Texas SET Issue 078
| Title: |
The REF~JH~I should be designated by TX SET to be used for kWh Generation values only
|
| Next Step: |
A RMGRR was approved by RMS in October and Change Control 2008-725 was drafted to document the changes. Closing Issue.
|
| Status: |
Approved
on 10/21/2008
|
| Change Control Tracking Number: |
2008-725 |
| Date |
Gov Body |
Action Taken |
Next Steps |
|
10/21/2008
|
Texas SET WG
|
|
Approved
|
A RMGRR was approved by RMS in October and Change Control 2008-725 was drafted to document the changes. Closing Issue.
|
|
09/24/2008
|
Texas SET WG
|
|
Deferred/Tabled
|
TX SET finalized a draft RMGRR that establishes that the REF~JH~I in the 867_02 and 867_03 is dedicated for outflow power values and has submitted the RMGRR requesting Urgent status. Leaving this issue open pending the drafting of a Change Control.
|
|
08/19/2008
|
Texas SET WG
|
|
Deferred/Tabled
|
TX SET is still waiting for final requirements from Distributed Generation Taskforce and Market agreement on this process prior to suggesting changes to implementation guide.
|
|
07/16/2008
|
Texas SET WG
|
|
Deferred/Tabled
|
ERCOT stated that if there are multiple REF~JH~I loops in an 867_03, that they will only read and use the first one in the transaction and that they would like this documented in the change control/i.g. and tx set agreed. change control is still pending until dgtf gets a recommendation approved for how to handle interval data for drg <50 kw.
|
|
06/17/2008
|
Texas SET WG
|
|
Deferred/Tabled
|
The distributed generation task force will be meeting on 6-24 to discuss how to handle IDR meters with DRG. Therefore, TX SET may need to incorporate changes for both non-IDR and IDR data to support generation values in the meter read transactions.
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
05/20/2008
|
| Sponsor: |
Green Mountain Energy Company
|
| Urgent: |
No
|
| Sections: |
|
| Description: |
In support of PRR756 related to Distributed Renewable Generation, the REF~JH~I should be designated by TX SET to be used for kWh Generation values only.
|
| Reason: |
This information would benefit the TDSP’s and CR’s in providing additional information about the metering and the premise. This new code would provide CR’s and TDSP’s with visibility of the Master Metered accounts that could be evaluated prior to disconnect or MVO request, and provide information to identify the presence of AMR meters.
|