| Date |
Subject |
Bulletin No. |
| 12/10/2003 |
Procedure when OOMEing Combined Cycle Units Off Line - Transmission & Security Deskand |
58 (41.5 KB .doc) |
| 12/04/2003 |
Replace RRS Through a Bilateral Trade - Operating Period Desk |
57 (43.5 KB .doc) |
| 12/02/2003 |
Replace RRS Through a Bilateral Trade - Frequency Control Desk |
56 (43 KB .doc) |
| 12/02/2003 |
Revision to the Transmission and Security Desk |
55 (50 KB .doc) |
| 12/02/2003 |
Revision to Day Ahead Desk |
54 (42 KB .doc) |
| 11/11/2003 |
Revision to Day Ahead Desk |
53 (49.5 KB .doc) |
| 10/15/2003 |
Revision to Day Ahead Desk Procedure |
52 (37.5 KB .doc) |
| 10/17/2003 |
Revision to Day Ahead Desk |
51 (39 KB .doc) |
| 10/15/2003 |
Revision to the Frequency Control Desk |
50 (39.5 KB .doc) |
| 10/15/2003 |
Revision to the Transmission and Security Desk |
49 (39 KB .doc) |
| 10/15/2003 |
Revision to Operating Period Desk |
48 (33.5 KB .doc) |
| 10/10/2003 |
Revision to Frequency Control Desk |
47 (33.5 KB .doc) |
| 10/10/2003 |
Revision to Transmission and Security Desk |
46 (37.5 KB .doc) |
| 10/09/2003 |
Revision of Operating Period Desk |
45 (32.5 KB .doc) |
| 10/02/2003 |
Temporary solution to provide TOs with information on Planned Outages that require movement of generation |
44 (32 KB .doc) |
| 10/02/2003 |
Revision to the Operating Procedures |
43 (34 KB .doc) |
| 10/02/2003 |
Revision of Operating Period Desk Procedures |
42 (34 KB .doc) |
| 10/02/2003 |
Revision of Transmission and Security Desk |
41 (34.5 KB .doc) |
| 09/30/2003 |
Revision to the Transmission and Security Desk Procedures |
40 (34 KB .doc) |
| 09/30/2003 |
Revision of the Operating Period Desk Procedures |
39 (34 KB .doc) |
| 09/30/2003 |
Revision of Frequency Control Desk Procedures |
38 (34 KB .doc) |
| 09/30/2003 |
Revision of Day-Ahead Desk Procedures |
37 (34 KB .doc) |
| 09/30/2003 |
Revision of Direct Current Ties Procedures |
36 (34 KB .doc) |
| 09/16/2003 |
Procedure when OOMEing Combined Cycle Units Off Line |
35 (31.5 KB .doc) |
| 09/04/2003 |
Revision of Operating Procedures |
34 (34.5 KB .doc) |
| 08/27/2003 |
Revised the Forced/Level 1 Outage Information Sheet |
33 (26 KB .doc) |
| 08/27/2003 |
Actual Start and End Entries - Outage Scheduler Enhancements |
32 (22 KB .doc) |
| 07/25/2003 |
Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis |
31 (621 KB .doc) |
| 07/24/2003 |
Procedure for Control of transmission system loading within N-1 Thermal Contingency Criteria using Real Time Contingency Analysis |
30 (29.5 KB .doc) |
| 07/16/2003 |
Revision of Operating Procedures Development and Maintenance |
29 (32.5 KB .doc) |
| 07/14/2003 |
Revision of Cancelled Outages |
28 (32.5 KB .doc) |
| 07/14/2003 |
Revision of timeline for BES |
27 (33.5 KB .doc) |
| 07/08/2003 |
Revision of Operating Procedures |
26 (33 KB .doc) |
| 06/30/2003 |
Revision of Operating Procedures |
25 (33.5 KB .doc) |
| 06/25/2003 |
Revision of Operating Procedures |
24 (33.5 KB .doc) |
| 06/19/2003 |
Load Shed Ratios assigned to Transmission Operators in ERCOT for shedding firm load during step 4 of EECP |
23 (27 KB .doc) |
| 06/06/2003 |
Voltage Collapse of Bryan-College Station Area April 15,2003 |
22 (33 KB .doc) |
| 05/28/2003 |
Revision of Operating Procedures |
21 (33.5 KB .doc) |
| 05/21/2003 |
Revision of Operating Procedures |
20 (33.5 KB .doc) |
| 05/09/2003 |
Revision of Operating Procedures |
19 (34.5 KB .doc) |
| 04/29/2003 |
Revision of Operating Procedures |
18 (66 KB .doc) |
| 04/01/2003 |
Revision of Operating Procedures |
17 (33.5 KB .doc) |
| 03/06/2003 |
Revision of Operating Procedures |
15 (28.5 KB .doc) |
| 02/13/2003 |
Revision of Operating Procedures |
14 (28.5 KB .doc) |
| 01/07/2003 |
Revision of Operating Procedures |
13 (81 KB .doc) |
| 01/07/2003 |
Revision of Operating Procedures |
12 (33.5 KB .doc) |