# Title Description Date Posted Sponsor Urgent Protocol Sections Current Status Next Group Next Step
NPRR018 Separate LaaR and Generator MCPCs for RRS Modify the nodal protocols to provide separate RRS MCPCs for LaaRs and generators when the service is oversubscribed by LaaRs, as per the WMS vote taken on May 17, 2006. 08/11/2006  No 4.5.1, 4.5.3, 4.6.4.1.3 Rejected
NPRR021 Reduce Timeline for Notice and Cure and Create a Working Credit Limit
  • Reduces time to post collateral from two Bank Business Days to one (exception: Municipalities, Electric Cooperatives, or an Entity created under Texas Water Code (TWC) ยง222.001, may continue to take two Bank Business Days to post collateral agreements). 
  • Creates a working credit limit which allows an entity to utilize up to 85% of posted collateral + unsecured credit limit (rather than 100%).
  • Reduces time to cure a payment breach under QSE, LSE and TCR.
08/28/2006  Credit Work Group No 16.11.5, 16.11.6, 22H Rejected
NPRR053 Creation of a New Trading Hub at Venus Switching Station Creates a new trading hub at Venus Switching Station. 03/12/2007  Constellation Energy Commodities Group No 3.5.2.7, Venus 345 kV Hub (Venus 345) (New) Rejected
NPRR056 Modify Competitive Load Zones This Nodal Protocol Revision Request (NPRR) changes the Competitive Load Zones to be the Congestion Zones in effect when ERCOT transitions to the nodal market. 03/28/2007  Coral Power, LLC No 3.4.1 Load Zone Types Rejected
NPRR079 Remove Shift Schedule Posting Requirement This PRR eliminates the posting requirement in Section 6.3.1 and 6.5.1.2(5). 08/15/2007  ERCOT Staff No 6.3.1, Activities for the Adjustment Period and 6.5.1.2, Centralized Dispatch Rejected
NPRR216 Allow ERCOT Option to Cancel Commitments Previously Issued Through RUC

This Nodal Protocol Revision Request (NPRR) adds statements allowing ERCOT the option of cancelling commitments, prior to breaker close, previously issued through RUC.

Additional non-substantive administrative revisions, such as correcting defined term and acronym usage, are shown with the author “ERCOT Market Rules.”

03/22/2010  ERCOT No 2.1, 5.1, 5.3, 5.4, 5.5.2, 5.5.3, 5.7.3 Rejected
NPRR287 Real-Time Market Price Delivery Consistency This Nodal Protocol Revision Request (NPRR) proposes to remove Locational Marginal Prices (LMPs) from Inter-Control Center Communications Protocol (ICCP) communications, based on emerging concerns regarding the inconsistent timeframes for price delivery in Real-Time. 10/18/2010  ERCOT No 6.3.2 Rejected
NPRR300 Municipal Owned Utility Addition to Determination of Total Potential Exposure for a Counter-Party This Nodal Protocol Revision Request (NPRR) adds Municipally Owned Utilities (MOUs) to the list of Entities exempt from the requirement to grant ERCOT a first priority security interest in order for Total Potential Exposure (TPE) of a Counter-Party to be based on the algebraic sum of the Counter-Party’s current and future credit exposures. 12/03/2010  City of Garland No 16.11.4.1 Rejected
NPRR308 Deployment Procedures for Non-Spin Resources This Nodal Protocol Revision Request (NPRR) will require Non-Spinning Reserve (Non-Spin) Service deployments to respect Resource Parameters as registered with ERCOT. 01/13/2011  City of Garland No 6.5.7.6.2.3 Rejected
NPRR309 Providing STWPF to QSEs Contractually Affiliated with WGR The Nodal Protocols currently enable a Wind-powered Generation Resource (WGR) and the Qualified Scheduling Entity (QSE) representing that WGR to receive ERCOT’s Short-Term Wind Power Forecast (STWPF) for that WGR via the Messaging System and the Market Information System (MIS) Certified Area.  This Nodal Protocol Revision Request (NPRR) would require ERCOT to provide the WGR forecast to any QSE contractually affiliated with that WGR. 01/14/2011  Lower Colorado River Authority (LCRA) No 4.2.2 Rejected
NPRR315 Revision of Responsive Reserve Measure to High Emergency Limit (formerly “Revision of Responsive Reserve Measure to Net Dependable Capability) This Nodal Protocol Revision Request (NPRR) changes Responsive Reserve (RRS) Service 20% limit to check against High Emergency Limit (HEL) instead of High Sustained Limit (HSL). 02/02/2011  Morgan Stanley Yes 3.18, 8.1.1.2 Rejected
NPRR336 Authorize ERCOT to Procure Additional RRS During Severe Cold Weather

This Nodal Protocol Revision Request (NPRR) allows ERCOT to procure additional Responsive Reserve (RRS) during cold weather conditions.

03/09/2011  TNMP No 2.1, 6.5.9.3.3 Rejected
NPRR349 Clarification of Ancillary Service Provider’s Responsibilities, Addition of Penalty Factor Charge for Failure to Provide, and Addition of Ancillary Service Capacity Compliance Performance Criteria

This Nodal Protocol Revision Request (NPRR) addresses several issues related to Ancillary Services.

 First, this NPRR revises Protocol Section 4.4.7.4 to add the following description regarding the timing associated with a Qualified Scheduling Entity’s (QSE’s) obligation to deliver the physical Ancillary Service capacity that it has self-arranged or sold to ERCOT from its designated Resources during the Operating Hour.  The QSE’s obligation begins at the top of each Operating Hour and ends with the top of the next Operating Hour and is continuous throughout the Operating Hour. 

Secondly, this NPRR introduces a penalty factor to increase charges to each QSE that fails to provide Ancillary Service capacity as described in Protocol 6.4.8.1.3, Replacement of Ancillary Service Due to Failure to Provide.  The penalty factor is defined as a multiplier that is applied to each of the charge calculations defined in Section 6.7.2.  The penalty factor equals ten for Regulation Up (Reg-Up), Regulation Down (Reg-Down), and Responsive Reserve Services (RRS) and five for Non-Spinning Reserve (Non-Spin) Service.

Finally, this NPRR:

  • Adds an ERCOT monitoring requirement to the Section 8.1 grey box for Ancillary Service capacity performance metrics for failure to provide Ancillary Service capacity; and
  • Adds performance criteria to Section 8.1.1.3 that apply to events that occur when QSEs are unable to meet their Ancillary Service Obligations because of an inability to deliver an Ancillary Service due to a failure to provide (refer to Protocol Section 6.4.8.1.3).  Protocol Section 6.4.8.1.3 allows the QSE the opportunity to replace this undeliverable Ancillary Service capacity, within a time frame acceptable to ERCOT or, otherwise, ERCOT is authorized to use the Supplemental Ancillary Services Market (SASM) or emergency operations processes to replace the Ancillary Service capacity.  The additions to Section 8.1.1.3 allow ERCOT the option to revoke a QSEs Ancillary Service qualification and/or a Resource’s Ancillary Service qualification to provide Ancillary Services when the undeliverable Ancillary Services capacity is not replaced by the QSE, and when such events have occurred more than three times in a month, aggregated for all such events that occur in the month.
04/06/2011  ERCOT No 4.4.7.4, 6.7.2, 8.1, 8.1.1.3 Rejected
NPRR363 Revision to EEA Level 2B ERCOT Requirements During the EILS VDI This Nodal Protocol Revision Request (NPRR) adds an additional requirement for ERCOT to indicate which time period is being dispatched during their Emergency Interruptible Load Service (EILS) Verbal Dispatch Instruction (VDI) to the Qualified Scheduling Entity (QSE) Hotline during EEA Level 2B. 05/04/2011  APX Power Markets No 6.5.9.4.2 Rejected
NPRR367 Shaping of PTP Options Taken to Real-Time to Match Forecasted Load This Nodal Protocol Revision Request (NPRR) requires an Entity taking Point-to-Point (PTP) Options to Real-Time to shape the volume of the instruments to follow its Load forecast. 05/12/2011  CPS Energy Yes 4.4.5.1 Rejected
NPRR368 Clarification of the Purpose of Point-to-Point Options The proposed addition would explicitly state the intention of Point-to-Point (PTP) Options going to Real-Time is to hedge Non-Opt-In Entities (NOIEs) serving their Load. 05/12/2011  CPS Energy Yes 4.4.5 Rejected
NPRR386 Reduce the Frequency of Unregistered Distributed Generation Reports  At the May 10, 2011 COPS meeting, Market Participants expressed interest in reducing the frequency of the unregistered DG reports. Section 16.5 currently requires ERCOT to produce quarterly reports based on the quarterly reports filed by Non-Opt-In Entities (NOIEs). Based on the last report published for Q1 of 2011, the maximum capacity of unregistered DG in any Load Zone is less than 1.4 MW. The amount of man hours spent by ERCOT and Market Participants to collect and report this data will be reduced significantly if the reports are required annually rather than quarterly. 06/15/2011  Harika Basaran on behalf of COPS No 10.2.2, 16.5, Rejected
NPRR418 Reporting of Resource Forced Outages This Nodal Protocol Revision Request (NPRR) will require all Resource Forced Outages to be entered into the Outage Scheduler. 10/05/2011  ERCOT No 3.1.4.5, 3.1.4.6 Rejected
NPRR440 Consideration of Generation Availability in RMR Analyses The Nodal Protocol Revision Request (NPRR) modifies provisions that relate to Reliability Must-Run (RMR) analysis to ensure generation availability is assessed by ERCOT in RMR evaluations over at least a five year planning horizon. 01/30/2012  Paul Rocha on behalf of CenterPoint Energy No 3.14.1, 3.14.1.2 Rejected