From: Network Data Support Working Group [NETWORKDATASUPPORTWG@LISTS.ERCOT.COM] on behalf of John, Ebby [ebby.john@CENTERPOINTENERGY.COM] Sent: Wednesday, May 13, 2009 12:27 PM To: NETWORKDATASUPPORTWG@LISTS.ERCOT.COM Subject: Meeting Summary: NDSWG Special NOGRR025 Meeting 05-05-09 Attachments: 025NOGRR Consolidated Comments_workshop20090501_NDSWG_050509.xls Attached is the new NOGRR025 spreadsheet with the latest NDSWG changes made at the May 5th meeting. Changes include … 1) Change row 5 to include ERCOT in “Entity being reported on” to be consistent with Workshop edits to row 34. 2) Add new row for metric item related to Telemetry Standards: Critically Important Telemetry Performance . 3) Change color of row 6 to indicate removal of NDSWG from “Group Review” and transfer to QMWG. Isabel Flores to follow up on transition of responsibility for item. 4) Added Next Step Workshop directions to the “Suggested Process” tab NDSWG reviewed existing ERCOT telemetry reports based on current TAC approved Telemetry and SE standards and made the following comments; 1) ICCP Link Availability Statistics * Calculation method creates possibility of error. ERCOT will report back at next meeting(05/20) regarding possible options including a snapshot calculation method. 2) ICCP Link Up/Down Report * Continue discussion at next meeting 3) Monthly Market Participant Real Time Availability Statistics * Report format and calculations look good. Mark report as “Non-Metric”, for information only. Metric is actually on the quarterly values. 4) Quarterly Point Availability Statistics * Change report to match Standards to include 98% total MP summary similar to monthly point availability report. 5) Critical Data Availability Statistics Report * Report format and calculations look good. Request report name change to match Standards “Critically Important Telemetry Performance Report”. Also clarify that pass/fail metric is on the total MP measure not individual points. The NDSWG recognized the need to review the Telemetry Standards for potential changes and clarifications. Further discussions on scheduling review sessions will be conducted at the next NDSWG meeting on 05-19-09. Thanks, Ebby John CenterPoint Energy – Real Time Operations ebby.john@centerpointenergy.com 713-207-2136