Generation Resources |
1,358 |
Load Resources excluding Controllable Load Resources |
817 |
Unprocured additional capacity from Load Resources excluding Controllable Load Resources |
375 |
Controllable Load Resources |
11 |
Resources capable of Fast Frequency Response |
236 |
Deployed Generation Resources and Controllable Load Resources |
0 |
Generation Resources |
1,362 |
Load Resources excluding Controllable Load Resources |
832 |
Resources capable of Fast Frequency Response |
236 |
Controllable Load Resources |
11 |
Generation Resources |
119 |
Load Resources excluding Controllable Load Resources |
136 |
Controllable Load Resources |
0 |
Quick Start Generation Resources |
743 |
Deployed Generation Resources and Load Resources |
0 |
Generation Resources |
119 |
Load Resources excluding Controllable Load Resources |
136 |
Controllable Load Resources |
0 |
Quick Start Generation Resources |
743 |
On-Line Generation Resources With Energy Offer Curves including Quick Start Generation Resources |
0 |
On-Line Generation Resources with Output Schedules |
0 |
Undeployed Load Resources |
0 |
Off-Line Generation Resources |
1,585 |
On-Line Generation Resources with Energy Offer Curves |
105 |
On-Line Generation Resources with Output Schedules |
0 |
Load Resources |
0 |
Off-Line Generation Resources excluding Quick Start Generation Resources |
1,585 |
Quick Start Generation Resources |
0 |
Undeployed Reg-Up |
259 |
Undeployed Reg-Down |
31 |
Deployed Reg-Up |
0 |
Deployed Reg-Down |
203 |
Reg-Up |
259 |
Reg-Down |
234 |
Capacity from Controllable Load Resources available to decrease Base Points (energy consumption) in SCED |
-9,782 |
Capacity from Controllable Load Resources available to increase Base Points (energy consumption) in SCED |
555 |
Capacity with Energy Offer Curves available to increase Generation Resource Base Points in SCED |
10,764 |
Capacity with Energy Offer Curves available to decrease Generation Resource Base Points in SCED |
-42,185 |
Capacity without Energy Offer Curves available to increase Generation Resource Base Points in SCED |
35 |
Capacity without Energy Offer Curves available to decrease Generation Resource Base Points in SCED |
-2,002 |
Capacity available to increase Generation Resource Base Points in the next 5 minutes in SCED (HDL) |
7,308 |
Capacity available to decrease Generation Resource Base Points in the next 5 minutes in SCED (LDL) |
-17,214 |
ERCOT-wide Physical Responsive Capability (PRC) |
7,033 |
Real-Time On-Line reserve capacity |
15,222 |
Real-Time On-Line and Off-Line reserve capacity |
21,119 |
Aggregate telemetered HSL capacity for Resources with a telemetered Resource Status of EMR |
477 |
Aggregate telemetered HSL capacity for Resources with a telemetered Resource Status of OUT |
7,028 |
Aggregate net telemetered consumption for Resources with a telemetered Resource Status of OUTL |
2,288 |