MWh. Due to the existing irresolvable constraints SBEVASH8: HAMILT_MAVERI1_1 and SBE2ASH8: HAMILT_MAVERI1_1 sharing the same constraint element as SDIMBEV8: HAMILT_MAVERI1_1, a corresponding update to their maximum Shadow Prices is also being performed. The update to the maximum Shadow Prices will be implemented between 5:00 PM and 6:00 PM Central Prevailing Time (CPT) on July 24, 2023, and be effective starting July 24, 2023. The updated maximum Shadow Prices will remain in effect for the remainder of calendar year 2023. The contingency/constraint pairs and updated maximum shadow prices (set in accordance with Section 3.6.2 of that same document) are as follows:

Contingency Name

Constraint Name

From Station/kV

Description

Maximum Shadow Price

 

SDIMBEV8

 

HAMILT_MAVERI1_1

 

HAMILTON/138

 

Loss of the 138kV line from Dimmit (DIMMIT) to Bevo (BEVO) overloads the 138 kV line from Hamilton Road (HAMILTON) to Maverick (MAVERICK)

 

2,000 $/MWh

 

SBEVASH8

 

HAMILT_MAVERI1_1

 

HAMILTON/138

 

Loss of the 138 kV line from ASHERTON (ASHERTON) to MCLEAN SOLAR (MCLNSLR) overloads the 138 kV line from HAMILTON ROAD (HAMILTON) to MAVERICK (MAVERICK)

 

2,000 $/MWh

 

SBE2ASH8

 

HAMILT_MAVERI1_1

 

HAMILTON/138

 

Loss of the 138 kV line from BEVO (BEVO) to ASHERTON (ASHERTON) overloads the 138 kV line from HAMILTON ROAD (HAMILTON) to MAVERICK (MAVERICK)

 

2,000 $/MWh

 

These maximum Shadow Prices will be used for all constraints in Security Constrained Economic Dispatch (SCED) which share the same monitored element (i.e. constraint name) and direction.

ADDITIONAL INFORMATION: The ERCOT business practice document, Setting the Shadow Price Caps and Power Balance Penalties in Security Constrained Economic Dispatch, can be found in the Methodology for Setting Maximum Shadow Prices for Network and Power Balance Constraints under Key Documents on the Real-Time Market webpage, and under the Other Binding Documents List, both of which are on the ERCOT website.

CONTACT: If you have any questions, please contact your ERCOT Account Manager. You may also call the general ERCOT Client Services phone number at (512) 248-3900 or contact ERCOT Client Services via email at ClientServices@ercot.com.

If you are receiving email from a public ERCOT distribution list that you no longer wish to receive, please follow this link in order to unsubscribe from this list: http://lists.ercot.com.

dg