MIS LOG IN

PLWG Meeting

August 20, 2014
09:30 AM
ERCOT Austin
8000 Metropolis (Building E), Suite 100
Austin, TX 78744
Room 206A
Teleconference: 877-668-4493
Meeting number: 655 292 933
Meeting password: plwg082014

Agenda

1.

Antitrust Admonition

Schwarz

9:30 a.m.

2.

Update on ROS, TAC, and Board Activity on PLWG Matters

  • Board Activity: Approved PGRR038: 95% Element Loading Criteria
  • ROS Activity: None

Schwarz

 

3.

PGRR035: DC Tie Interconnection Process

  • Tabled for ERCOT Legal Consideration

Schwarz

 

4.

PGRR039: Generation Data for Resource Adequacy and Reliability Reporting

  • Language and IA Consideration

Schwarz

 

5.

POI to MIS Website Transition Overview (PGRR036)

Lavas

 

6.

Planning Guide 6.9: Air/Water Permit Attestation Discussion

Billo

 

7.

Review Load Scaling Methodologies Used in Planning Studies

Calpine/NRG

 

8.

CDR and Planning Study Model Differences

Bell

 

9.

Generation Deliverability Criteria

  • Develop Criteria and Planning Guide Language

Schwarz

 

10.

Additional Items

 

 

11.

Next Meeting: September 17, 2014

 

 

 

Adjourn

 

3:30 p.m.

Scheduled plwg Meetings

Key Documents

Aug 19, 2014 - doc - 127 KB
Aug 19, 2014 - ppt - 2.4 MB

All information is posted as Public in accordance with the ERCOT Websites Content Management Corporate Standard.

Related Content