Power Operations Bulletins 2003 Archive

Date Subject Bulletin No.
12/10/2003 Procedure when OOMEing Combined Cycle Units Off Line - Transmission & Security Deskand 58 (41.5 KB .doc)
12/04/2003 Replace RRS Through a Bilateral Trade - Operating Period Desk 57 (43.5 KB .doc)
12/02/2003 Replace RRS Through a Bilateral Trade - Frequency Control Desk 56 (43 KB .doc)
12/02/2003 Revision to the Transmission and Security Desk 55 (50 KB .doc)
12/02/2003 Revision to Day Ahead Desk 54 (42 KB .doc)
11/11/2003 Revision to Day Ahead Desk 53 (49.5 KB .doc)
10/15/2003 Revision to Day Ahead Desk Procedure 52 (37.5 KB .doc)
10/17/2003 Revision to Day Ahead Desk 51 (39 KB .doc)
10/15/2003 Revision to the Frequency Control Desk 50 (39.5 KB .doc)
10/15/2003 Revision to the Transmission and Security Desk 49 (39 KB .doc)
10/15/2003 Revision to Operating Period Desk 48 (33.5 KB .doc)
10/10/2003 Revision to Frequency Control Desk 47 (33.5 KB .doc)
10/10/2003 Revision to Transmission and Security Desk 46 (37.5 KB .doc)
10/09/2003 Revision of Operating Period Desk 45 (32.5 KB .doc)
10/02/2003 Temporary solution to provide TOs with information on Planned Outages that require movement of generation 44 (32 KB .doc)
10/02/2003 Revision to the Operating Procedures 43 (34 KB .doc)
10/02/2003 Revision of Operating Period Desk Procedures 42 (34 KB .doc)
10/02/2003 Revision of Transmission and Security Desk 41 (34.5 KB .doc)
09/30/2003 Revision to the Transmission and Security Desk Procedures 40 (34 KB .doc)
09/30/2003 Revision of the Operating Period Desk Procedures 39 (34 KB .doc)
09/30/2003 Revision of Frequency Control Desk Procedures 38 (34 KB .doc)
09/30/2003 Revision of Day-Ahead Desk Procedures 37 (34 KB .doc)
09/30/2003 Revision of Direct Current Ties Procedures 36 (34 KB .doc)
09/16/2003 Procedure when OOMEing Combined Cycle Units Off Line 35 (31.5 KB .doc)
09/04/2003 Revision of Operating Procedures 34 (34.5 KB .doc)
08/27/2003 Revised the Forced/Level 1 Outage Information Sheet 33 (26 KB .doc)
08/27/2003 Actual Start and End Entries - Outage Scheduler Enhancements 32 (22 KB .doc)
07/25/2003 Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis 31 (621 KB .doc)
07/24/2003 Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis 30 (29.5 KB .doc)
07/16/2003 Revision of Operating Procedures Development and Maintenance 29 (32.5 KB .doc)
07/14/2003 Revision of Cancelled Outages 28 (32.5 KB .doc)
07/14/2003 Revision of timeline for BES 27 (33.5 KB .doc)
07/08/2003 Revision of Operating Procedures 26 (33 KB .doc)
06/30/2003 Revision of Operating Procedures 25 (33.5 KB .doc)
06/25/2003 Revision of Operating Procedures 24 (33.5 KB .doc)
06/19/2003 Load Shed Ratios assigned to Transmission Operators in ERCOT for shedding firm load during step 4 of EECP 23 (27 KB .doc)
06/06/2003 Voltage Collapse of Bryan-College Station Area April 15,2003 22 (33 KB .doc)
05/28/2003 Revision of Operating Procedures 21 (33.5 KB .doc)
05/21/2003 Revision of Operating Procedures 20 (33.5 KB .doc)
05/09/2003 Revision of Operating Procedures 19 (34.5 KB .doc)
04/29/2003 Revision of Operating Procedures 18 (66 KB .doc)
04/01/2003 Revision of Operating Procedures 17 (33.5 KB .doc)
03/06/2003 Revision of Operating Procedures 15 (28.5 KB .doc)
02/13/2003 Revision of Operating Procedures 14 (28.5 KB .doc)
01/07/2003 Revision of Operating Procedures 13 (81 KB .doc)
01/07/2003 Revision of Operating Procedures 12 (33.5 KB .doc)