Withdrawn Nodal Protocol Revision Requests (NPRRs)
# Title Description Date Posted Sponsor Urgent Protocol Sections Current Status Next Group Next Step
NPRR040 Synchronization of Emergency Electric Curtailment Plan (EECP) Event Realignment This NPRR synchronizes the Nodal Protocols with PRR682, EECP Event Realignment, which was approved by the ERCOT Board on November 14, 2006.  02/16/2007  Operating Guides Revision Task Force No 2.1, 6.5.9.5.4, 6.5.9.4.1, 6.5.9.4.1 Withdrawn PRS
NPRR074 Revisions to Monitoring and Qualification Tests in Section 8, Performance Monitoring and Compliance This NPRR makes the testing and compliance requirements consistent with NPRR049, Generation Subsystem Changes to Incorporate Approved Whitepapers, and the white papers “Generation Resource Responsive Reserve Deployment and Recall” and “Non-Spin Deployment Notification and Availability” approved by TPTF located at http://nodal.ercot.com/docs/pd/mms/index.html#oth. 06/19/2007  ERCOT Staff No 8.2.2.1, 8.1.2.2.3, 8.1.2.2.4, 8.1.2.3.2, 8.1.2.4.1, 8.1.2.4.2, 8.1.2.4.3 Withdrawn
NPRR093 Clarification to Definition of DUNS Number; Section 2, Definitions and Acronyms This NPRR revises and clarifies the definition of “DUNS Number” in Section 2 of the Nodal Protocols. 12/14/2007  ERCOT No 2.1 Withdrawn
NPRR104 Corrections and Clarifications for Real Time Settlements and Ancillary Service Net Obligations This Nodal Protocol Revision Request (NPRR) makes corrections and clarifications to existing formulas for Real-Time Settlement and the Day-Ahead and Real Time Ancillary Services Net Obligations. ERCOT Staff No 4.6.4.2.1, Regulation Up Service Charge; 4.6.4.2.2, Regulation Down Service Charge; 4.6.4.2.3, Responsive Reserve Service Charge; 4.6.4.2.4, Non-Spinning Reserve Service Charge; 6.6.3.1, Real Time Energy Imbalance Payment or Charge at a Resource Node; 6.6.5.1.1, Base Point Deviation Charge for Over Generation; 6.6.6.1, RMR Standby Payment; 6.6.8.1, Black Start Capacity Payment; 6.6.9.1, Payment for Emergency Power Increase Directed by ERCOT; 6.6.10, Real Time Revenue Neutrality Allocation; and 6.7.3, Adjustments to cost Allocations for Ancillary Services Procurement . Withdrawn TPTF Review of NPRR104 by TPTF
NPRR115 Grey-Boxing of Settlement and Billing Related Information Calculation This Nodal Protocol Revision Request (NPRR) “grey-boxes” the variable, DAOPTPRINFO(j, k), in Section 7.9.1.2 and the variable, RTOPTPRINFO(j, k), in Section 7.9.2.2.  “Grey-boxing” indicates a delay in the availability of these functionalities until ERCOT is able to implement an automated solution. ERCOT Staff No 7.9.1.2, Payments for PTP Options Settled in DAM; and 7.9.2.2, Payments for PTP Options Settled in Real-Time Withdrawn
NPRR116 Addition of Commercially Traded Points to Settlement Point List Adds settlement points to the list that are commercially traded. 03/25/2008  DB Energy Trading No 2.1 Withdrawn PRS PRS language consideration
NPRR121 System Parameters Posting Frequency This Nodal Protocol Revision Request (NPRR) revises the Market Information System (MIS) posting frequency from ten seconds to three minutes. 03/31/2008  ERCOT Staff No 6.5.7.5, Ancillary Services Capacity Monitor Withdrawn TPTF Review of PRR121 by TPTF
NPRR125 Creation of a New Trading Hub at Venus Switching Station This Nodal Protocol Revision Request (NPRR) creates a new trading hub at the Venus Switching Station. 04/11/2008  DB Energy Trading No 3.5.2.7, Venus 345 kV Hub (Venus 345) (New) Withdrawn PRS Review of NPRR125 by PRS.
NPRR137 Synchronization and Update of Section 21 This Nodal Protocol Revision Request (NPRR) synchronizes the Zonal Protocol Section 21 with the Nodal Protocols, revises the title of this Section to properly reflect its scope to include System Change Requests (SCR), and updates the process to reflect current practice.  This NPRR also incorporates PRR753, PRR Appeals Process. 06/24/2008  ERCOT Staff No 21, Process for Protocol Revision Withdrawn PRS Review of NPRR137 by PRS
NPRR147 DAM Short Pay Changes This Nodal Protocol Revision Request (NPRR) changes the way short pays to the Day-Ahead Market (DAM) are handled.  This NPRR reallocates short payments using a procedure that draws from the Congestion Revenue Right (CRR) Auction revenue account first and then draws any additional shortfalls from the CRR Balancing Account. 08/13/2008  Clayton Greer on behalf of the Wholesale Market Subcommittee (WMS) No 7.5.7, 7.6, 7.9.3.5, 9.4.3, 9.10, 9.12 and 9.13 Withdrawn
NPRR151 Clarify Definition of a Generator Output Breaker in the Outage Scheduler This Nodal Protocol Revision Request (NPRR) clarifies the definition of which “generator output breakers” are exempt in the Outage Scheduler. 09/08/2008  Anthony Alford w/ CenterPoint Energy No 3.10.7.5.1, Continuous Telemetry of the Status of Breakers and Switches Withdrawn
NPRR179 ERCOT Polled Settlement Load Data This Nodal Protocol Revision Request (NPRR) removes the requirement for ERCOT to provide ERCOT Polled Settlement Load data via an 867_03.  06/09/2009  Calvin Opheim No 11.1.10 Withdrawn COPS COPs consideration
NPRR215 Resolution of Alignment Item A151 - Removal of Posting Requirement for RMR Services This Nodal Protocol Revision Request (NPRR) removes the redundant posting of Reliability Must-Run (RMR) energy deployment. 03/15/2010  ERCOT No 6.3.2 Withdrawn PRS PRS Language Consideration
NPRR234 Resolution of Alignment Item A32, A147, A155, A159, and A187 - Clarify General Capacity Testing and Net Dependable Capability This Nodal Protocol Revision Request (NPRR) clarifies Seasonal reporting of Net Dependable Capability (NDC).  The NPRR also clarifies unannounced testing of High Sustained Limit (HSL).  05/13/2010  John Adams and John Dumas No 2.1, Definitions 2.2, Acronyms 3.1.4.8, Deratings 3.2.5, Publication of Resource and Load Information 6.4.5, Resource Status 8.1.1.1, Ancillary Service Qualification and Testing 8.1.1.2, General Capacity Testing Requirements Withdrawn WMS WMS Review
NPRR334 Incorporate Resource Limit for the Amount of Regulation Service that may be Provided from a Generation Resource During any Operating Hour

This Nodal Protocol Revision Request (NPRR) adds language to incorporate a percentage requirement limiting the amount of Regulation Service that Generation Resources may provide; and to provide for an annual ERCOT review of the percentage requirement limiting the amount of Regulation Service that Generation Resources may provide.

03/25/2011  ERCOT No 3.16, 3.18 Withdrawn
NPRR345 EILS Availability Calculation Post-Depletion This NPRR adds language to remove a deficiency in the calculation formula for Emergency Interruptible Load Service (EILS) availability factors. 04/05/2011  Energy Curtailment Specialists, Inc No 8.1.3.1 Withdrawn PRS PRS Language Consideration
NPRR366 Generation Resource Power Factor Criteria Clarification This Nodal Protocol Revision Request (NPRR) adjusts the power factor criteria for Generation Resources to align with actual Generation Resource capabilities. 05/04/2011  LCRA No 2.1, 3.15, 3.15.1 Withdrawn PRS PRS Language Consideration
NPRR371 Telemetered LSL for QSGR This Nodal Protocol Revision Request (NPRR) will allow QSGRs to immediately telemeter the physical Low Sustained Limit (LSL) upon a SCED energy deployment. 05/31/2011  Topaz Power Yes 3.8.3 Withdrawn PRS PRS consider the language
NPRR373 Revised State Estimator Reports on Individual Transmission Load on Electrical Buses The Nodal Protocol Revision Request (NPRR) reinstates the State Estimator Load Reports, which will be published every five minutes on the Market Information System (MIS) Secure Area.  The NPRR requires ERCOT to redact station codes with less than ten Electric Service Identifiers (ESI IDs) to protect confidential information. 06/03/2011  WMS No 6.5.7.1.13 Withdrawn
NPRR378 Posting of the ERCOT Short-Term Load Forecast and the Aggregated HDL and LDL Used in SCED This Nodal Protocol Revision Request (NPRR) adds a requirement for ERCOT to post on the Market Information System (MIS): (a) the ERCOT Short-Term Load Forecast (STLF) for the current Security-Constrained Economic Dispatch (SCED); (b) the STLF for the next or prompt five-minute SCED interval; and (c) the STLF effective within 15 minutes.  This NPRR also clarifies SCED up/down reserves and adds capacity for the aggregate sum of the High Dispatch Limits (HDLs) and Low Dispatch Limits (LDLs) for the On-Line Generation Resources in each five-minute SCED interval. 06/08/2011  Floyd Trefny No 6.5.7.5 Withdrawn
NPRR381 Registration Requirements for Interconnecting Entities This Nodal Protocol Revision Request (NPRR) creates a new type of Market Participant called an “Interconnecting Entity” (IE).  The NPRR requires Entities who wish to interconnect a new Resource or make certain changes to a Resource to register with ERCOT and to comply with ERCOT standards and procedures during the interconnection or change process.  Entities that are not presently registered as Resource Entities will now be required to register as IEs before they may seek registration as Resource Entities.  Existing Resource Entities who seek interconnection of a new Resource or certain changes to an existing Resource must amend their registration to add the IE designation, and may amend the registration to withdraw the IE designation when the new Resource is energized or the proposed changes are implemented.  This NPRR does not require current Resource Entities to seek retroactive registration as an IE for Resources already energized.  However, this NPRR would require Entities currently involved in the interconnection process to register as IEs. 06/08/2011  ERCOT No 1.6.5, 2.1.  2.2, 3.3.1, 16.5, Registration as a Resource Entity 16.16, (new) 16.16.1, new) 16.16.2, Registration Process for an Interconnecting Entity (new) 16.16.2.1,(new) 16.16.2.2, 16.16.2.3,  (new) 16.16.3,  (new) 22, Attachment A, 22, Attachment C, Withdrawn
NPRR409 Outage Planning Criteria Clarifications and Enhancements to Narrow Gap Between Real-Time Operations and Outage Planning This NPRR adds a new definition of Outage Planning Contingencies to be consistent with NOGRR078 and PGRR011.  This NPRR also revises factors used by ERCOT to evaluate requests for Generation and Transmission Outages received from Market Participants to allow for 90th percentile variation of weather driven Load, generation availability, and transmission line ratings of dynamically rated lines.  This NPRR ensures that Outage planning studies do not double count generation capacity as being available simultaneously for both congestion management and Ancillary Services including Responsive Reserve (RRS), Regulation Up (Reg-Up), and Non-Spinning Reserve (Non-Spin), unless ERCOT Operations has processes in place to allow for location specific deployment of the Ancillary Service reserves for congestion management purposes.  Finally, this NPRR ensures that, if in Real-Time operations ERCOT determines that a generic constraint definition and associated transfer limit(s) is required for secure operation of the ERCOT System, then this same generic constraint shall be similarly modeled in Outage planning studies. 09/07/2011  Luminant Energy No 2.1, 2.2, 3.1.5.11 Withdrawn
NPRR410 Definition of an Energy Storage Resource This Nodal Protocol Revision Request (NPRR) creates a definition for an Energy Storage Resource and creates an Energy Storage Load Zone for each Energy Storage Resource capable of storing and generating one MW or greater. 09/07/2011  Xtreme Power Inc. No 3.4.1, 3.4.2, 3.4.5, 3.4.5 (new), 6.6.1.4 Withdrawn
NPRR420 Correct South Hub Back to Original Definition This Nodal Protocol Revision Request (NPRR) corrects changes made by NPRR175, Hub Bus List Clarification, that inadvertently deleted the Sandow switching station (formerly SDSES) from the Hub and added two additional Fayette stations to the calculation 10/05/2011  Morgan Stanley No 3.5.2.2 Withdrawn PRS PRS Language Consideration