| # | Title | Description | Date Posted | Sponsor | Urgent | Protocol Sections | Current Status | Next Group | Next Step |
|---|---|---|---|---|---|---|---|---|---|
| NPRR001 | Section 1, Zonal PRR Synchronization and ERCOT Staff Clarifications | This NPRR incorporates relevant language from the following PRRs that were approved by the Board between April 2004 and February 2006: PRR573, Mothballed Generation Resource Definition and Time to Service Updates; PRR591, Switchable Unit Declaration; PRR593, Reporting of Net Generation and Load (FKA Behind the â??Fenceâ?? Reporting of Load); and PRR611, Reporting of Operation Reserve Capability Under Severe Gas Curtailments. This NPRR also incorporates TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF and documented in the ERCOT Clarification Matrix for Section 1 (11/30/05) and discussed at the 3/28/06 and 3/29/06 TPTF meetings. |
05/19/2006 | TPTF | No | 1 | Approved | ||
| NPRR002 | Section 3, Zonal PRR Synchronization and ERCOT Staff Clarifications | This NPRR incorporates relevant language from the following PRRs that were approved by the Board between April 2004 and February 2006: PRR492, Plan to Alleviate Chronic Local Congestion; PRR513, Verification of Operational Model after Recurring Local Congestion Event; PRR576, Disclosure of OOME, OOMC, and RMR Service; PRR596, Mothballed Generation Resource Estimated Return to Service Dates/PRR573, Mothballed Generation Resource Definition and Time to Service Updates; PRR581, Update RMR Language Due to PUC Rule 25.502; PRR627, RMR Transmission Issues and RMR Contract Extension; and PRR633, TSP Data Information Requirements. PRR307, Controllable Resources, was part of the TNT synchronization because a portion of the PRR language in the current zonal protocols was inadvertently not included in the nodal protocols section 3.17.2(2). This NPRR also incorporates TPTF determinations regarding ERCOT Staff clarification questions as documented in the ERCOT Clarification Matrix for Section 3 and discussed by TPTF and 3/29/06, 4/10/06 and 4/11/06. |
05/19/2006 | TPTF | No | 3 | Approved | ||
| NPRR003 | Section 5, Zonal PRR Synchronization and ERCOT Staff Clarifications | This NPRR incorporates relevant language from PRR537, Increased Congestion Management Flexibility, approved by the Board on 9/21/04. This NPRR also incorporates TPTF determinations regarding ERCOT Staff clarification questions as documented in the ERCOT Clarification Matrix for Section 5 and discussed by TPTF on 1/9/06, 2/6/06, 4/10/06 and 4/11/06. |
05/19/2006 | TPTF | No | 5 | Approved | ||
| NPRR004 | Section 8, Zonal PRR Synchronization and ERCOT Staff Clarifications | This NPRR incorporates relevant language from the following PRRs that were approved by the Board between April 2004 and February 2006: PRR468, Frequency Response Requirements and Monitoring; PRR487, Black Start Resources; PRR490, LaaR Annual Testing Description; PRR535, Reactive Testing; PRR542, Clarifying the LaaR Three-Hour Limit; PRR628, ERCOT Operation Performance â?? Non-Spinning Reserve Service Deployments; and PRR644, Ancillary Service Re-qualification. This NPRR also incorporates TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF and documented in the ERCOT Clarification Matrix for Section 8 on and discussed at the TPTF meeting on 1/9/06. |
05/19/2006 | TPTF | No | 8 | Approved | ||
| NPRR005 | Section 7 ERCOT Staff and TPTF Clarifications | This NPRR incorporates TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF on 1/23/06 and 2/6/06. This NPRR also incorporates the consensus reached by TPTF during discussions on 4/10/06, 4/24/06, 5/8/06 and 5/23/06 regarding revisions to Sections 7.4.2, PCRR Allocation Terms and Conditions, 7.5, CRR Auctions, 7.7.3, Allocation of McCamey Flowgate Rights (MCFRIs) and 7.8, Bilateral Trades and ERCOT CRR Registration System. | 05/30/2006 | TPTF | No | 7 | Approved | ||
| NPRR006 | Section 4 ERCOT Staff Clarifications | This NPRR incorporates TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF on 1/9/06, 5/22/06 and 6/5/06, and documented in the ERCOT Clarification Matrix for Section 4. | 06/12/2006 | TPTF | No | 4 | Approved | ||
| NPRR007 | Section 9 Zonal PRR Synchronization and ERCOT Staff Clarifications | This NPRR incorporates relevant language from: (1) PRR638, Change Settlement Invoice Due Date from 16 Calendar Days to Five Bank Business Days, that was approved by the Board on 2/21/06; and (2) PRR642, Lower Limit to IDR Meters in MRE for True-Up Settlement IDR Threshold, that was approved by the Board on 3/21/06. This NPRR also incorporates TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF on 3/6/06, 4/10/06, 4/24/06, 5/8/06, and 6/5/06, and documented in the ERCOT Clarification Matrix for Section 9. |
06/12/2006 | TPTF | No | 9 | Approved | ||
| NPRR008 | PRR 307 Inclusion in Nodal | Revise the necessary section of the Nodal Protocols to ensure that PRR 307 has been included. | 07/17/2006 | Occidental Chemical Corporation | No | 2, 3.7.1.2, 3.9.1, 3.16, 3.17.2, 4.4.7.2, 6.3.2, 6.5.5.2, 6.5.7.5, 6.5.7.6.1, 6.5.7.6.2.2, 8.1.2.2, 8.1.2.2.2, 8.1.2.3.2, 8.1.2.4 | Approved | ||
| NPRR009 | Section 6 PRR Synchronization and ERCOT Staff Clarifications | This NPRR incorporates: (1) Relevant language from the following PRRs that were the Board between April 2004 and February 2006: · PRR468, Frequency Response Requirements and Monitoring · PRR487, Black Start Resources · PRR496, Block Bidding and Deployment of LaaRs providing Responsive Reserve Service and Non-Spinning Reserve Service · PRR499, Eliminate Fuel Shortage Notice · PRR513, Verification of Operational Model after Recurring Local Congestion Event · PRR531, Load Clarification · PRR543, Schedules and Emergency Assistance Over CFE-ERCOT DC Ties · PRR561, Remove Nuclear and Hydroelectric Generators from Automatic Deployment Software · PRR611, Reporting of Operation Reserve Capability Under Severe Gas Curtailments (2) TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF on 1/23/06, 5/22/06, 6/21/06 and 7/11/06 and documented in the ERCOT Clarification Matrix for Section 6. |
07/17/2006 | Trip Doggett on behalf of TPTF | No | 6 | Approved | ||
| NPRR010 | Synchronization of PRR630 and Section 3, Management Activities for the ERCOT System | This NPRR incorporates PRR630, Private Use Networks, which was approved by the Board on 4/18/06. | 07/17/2006 | Trip Doggett on behalf of TPTF | No | 3.15.2 | Approved | ||
| NPRR011 | Revision to Credit Requirements | Add requirement that a Counter-party in Payment Breach must provide ERCOT with information about its ESI IDs as set forth in the ERCOT Retail Market Guide. | 08/01/2006 | Credit Working Group | No | 16.11.6, 16.11.6.1, 16.11.6.1.1, 16.11.6.1.2, 16.11.6.1.3, 16.11.6.1.4, 16.11.6.1.5, | Approved | ||
| NPRR012 | CRR Granularity in CRR Auction | Revise CRR granularity from whole MWs to tenths of MWs. | 08/09/2006 | Beth Garza on behalf of ERCOT Staff | No | 7.2, 7.4.2, 7.5.5.3 | Approved | ||
| NPRR013 | Section 2, Zonal PRR Synchronization and ERCOT Staff Clarifications | This NPRR incorporates the following: (1) relevant language from the following PRRs that were approved by the Board between April 2004 and February 2006: · PRR 518, Clarification of Requirements Related to Retail Transactions · PRR 522, Collateral Requirements and Credit Changes · PRR543, Schedules and Emergency Assistance Over CFE-ERCOT DC Ties · PRR 573, Mothballed Generation Resource Definition and Time to Service Updates · PRR 591, Switchable Unit Declaration · PRR625, Clarification of Emergency QSE Language · PRR630, Private Use Networks
(2) TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF and documented in the ERCOT Clarification Matrix for Section 8 on and discussed at the TPTF meeting on 3/6/06.
(3) Incorporation of revisions from the testimony of Shams Siddiqi as required by the PUCT in its Order in Docket No. 31540, Proceeding to Consider Protocols to Implement a Nodal Market in the Electric Reliability Council of Texas Pursuant to Subst. R. §25.501 (4/5/06). [Note: TPTF removed PRR307, Load Providing Regulation Services, because it is being addressed by NPRR008.] |
08/09/2006 | TPTF | No | 2 | Approved | ||
| NPRR014 | Zonal PRR Synchronization for Section 16 | This NPRR incorporates relevant language from the following PRRs that were approved by the Board between April 2004 and February 2006: PRR555, Modify Number of Sub-QSEs a Single Entity Can Partition; PRR591, Switchable Unit Declaration; PRR606, User Security Administrators and Digital Certificates; PRR625, Clarification of Emergency QSE Language; and PRR643, Shorten Payment Default Timelines.
This NPRR also incorporates TPTF determinations regarding ERCOT Staff clarification questions as discussed by TPTF and documented in the ERCOT Clarification Matrix for Section 16 and discussed at the TPTF meeting on 3/6/06. [Note: TPTF removed PRR624, Clarification of Market Participant Default Language, for consideration at a later date.] |
08/09/2006 | TPTF | No | 16 | Approved | ||
| NPRR015 | Zonal PRR Synchronization Section 22 Attachment H | This NPRR incorporates relevant language from PRR643, Shorten Payment Default Timelines, approved by the Board on 12/13/05. | 08/09/2006 | TPTF | No | 22 Attachment H | Approved | ||
| NPRR016 | TPTF Cleanup Items for Sections 2, 3, and 16 | This NPRR is proposed to change and correct language for conformance purposes. These issues were discovered during TPTF review of sectional NPRRs on July 10 and July 24 meetings. | 08/09/2006 | TPTF | No | 2.1, 3.7.1.2, 3.9.1, 3.15, 3.19.1, 3.19.3, 16.2.1, 16.2.6.1 | Approved | ||
| NPRR017 | Discontinuation of Interest Charge for Defaulting Entities at Time of Uplift | This PRR allows ERCOT to cease the calculation of interest (Late Fees) for defaulting entities when the conditions initiating uplift are met. Late Fee calculations will continue for Short paying entities until uplift conditions are met. | 08/10/2006 | TXU Energy | No | 9.7.3, 9.7.5 | Approved | ||
| NPRR019 | Black Start Testing Requirements | Specifies the requirements for starting the next start Resource; Specifies which tests are allowed to be run simultaneously. | 08/23/2006 | Black Start Task Force | No | 8.1.2.2.6 | Approved | ||
| NPRR020 | ERCOT Nodal Implementation Surcharge | This PRR documents how ERCOT shall calculate the Nodal Implementation Surcharge (NIS) to comply with the Final Order issued in Public Utility Commission of Texas (PUCT) Docket No. 32686, Application of the Electric Reliability Council of Texas for Approval of a Nodal Market Implementation Surcharge and Request for Interim Relief, to fund implementation of the nodal market redesign. | 08/28/2006 | ERCOT Staff | No | 9.16.5 | Approved | ||
| NPRR022 | MIS Posting for Area Trades | Changes MIS area to post trades from the MIS Secure Area to the MIS Certified Area. | 09/05/2006 | ERCOT | No | 4.4.1.2, 4.4.2.2, 4.4.7.3.2 | Approved | ||
| NPRR023 | Correction to Formatting of Section 8.1.2.2.1 | This NPRR corrects the formatting of Section 8.1.2.2.1 so that it conforms to the rest of the Nodal Protocols. | 09/06/2006 | ERCOT Staff | No | 8.1.2.2.1 | Approved | ||
| NPRR024 | Synchronization of PRRs 627 and 640 | This NPRR incorporates relevant language from:
|
09/12/2006 | TPTF | No | 3.14.1.11, 3.14.1.13, 3.14.1.16, 6.6.6.1, 22F | Approved | ||
| NPRR025 | Definition of Annual Planning Model | Provide a definition for Annual Planning Model in Section 3, Management Activities for the ERCOT System. | 09/13/2006 | TPTF | No | 3.10.2 | Approved | ||
| NPRR026 | Nodal Implementation Surcharge Verifiable Costs | This NPRR adds nodal implementation surcharges as a verifiable cost for resources called on for reliability purposes (RUC and RMR). | 09/14/2006 | NRG Texas | No | 3.14.1.10, 5.6.1 | Approved | ||
| NPRR027 | Block Offers in CRR Auction | Revise how CRRs may be offered in the CRR Auctions. CRRs may be bid in CRR Auctions and may be allocated in any time-of-use block. However, CRR bid awards and allocations for a one-month strip of 7x24 block will be split into one-month strips of the 3 other blocks and may be offered into subsequent CRR Auctions as the 3 separate block offers but not as a single 7x24 block. | 09/14/2006 | ERCOT Staff | No | 7.3, 7.5.2.1 | Approved | ||
| NPRR028 | CRR Trading in Blocks Only | Revise how CRRs may be traded in the bilateral market and in CRR Auctions. This revision would limit CRR trading to time-of-use blocks for a particular date and CRR Offers in CRR Auctions to time-of-use blocks. With this revision, CRR Account Holders would not be able to trade a particular hour or a block of hours that is not one of the defined time-of-use blocks in Section 7.3 (6). | 09/14/2006 | ERCOT Staff | Pending | 7.2, 7.5.2.1, 7.5.3.1, 7.8 | Approved | ||
| NPRR029 | Network Model Testing Clarification | Divides the model testing into real time testing, and simulation testing. | 09/15/2006 | ERCOT Staff | No | 3.10.1, 3.10.4 | Approved | ||
| NPRR030 | Addition to CRR Account Holder Qualification Criteria | Adds language describing an entity that is not eligible to own CRRs. | 09/15/2006 | ERCOT Staff | No | 16.8.1 | Approved | ||
| NPRR031 | Correction of Voltage Support Bill Determinants | This NPRR corrects Voltage Support bill determinants and their calculations. | 10/13/2006 | TPTF | No | 6.6.7 | Approved | ||
| NPRR032 | Correction of Black Start Bill Determinants | This NPRR corrects Black Start bill determinants. | 10/13/2006 | TPTF | No | 6.6.8 | Approved | ||
| NPRR033 | Settlement of CRRs When DAM Does Not Execute | This NPRR adds language and formulae that describe how ERCOT shall settle CRRs when ERCOT is unable to execute the Day-Ahead process. | 10/12/2006 | TPTF | No | 4.5.1, 6.6.10, 7.9.2.1, 7.9.2.2, 7.9.2.3, 7.9.2.4, 7.9.2.5, 9.5.3 | Approved | ||
| NPRR034 | Conforming Section 10 to Nodal Format | This NPRR conforms zonal Protocols Section 10 to the standardized format used in the Nodal Protocols. | 10/27/2006 | ERCOT Staff | No | 10 | Approved | PRS | Language consideration |
| NPRR035 | Nodal Protocol Clarifications Required For Net Metering Provisions | Revision to Protocol Section 1.3.1.1(w) adds the submittals to ERCOT by affected Entities that are required under the provisions of Protocol Section 10.3.2.3. This change captures as protected information the descriptions of the metering facilities of all Common Switchyards that contain multiple points of interconnection of Loads (ESIDs) and generation meters (EPS). Revisions to Protocol Section 3.7.1.1 add the requirement to include within the Resource Parameters submittal the methodology and, if utilized, the values of constants in any underlying net injection calculation for each Resource. Revision to Protocol Section 6.5.5.2 clarifies that net power output from generation resources may be provided to ERCOT systems as a measured or calculated value. Revisions to Protocol Section 6.6.3.1, Real-Time Energy Imbalance Payment or Charge at a Resource Node incorporate settlement methodology to be applied in the situation of a net metering installation. Revisions to Protocol Section 10.3.2.3:
|
11/06/2006 | TPTF | No | 1.3.1.1, 3.7.1.1, 6.5.5.2, 6.6.3.1, 10.3.2.3 | Approved | PRS | Language consideration |
| NPRR036 | Market Operations Test Environment (MOTE) in the Nodal Market | In the nodal Market, Transmission Service Providers (TSPs) need access to an environment of the ERCOT EMS where the following are available for their review and analysis a)Network operations model, b) Results of the real -time State Estimator (within 5 minutes of the real time solution) including Contingency Analysis. MOTE serves as a tool to validate the integrity of the ERCOT Network Operations model, and to perform studies that facilitate better coordination of network operations between the TSPs and ERCOT. TSP need to continue to have a tool like MOTE in the Nodal Market. The new MOTE should have all the functionality that the current MOTE offers. |
11/09/2006 | Network Data Support Working Group | No | 3.10.4 | Approved | ||
| NPRR037 | Conforming Section 13 to Nodal Format and Changing Frequency of Transmission Loss Base Case Calculations | This Nodal Protocol Revision Request (PRR) provides changes to the frequency of transmission loss base cases calculations. The NPRR also conforms Protocol Section 13 to the Nodal Protocol format. | 11/20/2006 | Unaccounted For Energy Task Force (UFETF) | No | 13 | Approved | ||
| NPRR038 | Synchronization of PRR624 | This NPRR incorporates relevant language from PRR624, Clarification of Market Participant Default Language, approved by the ERCOT Board of Directors on 12/13/05. | 12/06/2006 | TPTF | No | 16.2.5.2, 16.11.6, 16.11.7 | Approved | ||
| NPRR039 | Availability of Ancillary Service Offers for the Supplementary Ancillary Service Market | This NPRR incorporates the TPTF discussions for available Ancillary Service Offers for the Supplementary Ancillary Service Market. | 02/14/2007 | TPTF | No | 6.4.8.2 | Approved | ||
| NPRR041 | Corrections to Section 4, Day-Ahead Operations | This NPRR is proposed to change and correct language discovered during TPTF review of the associated business requirements. | 02/19/2007 | TPTF | No | 4.4.9.2.1, 4.6.2.3, 4.6.2.3.1, 4.6.5 | Approved | ||
| NPRR042 | Corrections to Section 5, Transmission Security Analysis and Reliability Unit Commitment | This NPRR is proposed to change and correct language discovered during TPTF review of the associated business requirements. | 02/19/2007 | TPTF | No | 5.6.3, 5.7.1.3, 5.7.2, 5.7.3, 5.7.4.1.1, 5.7.4.1.2, 5.7.4.2, 5.7.5 | Approved | ||
| NPRR043 | Corrections to Section 7, Congestion Revenue Rights | This NPRR is proposed to change and correct language discovered during TPTF review of the associated business requirements. | 02/21/2007 | TPTF | No | 7.9.1.1, 7.9.1.2, 7.9.1.3, 7.9.1.4, 7.9.1.5, 7.9.1.6, 7.9.2.2, 7.9.2.3, 7.9.3.3 | Approved | ||
| NPRR044 | Corrections to Section 6, Adjustment Period and Real-Time Operations | This NPRR is proposed to change and correct language discovered during TPTF review of the associated business requirements. | 02/22/2007 | TPTF | No | 6.6.3.2, 6.6.5.4, 6.6.9.1, 6.6.9.2, 6.6.10 | Approved | ||
| NPRR045 | Wind Power Forecasting | 1. Add definitions for terms used in more than one section 2. Describe the process for developing the 80% confidence level forecast for wind-power generators |
02/23/2007 | The Wind Coalition | No | 2.1, 4.2.2 | Approved | ||
| NPRR046 | Real-Time ICCP Communications Only | This NPRR revises how QSEs and TSPs communicate with ERCOT in Real-Time. This Revision Request requires that all Real-Time communications use Inter-Control Center Protocol (ICCP) for all communications. This will retire the existing RTU infrastructure used by ERCOT and its market participants for data exchange.
Market transactions using XML and/or MIS, and RTU communications between Market Participants and their field equipment, will remain unchanged. |
02/27/2007 | ERCOT | No | 3.10.4, 3.10.7.4, 6.3.2, 6.5.7.4, 6.5.7.6.1, 6.5.7.6.2.1, 6.5.7.6.2.2 | Approved | ||
| NPRR047 | Credit Monitoring – ERCOT Staff Clarifications | This NPRR incorporates the following topics: 1. Moving definition of Counter-Party from Section 16, Registration and Qualification of MPs, to Section 2, Definitions and Acronyms. 2. Validation and enforcement of credit constraints at the Counter-Party level in the DAM and CRR Auctions. 3. Provision of separate credit limit for DAM and CRR Auctions. 4. Clarification on calculating credit exposure and Available Credit Limit on Business Days. 5. Clarification on the language regarding Today’s Value of PTP Obligation, PTP Option and Flow Gate Rights. 6. Clarification on the terminology for pricing components of Mark to Market Value for Flow Gate Rights 7. Clarification on the flexibility to modify weighting factors associated with pricing components of Mark to Market Value for PTP Obligation, PTP Option and Flow Gate Rights. 8. Tracking Payment Breach, Late Payment by Market Participants instead of by Counter-Party. 9. Moving and clarifying language about forfeiture of CRRs from Section 9.9.1 to a new sub-section on “Declaration of forfeit of CRRs” in the Payment Breach section. |
03/02/2007 | TPTF | No | 2.1, 4.4.10, 7.5.5.3, 9.9.1, 16.11, 16.11.4.3, 16.11.4.4, 16.11.4.5, 16.11.4.6, 16.11.4.7, 16.11.6, 16.11.7, 16.11.8 | Approved | ||
| NPRR048 | Revised Wording of Opportunity Outages for Transmission Facilities | The proposed Opportunity Outages rewording will allow ERCOT to grant a TSP permission to work on TSP-owned equipment that can only be maintained when a Resource is off-line for a Forced, Planned or Maintenance Outage. | 03/08/2007 | Trip Doggett on behalf of TPTF | No | 2.1, 3.1.6.8 | Approved | ||
| NPRR049 | Generation Subsystem Changes to Incorporate Approved Whitepapers | Generation Subsystem changes to incorporate TPTF-approved whitepapers on the following topics: 1) Generation Resource Responsive Reserve Deployment and Recall; 2) Ancillary Service Schedules and Deployment Telemetry; 3) Non-Spin Deployment Notification and Availability; 4) SCED Base Point Dispatch; and 5) Base Point above HASL Flags. | 03/08/2007 | Trip Doggett on behalf of TPTF | No | 2.1, 3.9.1, 3.9.2, 6.5.5.2, 6.5.7.2, 6.5.7.3, 6.5.7.4, 6.5.7.5, 6.5.7.6.1, 6.5.7.6.2.2, 6.5.7.6.2.3 | Approved | ||
| NPRR050 | Clarifications for HSL Values for WGRs and WGR Values to be Used in the RUC Capacity Short Calculation | The proposed clarifications:
1) Eliminate 4.2.2(6) because of inconsistency with Protocol language in 3.9.1(7), Current Operating Plan (COP) Criteria (“A QSE representing a Wind-Powered Generation Resource (WGR) must enter an HSL value that is less than or equal to the amount for that Resource from the most recent Wind-Powered Generation Resource Production Potential provided by ERCOT”); 2) Eliminate 4.2.2(7) because the settlement information is described in 5.7.4.1, Capacity Shortfall Ratio Share; and 3) Revise 5.7.4.1.1 to clarify how to do the settlements. |
03/12/2007 | Trip Doggett on behalf of TPTF | No | 4.2.2, 5.7.4.1.1 | Approved | ||
| NPRR051 | Removal of the Pseudo Resource Requirement in the Real Time Security Constrained Economic Dispatch (SCED) Process | This NPRR removes the requirement to employ a pseudo resource from the SCED Process in Section 6.5.7.3. | 03/12/2007 | Trip Doggett on behalf of TPTF | No | 6.5.7.3 | Approved | ||
| NPRR052 | Settlement for Non-Modeled Generators | Revise Real-time Energy Imbalance settlement to include payment of energy produced by Non-Modeled Generators | 03/12/2007 | TPTF | No | 6.6.3.2, Real-Time Energy Imbalance Payment or Charge at a Load Zone | Approved | ||
| NPRR054 | Update of Nodal Protocols to Comply with NERC Name Change â?? Companion to PRR711 | This Nodal Protocol Revision Request (NPRR) updates Nodal Protocol References to reflect the recent NERC name change. NERC recently changed its name from North American Electric Reliability Council to North American Electric Reliability Corporation. | 03/14/2007 | ERCOT | No | 1.2, 1.3.6, 2.2, and 6.5.9.1 | Approved | ||
| NPRR055 | Correction of Voltage Support QSE Total Bill Determinants | This NPRR corrects Voltage Support QSE Total bill determinants and their calculations for the purpose of breaking out the Voltage Support Charge Types on the settlement statement. | 03/27/2007 | Transition Plan Task Force (TPTF) | No | 6.6.7, 9.5.3 | Approved | ||
| NPRR057 | Posting Requirements Pursuant PUC Subst. R. 25.505 | This NPRR implements posting requirements outlined in new P.U.C. Subst. R. 25.505, Resource Adequacy in the Electric Reliability of Texas Power Region. | 04/09/2007 | TPTF | No | 3.2, Analysis of Long-Term Resource Adequacy; 3.2.1, Calculation of Aggregate Generating Capacity; 3.2.2, Long-Term Demand Forecasts; 3.2.3, System Adequacy Report; 3.2.4, Statement of Opportunities (New); 3.12, Load Forecasting; 3.12.1, Mid-Term Load Forecast; 3.12.2, Long-Term Load Forecast 3.13, Renewable Production Potential Forecasts; 4.2.3, Posting Forecasted ERCOT System Conditions. | Approved | ||
| NPRR058 | Clarification of Standard Form Market Participant Agreement | Remove discrepancies between Section 16, Registration and Qualification of MPs, and Section 22 – former Attachment H, now Attachment B, Standard Form Market Participant Agreement. The primary change is removing legacy references to individual Agreements that have since been consolidated into a single Standard Form Market Participant Agreement. | 04/10/2007 | TPTF | No | 16.1, Qualification, Registration, and Execution of Agreements; 16.2, Registration and Qualification of Qualified Scheduling Entities; 16.3, Registration of Load Serving Entities; 16.4, Registration of ERCOT and Non-ERCOT Transmission and Distribution Service Providers; 16.5, Registration of a Resource Entity; and 22, Attachment H, Standard Form Market Participant Agreement | Approved | ||
| NPRR059 | Reconfiguring the Annual CRR Auction | This Nodal Protocol Revision Request (NPRR) reconfigures the annual Congestion Revenue Right (CRR) Auction from a 24-month simultaneous optimization of three Time Of Use (TOU) blocks to separate optimizations for each TOU block for each year. | 05/01/2007 | Trip Doggett on behalf of TPTF | No | 7.3, 7.5.1 | Approved | ||
| NPRR060 | Hub Clarification | This Nodal Protocol Revision Request (NPRR) clarifies the concept of “Hub Bus” allowing for direct assignment of Electrical Buses to a Hub and clarifies the number of Hub Buses in a Hub based on operating model Electrical Bus configuration. | 05/01/2007 | Trip Doggett on behalf of TPTF | No | 2.1, 3.5, 3.5.1, 3.5.2 | Approved | ||
| NPRR061 | Scarcity Pricing Mechanism | NPRR061 revises the ERCOT Nodal Protocols to provide for a scarcity pricing mechanism as required by subsection (g) of P.U.C. SUBST. R. 25.505, Resource Adequacy in the Electric Reliability Council of Texas Power Region. |
05/02/2007 | TPTF | No | 2.1, Definitions; 2.2, Acronyms and Abbreviations; 4.4.7.2.1, Ancillary Service Offer Criteria; 4.4.9.3.1, Energy Offer Curve Criteria; 4.4.9.5.1, DAM Energy-Only Offer Curve Criteria; 4.4.11, System-Wide Offer Caps (New); 4.4.11.1, Scarcity Pricing Mechanism (New); and 6.5.7.3, Security Constrained Economic Dispatch | Approved | ||
| NPRR062 | Constraint Competitiveness Test | This revision provides clarification on the process for determining competitive constraints as defined in Section 3.19, Constraint Competitiveness Test (CCT). | Trip Doggett on behalf of TPTF | No | 3.19, Constraint Competitiveness Tests |
Approved | |||
| NPRR063 | Electrical Bus Clarification | This NPRR provides clarification on designation of Electrical Buses within the Network Operations Model that will meet the needs of the Nodal Market. | 05/24/2007 | TPTF | No | 2.1 | Approved | ||
| NPRR064 | Modeling of Generic Transmission Constraints | This Nodal Protocol Revision Request (NPRR) provides for the definition of and posting of Generic Transmission Limits (GTLs) in Network Operations Modeling requirements. | 05/29/2007 | Trip Doggett on behalf of TPTF | No | 2.1, 2.2, 3.10, 3.10.7.5 | Approved | ||
| NPRR065 | Synchronization of PRR647, Gross and Net MW/Mvar Data Reporting | This NPRR synchronizes relevant language from PRR647, Gross and Net MW/Mvar Data Reporting, that was approved by the ERCOT Board (Board) on 1/16/07, with NPRR035, Nodal Protocol Clarifications Required For Net Metering Provisions, and incorporates these changes into the Draft Nodal Protocols. | TPTF | No | 3.7.1.1, Generation Resource Parameters and 6.5.5.2, Operational Data Requirements | Approved | |||
| NPRR066 | Synchronization of PRR698, Remove Default QSE Provisions | This NPRR incorporates relevant language from PRR698, Remove Default QSE Provisions, which was approved by the ERCOT Board of Directors on 12/12/06. This NPRR revises provisions for the Emergency and Virtual Qualified Scheduling Entity (QSE) to allow them to provide for Resource Entities and Load Serving Entities (LSEs) in the event that their QSEs are suspended. This NPRR also removes the Default QSE concept, including all references to a Default QSE. | 06/13/2007 | TPTF | No | 16.2.1, 16.2.5, 16.2.6.1, 16.2.6.2, 16.2.6.3, 16.11.6.1.5 | Approved | ||
| NPRR067 | Modeling of Private Use Networks | This Nodal Protocol Revision Request (NPRR) provides a mechanism for ERCOT to model generation located within a Private Use Network. | 06/15/2007 | Trip Doggett on behalf of TPTF | No | 2.1, 3.10.7.2, 3.10.7.3 (new), 3.10.7.3, 3.10.7.4, 3.10.7.4.1, 3.10.7.4.2 | Approved | ||
| NPRR068 | Settlement Clarifications to Startup Eligibility, Decommitment Payments and Corrections to RUC Formulas | This NPRR Clarifies the sections that dealing with whether a Resource is Eligible for startup compensation in the Day-Ahead and Reliability Unit Commitment (RUC) Make-Whole payment calculations; modifies the definition of the hours used in calculating the RUC Decommitment Payment in Section 5.7.3; and Corrects the parentheses in three formulas in Section 5.7.1.1. |
06/15/2007 | ERCOT Staff | No | 4.4.9.2, Startup Offer & Minimum-Energy Offer; 4.4.9.2.3, Startup Offer & Minimum-Energy Offer Generic Caps; 4.6.2.3 Day-Ahead Make-Whole Settlements; 5.6.2, RUC Startup Cost Eligibility; 5.7.1.1, RUC Guarantee; and 5.7.3, Payment When ERCOT Decommits a QSE-Committed Resource | Approved | ||
| NPRR069 | Changes to SURAMP | This NPRR revises the Security Constrained Economic Dispatch (SCED) Up Ramp Rate (SURAMP) formulation. This change removes reserving part of Ramp Rate for Responsive Reserve Service (RRS) deployment by Load Frequency Control (LFC) | 06/15/2007 | ERCOT Staff | No | 6.5.7.2, Resource Limit Calculator | Approved | ||
| NPRR070 | Changes to DAM Clearing Start Time Allocation of McCamey Flowgate Rights in Day-Ahead Market | This Nodal Protocol Revision Request (NPRR) changes the requirement for DAM clearing to start at 1000 in the Day-Ahead Market to allow time for submission validations. This NPRR incorporates the TPTF discussions for Allocation of McCamey Flowgate Rights (MCFRIs) in Day-Ahead. |
06/18/2007 | ERCOT | No | 4.5.1, 7.7.3 | Approved | ||
| NPRR071 | Trade Validation by Matching Identical Trade Submissions | This NPRR incorporates the TPTF determination regarding Trade confirmation. | 06/18/2007 | ERCOT Staff | No | 4.4.1.2, 4.4.2.2, 4.4.7.3.2 | Approved | ||
| NPRR072 | Day-Ahead RMR Settlement Clarifications | This NPRR modifies the Day-Ahead Make-Whole Payment calculation such that an Amount data cut is not calculated for an eligible Reliability Must Run (RMR) Unit; consistent with the Protocol requirement prohibiting RMR Units from receiving payment through the Day-Ahead Make Whole Payment. |
ERCOT Staff | No | 4.6.2.3.1 Day-Ahead Make-Whole Payment; and 4.6.2.3.2 Day-Ahead Make-Whole Charge | Approved | |||
| NPRR073 | Update of Sections 6.6 and 6.7 Due Requirements, Use Cases and CSDs | This NPRR revises Sections 6.6, Settlements Calculations for the Real-Time Energy Operations, and 6.7, Real-Time Settlement Calculations for the Ancillary Services, to align them to the Requirements, Use Cases and Conceptual System Designs (CSDs). | 06/19/2007 | ERCOT Staff | No | 6.6, 6.7 | Approved | ||
| NPRR075 | Section-9, Settlements Clean-up | This Nodal Protocol Revision Request (NPRR): 1. Clarifies the contents of the various invoices. 2. Clarifies the payment dates for the various invoices. 3. Corrects the list of Day Ahead Market (DAM) Settlement Charge Types. 4. Specifies contents and timing of Reat Time Market (RTM) Uplift Invoices 5. Corrects the Real Time Adjusted Meter Load (RTAML) definition for the ERCOT System Administrative Charge |
06/20/2007 | Jeyant Tamby, ERCOT | No | 9 | Approved | ||
| NPRR076 | Synchronization of Emergency Electric Curtailment Plan (EECP) Event Realignment | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with PRR682, EECP Event Realignment, which was approved by the ERCOT Board on November 14, 2006. | 07/02/2007 | TPTF | No | 2.1, 2.2, 6.5.7.5, 6.5.9.4, 6.5.9.4.1 (new), 6.5.9.4.1 | Approved | ||
| NPRR077 | Incorporating the ERCOT Internal Audit Department and Other Clarifications | This PRR incorporates the ERCOT Internal Audit Department into the Protocols, clarifies the audits to be performed, and the treatment of audit results. Responsibility for performing the annual operational or “settlements” audit, otherwise commonly known as the Statement on Auditing Standards (SAS) No. 70 (“SAS 70”), Type II report, will continue to be performed by an external independent certified public accounting firm. Upon approval of this PRR, responsibility for performing the other audits referenced in Protocol Section 1.4, Operational Audit, will transition to the Internal Audit Department. | 08/07/2007 | ERCOT Staff | No | 1.4.2, 14.3.1, 1.4.3.1.1, 1.4.4, 1.4.5, 1.4.6 | Approved | ||
| NPRR078 | Simplifying the Dispute Process | This PRR removes the concept of “timely” disputes that can still be worked by ERCOT, and removes the concept of disputing settlement statements. Instead, disputes that are filed with enough time for ERCOT to work them, as defined in the Protocols modified by this revision, will be worked and included in the next settlement statement if granted. | Settlements & Data Aggregation Working Group | No | 9.1.2, Settlement Calendar; 9.5.6, RTM Resettlement Statement ;9.14.2, Notice of Dispute; 9.14.3, Contents of Notice; and 9.14.4, ERCOT Processing of Disputes | Approved | |||
| NPRR080 | Revised Wording of Protocol Section 3.1.5.1 | The proposed rewording of Protocol Section 3.1.5.1 will allow ERCOT to treat electrical buses as consequentially outaged transmission elements in the ERCOT Outage Scheduler. | 08/16/2007 | CenterPoint Energy | No | 3.1.5.1, ERCOT Evaluation of Planned Outage and Maintenance Outage of Transmission Facilities | Approved | ||
| NPRR081 | Automatic Voltage Regulator (AVR) Status | This NPRR adds a requirement for telemetry of Generation Resource AVR status to comply with North American Electric Reliability Corporation (NERC) Reliability Standards. | 08/31/2007 | ERCOT Staff | No | 3.15.3, QSE Responsibilities Related to Voltage Support | Approved | ||
| NPRR082 | Section 8, Performance Monitoring and Compliance, Revisions to Monitoring and Qualification Tests | This NPRR makes the testing and compliance requirements consistent with NPRR049, Generation Subsystem Changes to Incorporate Approved Whitepapers, and the white papers “Generation Resource Responsive Reserve Deployment and Recall” and “Non-Spin Deployment Notification and Availability” approved by TPTF located at http://nodal.ercot.com/docs/pd/mms/index.html#oth. | 09/11/2007 | TPTF | No | 8.1.2.2.3, 8.1.2.2.4, 8.1.2.4.2, 8.1.2.4.3 | Approved | ||
| NPRR083 | Remove Real-Time Energy Charge for a BLT from List of Real-Time Charge Types | This NPRR removes Real-Time Energy Charge for a Block Load Transfer Point from the list of charge types for the Real-Time Market. | 10/11/2007 | ERCOT Staff | No | 9.5.3, Real-Time Market Settlement Charge Types | Approved | ||
| NPRR084 | Creating Amendment to Standard Form Market Participant Agreement | This NPRR adds a new form, Amendment to Standard Form Market Participant Agreement, to the ERCOT Protocols. | 10/23/2007 | ERCOT Staff | No | 22B, C, F | Approved | ||
| NPRR085 | Revision of Digital Certificate Procedures | This NPRR documents, in Section 16.11.3, Market Participant Audits of User Security Administrators and Digital Certificates, the requirement that Market Participants generate their own list of USA and Digital Certificate holders for audit purposes and use an automated process to manage (i.e., enroll, renew, revoke, and audit) their Digital Certificates. This NPRR also clarifies the language describing the responsibilities of the Market Participant, its USA and ERCOT. | 10/24/2007 | ERCOT Staff | No | 16.12 | Approved | ||
| NPRR086 | Settlement Clarifications to RUC Capacity Shortfall Ratio Share Formula | This NPRR revises Section 5.6.4.1.1 to clarify that the Capacity Shortfall Ratio Share includes DC Tie imports and exports; modifies the definition of the variable HASLADJ (High Ancillary Service Limit) used in calculating the Reliability Unit Commitment (RUC) Capacity Shortfall Ratio Share in Section 5.7.4. ; and modifies the definition of the variable LSL to reflect that its value is the same as the Low Sustained Limit (LSL) in the Current Operating Plan (COP). |
10/25/2007 | TPTF | No | 5.7.1.1, RUC Guarantee; 5.7.1.2, RUC Minimum-Energy Revenue; 5.7.1.3, Revenue Less Cost Above LSL During RUC-Committed Hours; 5.7.1.4, Revenue Less Cost During QSE Clawback Intervals; 5.7.3, Payment When ERCOT Decommits a QSE -Committed Resource; and 5.7.4.1.1, Capacity Shortfall Ratio Share | Approved | BOARD | |
| NPRR087 | Market Monitor Terminology Change | This Nodal Protocol Revision Request (NPRR) replaces the term Wholesale Electric Market Monitor (WEMM) with the term Independent Market Monitor (IMM). | 10/30/2007 | ERCOT Staff | No | 1.1, Summary of the ERCOT Protocols Document; 1.3, Confidentiality ;1.3.1, Restrictions on Protected Information; 1.3.6, Exceptions; 2, Definitions and Acronyms; 3.7, Resource Parameters; 3.10.4, ERCOT Responsibilities; 3.10.7.5, Telemetry Criteria; 3.10.8, Dynamic Ratings; 3.11.4, Transmission Planning Responsibilities; 3.19, Constraint Competitiveness Tests; 6.5.7.3, Security Constrained Economic Dispatch; 8.2, ERCOT Performance Monitoring and Compliance; 17.1, Overview; 17.2, Objectives and Scope of Market Monitoring and Data Collection; 17.3, Market Data Collection and Use; 17.3.1, Information System Data Collection and Retention; 17.3.3, Accuracy of Data Collection; 17.3.4, PUCT Staff and WEMM Review of Data Collection; 17.5, Reports to PUCT Staff, WEMM, and the FERC; and 17.6, Changes to Facilitate Market Operation | Approved | ||
| NPRR088 | Revision to 16.11.5, Monitoring of a Counter-Party’s Creditworthiness and Credit Exposure by ERCOT | The revision ensures that ERCOT will receive and accept as sufficient from the Counter-Party, financial statements of the Counter-Party or a guarantor if a guarantee is being provided for the purpose of determining the Counter-Party’s creditworthiness. | 10/31/2007 | Reliant Energy | No | 16.11.5 | Approved | ||
| NPRR089 | Changing Posting Requirement of Certain Documents From MIS Secure to Public Area | This NPRR changes the requirement to post “Other Binding Documents” from the Market Information System (MIS) Secure Area to the MIS Public Area. | 11/07/2007 | ERCOT Staff | No | 1.1 | Approved | ||
| NPRR090 | Corrections of FIP-FOP in Energy Offers | This NPRR corrects the submission and use of Fuel Index Price/ Fuel Oil Price (FIP/FOP) percentages in Energy Offers and separates FIP/FOP percentages for Startup Offer and Minimum-Energy Offer. | 12/05/2007 | TPTF | No | 4.4.9.2.1, 4.4.9.2.3, 4.4.9.3.1, 4.4.9.3.3, 4.4.9.4.1, 4.4.9.4.2, | Approved | ||
| NPRR091 | Scarcity Pricing and Mitigated Offer Cap During the Period Commencing on the Nodal Market Implementation Date and Continuing for a Total of 45 Days | This Nodal Protocol Revision Request (NPRR) adds: (1) A provision to Section 3.19 that all transmission constraints are treated as non-competitive constraints during an initial 45 Operating Day period, beginning with the Texas Nodal Market Implementation Date (TNMID). (2) New Section 4.4.11.2, which requires that the System-Wide Offer Cap (SWCAP) be set to the higher of $180 per MWh or 18 mmBtu per MWh times the Fuel Index Price (FIP) during an initial 45 Operating Day period, beginning with the TNMID, provided that a Market Participant who burns fuel oil rather than natural gas may dispute the use of $180 per MWh or 18 mmBtu heat rate per MWh times FIP if the Generation Resource’s Settlement Point Price does not cover the cost incurred by the Market Participant to provide energy or Ancillary Services. This new section also establishes an Energy Offer Curve floor adjusted to -$50 per MWh. |
12/05/2007 | TPTF | No | 3.19, 4.4.11.2 | Approved | BOARD | |
| NPRR092 | Remove Voltage Schedules Requirement | This Nodal Protocol Revision Request (NPRR) will remove the requirement for ERCOT to post hourly voltage schedules on the MIS Secure Area. | 12/14/2007 | John Adams, ERCOT | No | 6.5.7.1.13, Data Inputs and Outputs for the Real-Time Sequence and SCED | Approved | BOARD | Board of Directors consideration |
| NPRR094 | Correct Reference to CRR Credit Limit | ERCOT will be determining credit limits for Counter-Parties, not Congestion Revenue Right (CRR) Account Holders. CRR Account Holders will have the flexibility to manage their credit limits (as a subset of their Counter-Party) for each CRR auction activity. | 01/02/2008 | Trip Doggett on behalf of Texas Nodal Transition Plan Task Force (TPTF) | No | 7.5.3, ERCOT Responsibilities and 7.5.5, Auction Clearing Methodology | Approved | ||
| NPRR095 | Clarify Recipients of MCFRIs | To clarify that MCFRIs are to be allocated to Congestion Revenue Right (CRR) Account Holders either affiliated with or designated by Wind Generation Resources (WGR) located in the McCamey area. | 01/02/2008 | Trip Doggett on behalf of Texas Nodal Transition Plan Task Force (TPTF) | No | 7.7.1, 7.7.2 and 7.7.3 | Approved | ||
| NPRR096 | Revisions to the RMR Startup Energy Payment | This Nodal Protocol Revision Request (NPRR) incorporates language from the COMS Eligibility Process for Settlements Requirements (B2) (v3.0) (Eligibility Process) document approved by the Transition Plan Task Force (TPTF) on October 8, 2007. The proposed language is consistent with the language in the Eligibility Process to determine if a Reliability Must Run (RMR) Unit is to be compensated for its startup costs as well as Protocol Sections 5.6.2, RUC Startup Cost Eligibility, and 5.6.3, Forced Outage of a RUC-Committed Resource. | ERCOT Staff | No | 6.6.6.2, RMR Payment for Energy | Approved | |||
| NPRR097 | Changes to Section 8 to Incorporate Role of TRE, the IMM, and the Concept of Market Compliance | This Nodal Protocol Revision Request (NPRR) incorporates relevant concepts from the TAC Approved EMS and MMS Business Requirements and Conceptual Design Documentation to bring Section 8 AS Qualification Testing and Performance Monitoring in to conformance with the current nodal market AS deployment design. Additionally changes are made to make Section 8 properly reflect the role of the IMM and to delineate the concept of market compliance vs. reliability compliance for the purposes of the TRE. This NPRR also incorporates Transition Plan Task Force (TPTF) determinations regarding ERCOT Staff clarification questions as discussed by TPTF as discussed at the 12/3/06 and 12/18/06 TPTF meetings. |
01/08/2008 | TPTF | No | 8 | Approved | TAC | TAC consideration |
| NPRR098 | Protocol Sections 4 and 6 Formula Clarifications and Related Revisions | This Nodal Protocol Revision Request (NPRR) revises parts of Sections 4.6.4.2 and Sections 6.6.7, 6.6.9.1 and 6.7.3 to add clarity to the formulas for charges related to certain Ancillary Services and variable definitions or data elements. | 01/09/2008 | TPTF | No | 4.6.4.2, Charges for Ancillary Services Procurement in the DAM; 6.6.7, Voltage Support Settlement; 6.6.9.1, Payment for Emergency Power increase directed by ERCOT; 6.7.3, Real Time Settlements calculations for Ancillary Services | Approved | ||
| NPRR099 | RMR Incentive Factor Payment | This Nodal Protocol Revision Request (NPRR) removes language that would allow the Incentive Factor payment in Reliability Must Run (RMR) Agreements to be reduced if, in ERCOT’s determination, the reduction in capacity materially affects reliability. | 01/09/2008 | Trip Doggett on behalf of Texas Nodal Transition Plan Task Force (TPTF) | No | 3.14.1.13, Incentive Factor. | Approved | BOARD | Board of Directors consideration |
| NPRR100 | PCRR Release Mechanism | This Nodal Protocol Revision Request (NPRR) removes the Pre-Assigned Congestion Revenue Right (PCRR) release concept, replacing it with a process in which a fraction of the previously allocated or awarded CRRs are factored into the determination of available network capacity for a CRR auction. | 01/14/2008 | Trip Doggett on behalf of Texas Nodal Transition Plan Task Force (TPTF) | No | 7.4.1, 7.4.2, 7.5.1 and 7.5.6.3 | Approved | BOARD | Board of Directors consideration |
| NPRR101 | Modify Time Requirements for Entry of Equipment in the Outage Scheduler | This Nodal Protocol Revision Request (NPRR) increases the time window from one minute to 30 minutes for requiring entries of equipment outages in the Outage Scheduler. | 02/06/2008 | Trip Doggett on behalf of the Transition Plan Task Force (TPTF) | No | 3.10.7.5.1, Continuous Telemetry of the Status of Breakers and Switches | Approved | BOARD | Board of Directors consideration |
| NPRR102 | Implementation of PUC Subst. R. 25.505(f), Publication of Resource and Load Information | This NPRR incorporates the disclosure requirements pursuant to P.U.C. Subst. R. 25.505, Resource Adequacy in the Electric Reliability of Texas Power Region, paragraph (f), adopted under P.U.C. Project No. 33490, Rulemaking Proceeding to Address Pricing Safeguards in the Markets Operated by the Electric Reliability Council of Texas. |
02/12/2008 | TPTF | No | 1.3.1.2, Items Not Considered Protected Information; and 3.2.5, Publication of Resource and Load Information (NEW) | Approved | BOARD | Board consideration |
| NPRR103 | Settlement of Power Imported via DC Ties and Block Load Transfer Under a Declared Emergency Condition | These revisions add Settlement formulas to pay a Qualified Scheduling Entity (QSE) for emergency energy imported over the DC Ties and for energy supplied to BLT Load moved from the ERCOT control area to a Non-ERCOT control area during a declared Emergency Condition. These payments may only be made for actions taken by the (QSE) in response to an ERCOT Dispatch Instruction. | 02/13/2008 | TPTF | No | 6.6.3.4, Real-Time Energy for DC Tie Import 6.6.3.5, Real-Time Payment for a Block Load Transfer Point | Approved | TAC | ERCOT Board consideration of NPRR103. |
| NPRR105 | Section 23, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 23 with the current Nodal Protocols. | 02/26/2008 | ERCOT | No | Zonal Protocol Section 23 | Approved | ||
| NPRR106 | Section 24, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 24 with the current Nodal Protocols. | 02/26/2008 | ERCOT | No | Zonal Protocol Section 24 | Approved | ||
| NPRR107 | Nodal Emergency Interruptible Load Service (EILS) | This NPRR modifies the ERCOT Nodal Protocols to transition the EILS to the Nodal market. EILS is deployed during an Emergency Electric Curtailment Plan (EECP), after all available Generation and Loads acting as Resources (LaaRs) have been deployed. This NPRR makes no material changes to EILS as it currently is defined in the Zonal Protocols. In various cases, certain language has been modified slightly to enhance clarity. | 02/29/2008 | ERCOT Staff | No | Section 2, Definitions and Acronyms; Section 3.14, Contracts for Reliability Resources; Section 3.14.3, Emergency Interruptible Load Service (EILS) (New); Section 6.5.8.1, Deployment of Emergency Interruptible Load Service (EILS) (New); Section 6.5.9, Emergency Operations; Section 6.5.9.4, Emergency Electric Curtailment Plan Section; 6.5.9.7, Emergency Interruptible Load Service (EILS) (New); Section 6.6.11, Emergency Interruptible Load Service (EILS) Settlement (New); Section 8.1.3, Emergency Interruptible Load Service (EILS) Performance Criteria and Testing Requirements (New); Section 9.14.5, Resettlement of Emergency Interruptible Load Service (New); (subsequent subsections in Section 9.14 renumbered); Section 16.13, Registration of Emergency Interruptible Load Service (EILS) Resources (New); Section 22 -- Attachment 22K, Standard Form Emergency Interruptible Load Service Agreement (Reformatted) | Approved | TAC | Consideration of NPRR107 by TAC. |
| NPRR108 | Fuel Oil Price (FOP) Clarification | This Nodal Protocol Revision Request (NPRR) clarifies that the five-cent adder is charged by the gallon and removes language referencing to the Fuel Oil Price (FOP) for days when the Platts Oilgram Price Report is not published. | 03/03/2008 | ERCOT Staff | No | 2.1, Definitions | Approved | ||
| NPRR109 | Section 18, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 18 with the current Nodal Protocols. | 03/03/2008 | Giriraj Sharma, ERCOT | No | 18 | Approved | ||
| NPRR110 | Section 20, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 20 with the current Nodal Protocols. | 03/03/2008 | ERCOT Staff | No | Section 20, Alternative Dispute Resolution Process | Approved | ||
| NPRR111 | Timelines for Response by ERCOT to TSP Requests | This Nodal Protocol Revision Request (NPRR) proposes two revisions in the table in Section 3.1.5.3(1): The first revision proposes changing “three” to “four” to make the timeline internally consistent. The current wording could require approval of an Outage six hours prior to its submission. The second revision proposes increasing the “approval window” for the 45-day timeline from five days to 15 days (as it is in Zonal Protocols). |
03/04/2008 | Woody Rickerson, ERCOT | No | 3.1.5.3, Timelines for Response by ERCOT for TSP Requests | Approved | ||
| NPRR112 | Emergency Base Point Price Revision | This Nodal Protocol Revision Request (NPRR) clarifies the calculation of the Emergency Base Point Price per QSE per Resource by interval (EBPPR) variable. | 03/03/2008 | ERCOT Staff | No | 6.6.9.1, Payment for Emergency Power Increase Directed by ERCOT | Approved | ||
| NPRR113 | Load Resource Type Indicator for Ancillary Service (AS) Trades and Self-Arranged AS | This Nodal Protocol Revision Request (NPRR) adds an indicator to Self-Arranged Ancillary Services (AS) and AS Trades to reflect if Responsive Reserve Services (RRS) are being provided from a Generation Resource, Controllable Load Resource, or non-controllable Load Resource. | 03/11/2008 | ERCOT Staff | No | 4.4.7.1, Self-Arranged Ancillary Service Quantities; and 4.4.7.3.1, Ancillary Service Trade Criteria | Approved | BOARD | ERCOT Board consideration of NPRR113 |
| NPRR114 | Section 11, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 11 with the current Nodal Protocols. | 03/14/2008 | Giriraj Sharma, ERCOT | No | 11, Data Acquisition and Aggregation | Approved | BOARD | ERCOT Board consideration |
| NPRR117 | Resource Registration Clarification | This NPRR clarifies the obligations of a Resource Entity to register Resource data with ERCOT and the obligations of a Qualified Scheduling Entity (QSE) to submit Resource Parameters for operational purposes to ERCOT. This NPRR also deletes a QSE’s obligation to submit Private Use Network design and engineering data and places the obligation on a Generation Entity with a Generation Resource located within a Private Use Network. | 03/26/2008 | ERCOT | No | 2.1, 3.7, 3.7.1.1, 3.7.1.2, 3.7.1.3 (new), 3.7.2, 6.5.5.2, 16.5 | Approved | BOARD | |
| NPRR118 | Section 14, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 14 with the current Nodal Protocols. | 03/27/2008 | Giriraj Sharma, ERCOT | No | 14 | Approved | BOARD | Board of Directors consideration |
| NPRR119 | Resource Limit Calculator | This Nodal Protocol Revision Request (NPRR) changes the Low Dispatch Limit (LDL) calculation to ensure that the LDL and High Dispatch Limit (HDL) limit sent to the Security Constrained Economic Dispatch (SCED) do not exceed the High Sustained Limit (HSL) under any circumstance. | 03/27/2008 | ERCOT Staff | No | 6.5.7.2, Resource Limit Calculator | Approved | BOARD | ERCOT Board consideration |
| NPRR120 | Corrections and Clarifications for Real Time Settlements | This Nodal Protocol Revision Request (NPRR) makes corrections and clarifications to existing formulas for Real-Time Settlement. | 03/27/2008 | ERCOT Staff | No | 6.6.3.1, Real Time Energy Imbalance Payment or Charge at a Resource Node; 6.6.5.1.1, Base Point Deviation Charge for Over Generation; 6.6.6.1, RMR Standby Payment; 6.6.8.1, Black Start Capacity Payment; 6.6.9.1, Payment for Emergency Power Increase Directed by ERCOT; and 6.6.10, Real Time Revenue Neutrality Allocation. | Approved | BOARD | ERCOT Board consideration |
| NPRR122 | Simplify Ancillary Services Settlement Formulas | This Nodal Protocol Revision Request (NPRR) replaces the Ancillary Service trades and self-supply in the Settlement formulas and replaces them with the self-arranged quantities. This NPRR also, proposes editorial changes to variables and subscripts and adds clarifying language. | 04/07/2008 | ERCOT Staff | No | 4.6.4.1Payments for Ancillary Services Procured in DAM; 4.6.4.2 Charges for Ancillary Services Procurement in the DAM; 6.7.3 Adjustments to Cost Allocations for Ancillary Services Procurement | Approved | TAC | Consideration of NPRR122 by TAC |
| NPRR123 | Inadvertent Energy Account Revision | This Protocol Revision Request corrects the definition for an Inadvertent Energy Account. | 04/09/2008 | ERCOT Staff | No | 6.5.4, Inadvertent Energy Account | Approved | BOARD | ERCOT Board consideration |
| NPRR124 | Resource Node Updated Definitions | This Nodal Protocol Revision Request (NPRR) clarifies the definition for Resource Node and specifies the different Resource Node types that meet the Nodal Protocol requirements. | 04/10/2008 | ERCOT Staff | No | Section 2.1, Definitions | Approved | PRS | Review of Impact Analysis for NPRR124. |
| NPRR126 | Section 19, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 19 with the current Nodal Protocols. | 04/14/2008 | ERCOT | No | 19 | Approved | TAC | TAC consideration of NPRR126 |
| NPRR127 | Section 22 Attachments A, I, J & M, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) Synchronizes Attachments A, I, J and M of zonal Protocol Section 22 with the current Nodal Protocols. | 04/23/2008 | ERCOT | No | 22 Attachments A, I, J & M | Approved | BOARD | ERCOT Board review of NPRR127 |
| NPRR128 | Combined Cycle Power Blocks with Multiple Voltage Interconnections | This Nodal Protocol Revision Request (NPRR) eliminates the unnecessary restriction that requires all generators in a combined cycle power block to be connected to the bulk electric system at the same voltage level. This change must be made for similarly situated combined cycle units to effectively participate in the very important nodal 168-hour test. Re-done resource asset registration forms (RARFs) must also be constructed and validated prior to implementing these changes. | 04/25/2008 | Calpine | No | 6.5.5.2 | Approved | PRS | PRS Impact Analysis Review |
| NPRR129 | Section 15, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 15 with the current Nodal Protocols and moves Section specific definitions and acronyms to Nodal Protocol Section 2, Definitions and Acronyms. | 05/01/2008 | ERCOT | No | 2.1, 2.2 and 15 | Approved | PRS | Impact Analysis review |
| NPRR130 | CRR Settlements Revenue Equalization | This Nodal Protocol Revision Request adds an accounting provision to assure revenue neutrality in the Day-Ahead Market (DAM) financial activity while refunding the proper funds later through the CRR Balancing Account. | 05/09/2008 | TPTF | No | 7.9.3.3, 7.9.3.4, 7.9.3.5 and 9.2.3 | Approved | BOARD | Board of Directors review of NPRR130 |
| NPRR131 | Ancillary Service Trades with ERCOT | Allow all QSEs, whether they represent Resources, Loads, or both, to procure AS in the Day DAM. | 05/15/2008 | NRG Texas | No | 2.1, Definitions; 4.3, QSE Activities and Responsibilities in the Day-Ahead; 4.4.7.1, Self-Arranged Ancillary Service Quantities; 4.4.7.3, Ancillary Service Trades; 4.4.7.4, Ancillary Service Supply Responsibility; 4.4.10, Credit Requirement for DAM Bids and Offers; 4.5.1, DAM Clearing Process; and 4.6.4.2, Charges for Ancillary Services Procurement in the DAM | Approved | BOARD | BOD consideration |
| NPRR132 | Outage Clarification | This Nodal Protocol Revision Request (NPRR) changes the use of the defined term “Outage” to generic “outage” to clarify that the Protocol language regarding outages in the CIM model includes known normal operating status outages, not Outages as defined in Section 2.1, Definitions. . This NPRR also proposes non-substantive edits. |
05/16/2008 | ERCOT Staff | No | 4.2.3, Posting Forecasted ERCOT System Conditions | Approved | TAC | Consideration of NPRR132 by TAC. |
| NPRR133 | Addtion of PSSE Format | This Nodal Protocol Revision Request (NPRR) adds the requirement to post Annual Planning Models and Congestion Revenue Rights (CRR) Network Models in the Power System Simulator for Engineering (PSS/E)format. This NPRR also proposes non-substantive edits. |
05/16/2008 | ERCOT Staff | No | 3.10.2, Annual Planning Model, and 3.10.3, CRR Network Model | Approved | PRS | Review of Impact Analysis |
| NPRR134 | Section 7 Cleanup | This Nodal Protocol Revision Request (NPRR) adds clarifications to the variables that are used in settling McCamey flowgates. This NPRR proposes corrections to flowgate formulae and clarifying variables and subscripts. The NPRR also proposes revisions that streamline the OBLRACT and OPTRACT calculations, but maintain the intent of the original calculations. With this revision, less data is required from Market Management System (MMS) and a complicated calculation is avoided. This revision came about during interface discussions with MMS. |
06/05/2008 | Joel Mickey on behalf of the Texas Nodal Transition Plan Task Force (TPTF) | No | 7.7.3, 7.9.1.4, 7.9.2.4, 7.9.1.5, 7.9.1.6, 7.9.2.3 and 7.9.2.5 | Approved | TAC | TAC consideration of NPRR134 |
| NPRR135 | Deletion of UFE Analysis Zone Language | This Nodal Protocol Revision Request (NPRR) deletes an outdated section pertaining to Unaccounted for Energy (UFE) analysis. | 06/20/2008 | ERCOT | No | 13.4.2 | Approved | PRS | PRS Language Review |
| NPRR136 | Interim Solution for 15-Minute Settlement of Advanced Meters | Implementing this Nodal Protocol Revision Request (NPRR) will support the interim settlement of all provisioned Advanced Meters using actual fifteen minute data, the same way Interval Data Recorder (IDR) meters are settled today, until the long-term solution developed by Project 34610, Implementation Project Relating to Advanced Metering, or future rulemakings is implemented. ERCOT and the Public Utility Commission of Texas (PUCT) have developed a Request for Information to investigate the long-term solution to advanced meter settlement and data transport. The PUCT unanimously approved the “Scope of Work” of the long-term study on May 22, 2008. See P.U.C. SUBST. R. 25.130(h), Advanced Metering. |
06/20/2008 | AEP Texas | No | 9.5.8, 10.3.3.1, 10.3.3.3, 10.12.3, 11.2.2, 18.2, 18.6.7, 18.7.2, 19.7 (new) | Approved | PRS | PRS consideration of Impact Analysis |
| NPRR138 | Credit Monitoring and Management Reports | With implementation of this Nodal Protocol Revision Request (NPRR), ERCOT will post on the Market Information System (MIS) Certified Area, each active Counter-Party’s Credit Monitoring and Management related reports twice a day (by noon and end of day) on Business Days. | 07/11/2008 | Credit Working Group | No | 16.11.4.7 (new) | Approved | PRS | PRS for review of the Impact Analysis and Recommendation Report. |
| NPRR139 | ACL, EAL, FCE Calculation Updates |
|
07/11/2008 | Credit Working Group | No | 16.11.4.3; 16.11.4.5; 16.11.4.6 | Approved | PRS | PRS for consideration. |
| NPRR140 | Revision to CRR Obligation Margin Adder | Revises the margin adder for Point-to-Point (PTP) Obligations to a value “X” to be determined by the subcommittee process. | 07/14/2008 | J. Aron | No | 16.11.4.5, Determination of the Counter-Party Future Credit Exposure | Approved | PRS | PRS consideration |
| NPRR141 | TSP Energy Storage for Reliability (formerly “TSP and/or DSP Energy Storage for Reliability”) | This Nodal Protocol Revision Request (NPRR) inserts new paragraph (f)(iii) in Section 10.3.3.1 that clarifies that metering of energy flows from Transmission Service Provider (TSP) owned battery storage technology is not required for Settlement. This new paragraph will be limited to the Presidio substation Facilities. | 07/21/2008 | American Electric Power Company | No | 10.3.3.1 | Approved | BOARD | ERCOT Board consideration of NPRR141 |
| NPRR142 | EECP Media Appeal Change | This Nodal Protocol Revision Request removes required energy conservation media appeal from Emergency Electric Curtailment Plan (EECP) Step Two and allows ERCOT management to issue a media appeal for energy conservation at management’s discretion, without requiring ERCOT CEO authorization. | 07/22/2008 | John Jonte on behalf of the Operations Working Group (OWG) | No | 6.5.9.4, 6.5.9.4.1, 6.5.9.4.2 | Approved | PRS | PRS language consideration |
| NPRR143 | Section 9.9.1, Invoice Recipient Payment to ERCOT for the CRR Auction, Clean-up | This Nodal Protocol Revision Request (NPRR) corrects conflicting language in Section 9.9.1 and Section 16.11.6.1.5, Declaration of Forfeit of CRRs, by removing language regarding forfeiture of Congestion Revenue Rights (CRRs) from Section 9.9.1. | 07/25/2008 | ERCOT | No | 9.9.1 | Approved | TPTF | TPTF Review |
| NPRR144 | Five RUC Deployments Needed Before Requiring Verifiable Costs | This Nodal Protocol Revision Request (NPRR) will increase the time Qualified Scheduling Entities (QSEs) and Resources have to prepare verifiable cost submissions for units that are unlikely to be struck in the Reliability Unit Commitment (RUC) process. | 07/25/2008 | Heddie Lookadoo on behalf of the VCWG | No | Section 5.6.1, Verifiable Costs | Approved | ||
| NPRR145 | PPAs as Resource-Specific Verifiable Costs Documentation | This Nodal Protocol Revision Request (NPRR) allows Power Purchase and Tolling Agreements (PPAs) to be used as Resource-specific verifiable costs documentation. | 07/25/2008 | Ino González on behalf of the VCWG | No | Section 5.6.1, Verifiable Costs | Approved | ||
| NPRR146 | ICCP Telemetry Information Submittals | This Nodal Protocol Revision Request (NPRR) requires that changes to an existing Network Operations Model Change Request (NOMCR) that modify only Inter-Control Center Communications Protocol (ICCP) data object names be submitted prior to the completion of the testing for the Network Operations Model. | 07/31/2008 | American Electric Power | No | 3.10.1 | Approved | TAC | TAC consideration of NPRR146 |
| NPRR148 | Treatment of Financial Information as Confidential | This Nodal Protocol Revision (NPRR) clarifies that non-public financial information provided to ERCOT is to be treated as Protected Information. |
08/15/2008 | Clayton Greer on behalf of J Aron | No | 1.3.1.1 | Approved | TAC | TAC for consideration. |
| NPRR149 | Change the name of Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA) | This Protocol Revision Request (PRR) changes the name of the Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA). | 08/22/2008 | ERCOT | No | 2.1, 2.2, 3.14.3, 3.17.2, 5.7.2, 6.5.7.6.2.2, 6.5.9.3.4, 6.5.9.4, 6.5.9.4.1, 6.5.9.4.2, 6.5.9.4.3, 8.1.3.1 | Approved | NPRSA | NPRSA Task Force review of NPRR149 |
| NPRR150 | Responsive Reserve Service Offer Floor | This Nodal Protocol Revision Request (NPRR) establishes an offer floor of $0 for Responsive Reserve (RRS) service in the Nodal Market. | 08/28/2008 | DSWG on behalf of WMS | No | 4.4.7.2.1 | Approved | PRS | PRS Impact Analysis review |
| NPRR152 | References to Section 22 Attachments | This Nodal Protocol Revision Request (NPRR) corrects references in the Nodal Protocols to certain attachments to Section 22, Agreements, and re-letters Attachment K, Standard Form Emergency Interruptible Load Service (EILS) Agreement, as Attachment G. | 09/10/2008 | ERCOT | No | 3.14.1.1, 3.14.1.2, 3.14.1.8, 3.14.3, 6.6.6.2, 6.6.8.1, 16.5.1.2, 16.5.1.3, 16.7, 16.10, 16.13, 22K | Approved | ||
| NPRR153 | Generation Resource Fixed Quantity Block | This Nodal Protocol Revision Request (NPRR) revises existing Ancillary Service (AS) Offer criteria to provide for offers of Non-Spin in fixed quantity and time blocks from off-line Generation Resources similar to that for Load Resources. | 09/12/2008 | Transition Plan Task Force (TPTF) | No | 4.4.7.2.1 | Approved | PRS | PRS Impact Analysis review |
| NPRR154 | Corrections of Entities Able to Bid for Point-To-Point Obligations in the Day-Ahead Market | This Nodal Protocol Revision Request (NPRR) provides clarifying language to indicate that only Qualified Scheduling Entities (QSE) may bid for Point-To-Point (PTP) Obligations in the Day-Ahead Market (DAM). | 09/15/2008 | Rachelle Zani on behalf of TPTF | No | Section 7.1, Function of Congestion Revenue Rights | Approved | PRS | PRS consider the Recommendation Report and Impact Analysis |
| NPRR155 | Clarification of Authorized Representative | This Nodal Protocol Revision Request (NPRR) clarifies the need to designate Authorized Representatives for registration for all registered Entities. | 09/18/2008 | ERCOT | No | 10.3.2.1, 16.3, 16.4, 16.5, 16.11.5 | Approved | TAC | TAC Consideration |
| NPRR156 | Transparency for PSS and Full Interconnection Studies | Updates to Section 1 & 12 to provide transparency to status of Power System Stabilizer Equipment and interconnection requests. | 09/19/2008 | Marguerite Wagner/PSEG Texas | No | 1.3.1.1, Items Considered Protected Information 1.3.1.2, Items Not Considered Protected Information | Approved | PRS | PRS consideration |
| NPRR157 | Extending Black Start Service Bid Timeline | This Nodal Protocol Revision Request (NPRR) changes the Black Start Service bids from a one year period to a two year period. | 09/23/2008 | John Dumas on behalf of the Reliability and Operations Subcommittee (ROS) | No | 3.14.2, 22 Attachment D | Approved | PRS | PRS Consideration |
| NPRR158 | EILS Self-Provision Formula Correction and Clarifications | This Nodal Protocol Revision Request (NPRR) proposes to correct terms contained in the Settlement equations related to EILS Self-Provision to make the formulas consistent with the verbal description of EILS Self-Provision Settlement and the author’s stated original intent. Specifically, the formula correction applies to the uplifted costs of EILS as defined in paragraph (3) of Section 6.6.11.2, as follows: · Clarifies that uplifted EILS costs are based on final adjusted EILS obligations after accounting for any self-provided EILS. This is accomplished by establishing and defining a new formula term, EILOF. · Adjusts other related formula terms accordingly. · Adds a missing subscript term definition that appears in numerous places elsewhere in the Protocols. · Adds clarity to certain other equation term definitions. This NPRR also makes clarifications in language contained in paragraph (8)(d) of Section 3.14.3 related to Qualified Scheduling Entities’ (QSEs’) EILS Self-Provision options in cases where less than 1,000 MW of EILS has been offered, and adds copies of definitions that are applicable to both equations in this Section. This NPRR also revises language to: · Clarify that the first Settlement of the Emergency Interruptible Load Service (EILS) Contract Period shall use a QSE Load Ratio Share (LRS) that is based upon the final Load for each Operating Day in the EILS Contract Period; · Introduce a resettlement of EILS Contract Period Settlement utilizing a QSE LRS which is based upon the True-Up Load for each Operating Day in the EILS Contract Period; · Remove conflicting language about EILS disputes; · Clarify the timing by which EILS Settlement disputes must be submitted; and · Move all language related to the timing of the EILS Settlement process to Section 9.14.5. |
09/23/2008 | ERCOT | No | 3.14.3, 6.6.11.1, 6.6.11.2, 8.1.3.1, 9.14.5 | Approved | ||
| NPRR159 | Resource Category Startup Offer Generic Cap for Wind Resources | This Nodal Protocol Revision Request (NPRR) changes the Resource Category Startup Offer Generic Cap for a Wind Resource from a value of $7,200 to zero. | 10/03/2008 | Heddie Lookadoo on behalf of the VCWG | No | 4.4.9.2.3 Startup Offer and Minimum-Energy Offer Generic Caps | Approved | ||
| NPRR160 | Elimination of the Non-ERCOT LSE Fee | Eliminate language within protocol Section 9.16.2 which describes the Texas Non-ERCOT LSE fee. | 10/08/2008 | Barry Smith w/ AEP | No | 19.6.2 | Approved | TPTF | TPTF consideration |
| NPRR161 | Clarification of Establishing Decision-Making Authority of Managed Capacity | This Nodal Protocol Revision Request (NPRR) clarifies Nodal Protocol language on the obligation to provide ERCOT designated decision-making authority over Resources when considering pricing safeguards and when testing for competitiveness in resolving system constraints. The NPRR aligns Nodal Protocol language with the Public Utility Commission of Texas (PUCT) Order adopting P.U.C. Subst. R. 25.502(e), Pricing Safeguards in Markets Operated by the Electric Reliability Council of Texas. | 10/16/2008 | ERCOT | No | 3.19.1 | Approved | ||
| NPRR162 | Change the Sign Convention of Net Real Power Consumption, LPC and MPC of Load Resources (formerly titled “Change the Sign Convention for Load Resources”) | This Nodal Protocol Revision Request (NPRR) revises language for the sign convention for Load Resources. This NPRR changes the Nodal Protocols so that low reasonability limit, Low Sustained Limit (LSL), telemetered values, High Sustained Limit (HSL) and high reasonability limit are all positive numbers for Load Resources. | 11/06/2008 | Kenneth Ragsdale | No | 2.1, Definitions 3.7.1.2, Load Resource Parameters 3.18, Resource Limits in Providing Ancillary Service 6.5.5.2, Operational Data Requirements 6.5.7.2, Resource Limit Calculator | Approved | BOARD | Board consideration |
| NPRR163 | Removal of Late Fee Language | This NPRR removes the concept of late fees calculated on all delinquent amounts. Section 9, Settlements and Billing clearly states that l ate fees are only calculated on delinquent Day-Ahead Market (DAM), Real-Time Market (RTM) and RTM uplift amounts. The late payment fee language in Section 16 conflicts with late fee procedures detailed in Section 9.4.5, Late Fees and Late Fee Invoices for the DAM and 9.7.5 Late Fees and Late Fee Invoices for the RTM. | 11/11/2008 | Keely Hilton | No | 16.11.6.3, Late Payment Fee | Approved | ||
| NPRR164 | Resubmitting Ancillary Service Offers in SASM | This Nodal Protocol Revision Request (NPRR) revises existing rules for resubmitting Ancillary Service (AS) offers in the Adjustment Period to provide for resubmitting those AS offers not awarded in the previous markets at the higher of the Day-Ahead Market (DAM) Market Clearing Price for Capacity (MCPC) for the corresponding AS or the Resource’s offer price for the corresponding AS in the DAM. |
11/12/2008 | Transition Plan Task Force (TPTF) | No | 6.4.8.2.1 | Approved | TAC | TAC consideration of NPRR164 |
| NPRR165 | Synchronizing Section 1 with PRR697 | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 697, Posting Requirement Changes, which incorporated disclosure requirement changes resulting from P.U.C. Subst. R. 25.505, Resource Adequacy in the Electric Reliability of Texas Power Region, adopted under P.U.C. Project No. 33490, Rulemaking Proceeding to Address Pricing Safeguards in the Markets Operated by the Electric Reliability Council of Texas. NPRR057, Posting Requirements Pursuant P.U.C. Subst. R. 25.505, and NPRR102, Implementation of P.U.C. Subst. R. 25.505, Publication of Resource and Load Information, synchronized the Nodal Protocols with most of PRR697; this NPRR synchronizes the remainder. |
11/18/2008 | ERCOT | No | 1.3.1.1, 1.3.1.2, 1.3.3 | Approved | PRS | PRS for language consideration. |
| NPRR166 | Timing for Required Black Start Unit Load Carrying Test | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with changes being proposed to the zonal Protocols through Protocol Revision Request (PRR) 785. This NPRR changes the required Black Start Unit Load Carrying Test from once every six years to once every five years. | 11/20/2008 | ERCOT | No | 8.1.1.2.1.5 | Approved | PRS | PRS Language Review |
| NPRR167 | Options for Filing Verifiable Costs – QSEs or Resources | This Nodal Protocol Revision Request (NPRR) allows either Qualified Scheduling Entities (QSEs) or Resource Entities to file verifiable costs. |
11/24/2008 | Verifiable Cost Working Group (VCWG) | No | 5.6.1 | Approved | ||
| NPRR168 | Change the Definition of "Start-up" and Include the Fuel from Breaker Close to LSL in Startup Costs (formerly titled "Verifiable Costs General Corrections") | This Nodal Protocol Revision Request (NPRR) allows Qualified Scheduling Entities (QSEs) to file Resource fuel consumption from breaker close to Low Sustained Limit (LSL) and breaker open to shutdown. | 11/24/2008 | Verifiable Cost Working Group (VCWG) | No | 4.4.9.2, 4.4.9.2.3, 5.6.1, 5.7.1.1, 5.7.3 | Approved | TAC | TAC consider the PRS Recommendation Report and IA |
| NPRR169 | Clarify the Calculation and Posting of LMPs for the Load Zone and LMPs for each Hub | This Nodal Protocol Revision Request (NPRR) clarifies language that specifies the calculation and posting of LMPs for the Load Zone and “LMPs for each Hub”. | 12/16/2008 | Joel Mickey on behalf of the Transition Plan Task Force (TPTF) | No | 2.1, 6.3.2, 6.6.1.2, 6.6.1.4 (new), 6.6.1.5 (new) | Approved | ||
| NPRR170 | Synchronization of PRR806, Re-Registration of Market Participant due to Mass Transition of ESI IDs | This Nodal Protocol Revision Request (NPRR) requires re-registration as a Market Participant (MP) if they transfer Electric Service Identifiers (ESI IDs) from one Competitive Retailer (CR) to another using the Mass Transition process. This NPRR creates Section 16.1.1, Re-Registration as a Market Participant, to identify the circumstances in which an MP would have to re-register as an MP. |
04/01/2009 | Jennifer Frederick on behalf of the Texas Standard Electronic Transaction (Texas SET) Working Group | No | 15.1.3, 16.1.1 | Approved | ||
| NPRR171 | Synchronization of PRR805, Adding POLR Customer Class and AMS Meter Flag to the Database Query Function on the MIS | This Nodal Protocol Revision Request (NPRR) will add Provider of Last Resort (POLR) Customer class and the Advanced Metering System (AMS) meter flag to the database query function on the Market Information System (MIS). | 04/03/2009 | Jennifer Frederick on behalf of the Texas Standard Electronic Transaction (Texas SET) Working Group | No | 15.2 | Approved | ||
| NPRR172 | Synchronization of Section 15 with PRR782, Clean-up and Corrections to Terminology and Transaction Timings in Protocol Section 15, Customer Registration | This Nodal Protocol Revision Request (NPRR) incorporates relevant language from Protocol Revision Request (PRR) 782, Clean-up and Corrections to Terminology and Transaction Timings in Protocol Section 15, Customer Registration, approved by the ERCOT Board on February 17, 2009. | 04/03/2009 | Jennifer Frederick on behalf of Texas SET Working Group | No | 15, 15.1.1.2, 15.1.1.3.1, 15.1.1.9, 15.1.3, 15.1.4.2, 15.1.4.4, 15.1.4.5, 15.1.5.2, 15.1.5.3, 15.1.6.4, 15.1.6.5, 15.1.7, 15.1.8, 15.4.1.4, 15.4.1.5 | Approved | PRS | PRS for initial language consideration. |
| NPRR173 | Reduce the Minimum Quantity for Ancillary Service Offers | This Nodal Protocol Revision Request (NPRR) reduces the minimum requirement for Ancillary Service Offers. | 04/08/2009 | Mary Anne Brelinsky, on behalf of the Wholesale Market Subcommittee (WMS) and the Demand Side Working Group (DSWG) | No | 4.4.7.2.1 | Approved | PRS | PRS for initial language consideration. |
| NPRR174 | FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals | This Nodal Protocol Revision Request (NPRR) modifies the verifiable Startup Cost and verifiable minimum energy cost calculation to include a $.50 adder for the Fuel Index Price (FIP). This NPRR also allows through the dispute process for the recovery of the difference between the Reliability Unit Commitment (RUC) Guarantee based on the actual price paid for delivered natural gas and a fuel price of FIP*1.X. In lieu of system changes, ERCOT may implement this NPRR by making appropriate adjustments to the verifiable cost procedures to accommodate the $.50 adder. These procedures will be described in the Verifiable Cost Manual. |
04/14/2009 | WMS | No | 5.6.1.1, 5.6.1.2, 9.14.7 | Approved | WMS | WMS review of NPRR174 |
| NPRR175 | Hub Bus List Clarification | This Nodal Protocol Revision Request (NPRR) updates the Hub lists to reflect the current network model by removing Hub Bus SHRTP which was a construct of planning and does not exist; and also by renaming Hub Bus FPPYD, which was actually two substations that were amalgamated for planning reasons, to FPPYD1 and FPPYD2. SDSES no longer has a 345 kV infrastructure. ALNSW1/2, CNTRY1/3, FRNYPP1/2, JEWETN/S MDANP1/2, RCHBR1/2, TRSES1/2, VENSWN/S denote planning constructs which should be generalized to the substation’s 345kV system. | 04/30/2009 | ERCOT | No | 3.5.2.1, 3.5.2.2 | Approved | PRS | PRS for Impact Analysis review. |
| NPRR176 | Resource Status Input to RUC and Ancillary Service Awards from RUC | This Nodal Protocol Revision Request (NPRR) provides clarity in the Nodal Protocol language. Resources committed by Day-Ahead Market (DAM) are not considered as On-Line by Reliability Unit Commitment (RUC) unless a Qualified Scheduling Entity (QSE) has changed the Resource Status to On-Line in the Current Operating Plan (COP) for that hour. During Ancillary Service insufficiency, an ERCOT Operator may commit Resources in RUC to provide Ancillary Service. If the commitment is for Ancillary Service then the QSE should be able to show the Resource in COP with “ONRUC” status and non-zero Ancillary Service Resource Responsibility corresponding to the Ancillary Service awards from RUC. |
05/07/2009 | ERCOT | No | 5.5.2, 4.4.7.4, 5.5.2 | Approved | PRS | PRS Review |
| NPRR177 | Synchronization of Nodal Protocols with PRR808, Clean-up and Alignment of RECs Trading Program Language with PUCT Rules | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 808, Clean-up and Alignment of RECs Trading Program Language with PUCT Rules. | 05/15/2009 | ERCOT | No | 2.1, 2.2, 14.1, 14.2, 14.3.2, 14.5.2, 14.5.3 (new), 14.6, 14.8,14.9, 14.9.3, 14.9.3.1, 14.9.4, 14.9.5, 14.10.1, 14.12, 14.13 | Approved | BOARD | Board of Directors for consideration. |
| NPRR178 | Regulation Reduction (GS-FR3) and Reg-Up/Reg-Down Allocation to QSEs | The purpose of this Nodal Protocol Revision Request (NPRR) is to bring the Nodal Protocols in line with the nodal program implementation: * Changes to the regulation reduction calculation to account for movements in generation due to units getting updated Base Points from Load Frequency Control (LFC). * The other change is regarding the Regulation Up (Reg-Up)/Regulation Down (Reg-Down) allocation to Qualified Scheduling Entities (QSEs) to take out the constraint for each four-second interval, since the full amount of Reg-Up/Reg-Down responsibility is realizable in five-minutes and compliance is also on a five-minute basis. |
05/26/2009 | ERCOT | No | 6.5.7.6.1 | Approved | BOARD | ERCOT Board consideration |
| NPRR180 | Reconciliation of CRR Related Protocol Language | This Nodal Protocol Revision Request (NPRR) makes the following Nodal Protocol changes: o Removes the Section 3.10.3 requirement to hold Congestion Revenue Right (CRR) models static for two months prior to the auction, thus enabling CRR group to perform updates to CRR model until publication of said model. o Revises Section 7.1(2)(d) to state that the facilitation of bilateral trades will occur on the Market Information System (MIS) Certified Area, not the Secured Area. o Removes the wording in Section 7.1(2)(d) to clarify that bilateral trades of Point- to-Point (PTP) Options with Refund and PTP Obligations with Refund will not occur in Day-Ahead Market (DAM). Amends Section 7.3(1)(c) to clarify that all available Flowgate Right (FGR) capacity (that is consistent with the simultaneous feasibility test described in Section 7.5.5.4, Simultaneous Feasibility Study) is available in CRR Auctions, not just that offered by CRR Account Holders. |
06/10/2009 | Steve Reedy | No | 3.10.3, CRR Network Model 7.1, Function of Congestion Revenue Rights 7.3, Types of Congestion Revenue Rights to Be Auctioned | Approved | ||
| NPRR181 | FIP Definition Revision | This Nodal Protocol Revision Request (NPRR) revises the definition of Fuel Index Price (FIP) to correctly account for the timing difference between ERCOT’s application of the FIP in its systems (midnight to midnight) and the timing of natural gas prices reflected by the index (i.e., 10 AM to 9 AM). The fuel price index published in Gas Daily, in the Daily Price Survey, under the heading “East-Houston-Katy, Houston Ship Channel” for any particular day reflects natural gas prices available to users from hour ending 10 AM of the particular day to hour ending 9 AM of the next day (i.e., the normal “gas day”). This NPRR also adds a new definition for the term “Gas Day.” This NPRR also proposes non-substantive administrative changes, such as correcting acronym and defined term usage and section references. These are shown below with the author “ERCOT Market Rules.” |
06/10/2009 | Luminant Energy Company LLC | No | 2.1 | Approved | BOARD | ERCOT Board consideration of NPRR181 |
| NPRR182 | Non-Protocol Postings on the Market Information System | This Nodal Protocol Revision Request (NPRR) allows ERCOT to put information, not specifically required in the Protocols but required by market guides, on the Market Information System (MIS) under one of the three classifications, i.e., Public, Secure or Certified. This NPRR also adds the State Estimator Standards to the list of Other Binding Documents named in the Protocols. |
06/11/2009 | ERCOT | No | 1.1, 12.2 | Approved | BOARD | Board of Directors for consideration. |
| NPRR183 | Synchronization of PRR790, Load Profile ID Annual Validation Change Request | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 790, Load Profile ID Annual Validation Change Request, which allows for changes in the Annual Validation process timeline due to extreme events. | 06/22/2009 | Ernie Podraza on behalf of the Profiling Working Group (PWG) | No | 18.4.2, Load Profile Id Assignment | Approved | ||
| NPRR184 | Section 2, Addition of Definitions and Acronyms from Zonal Protocols and Clarifications | This Nodal Protocol Revision Request (NPRR) incorporates certain definitions and acronyms from the zonal Protocols for terms that are used in the Nodal Protocols but are not defined in Section 2, Definitions and Acronyms. Some of these definitions have been slightly modified for use in the Nodal Protocols. This NPRR also makes clarifying revisions to Section 2 that can be categorized as follows: (1) Reorders certain definitions and acronyms so that Section 2 is in proper alphabetical order; (2) Within defined terms, spells out full terms rather than using associated acronyms. This assures defined terms that incorporate a shorter defined term will appear consecutively in Section 2.1. For example, Competitive Retailer (CR) of Record incorporates the defined term “Competitive Retailer,” but currently the definitions for “Competitive Retailer” and “CR of Record” appear on different pages. Accordingly, “CR of Record“ will be changed to “Competitive Retailer (CR) of Record“; (3) Moves certain definitions to appear as secondary definitions that follow the primary defined term (e.g., definition for “Black Start Resource” moved to follow definition of “Resource”), and changes certain secondary definitions to primary definitions (e.g., “EILS Contract Period” no longer a secondary definition of “Emergency Interruptible Load Service (EILS)”). Only those terms that are types or classes of a primary defined term are listed as secondary definitions (e.g., Forced Outage, which is a type of Outage); (4) Adds acronyms and abbreviations used in the Nodal Protocols to the list in Section 2.2 if not already contained therein; (5) Deletes terms that do not need definitions from Section 2.1 (e.g., proper nouns); (6) Deletes definitions for terms that are not used in the Nodal Protocols; (7) Adds internal hyperlinks for navigating within Section 2; and (8) Makes non-substantive administrative changes, such as correcting acronym usage, capitalization of defined terms, formatting, grammar, and citations. |
06/23/2009 | ERCOT | No | 2 | Approved | TAC | TAC consideration of NPRR184 |
| NPRR185 | Cancellations of RUC-Committed Resources | This Nodal Protocol Revision Request (NPRR) will provide units that are cancelled after being Reliability Unit Commitment (RUC)-committed in the Day-Ahead RUC (DRUC) or Hourly RUC (HRUC) a process to recover costs that they incur between the time of RUC commitment and the cancellation of the RUC. These costs would include actual fuel and Operations and Management (O&M) expenses that were incurred by the cancellation. | 07/06/2009 | Heddie Lookadoo for the Verifiable Cost Working Group (VCWG) on behalf of the Wholesale Market Subcommittee (WMS) | No | 2.1, 5.6.4 (new), 5.7.3 | Approved | PRS | PRS Impact Analysis review |
| NPRR186 | Naming Convention Clarification | This Nodal Protocol Revision Request (NPRR) clarifies the Nodal Protocols regarding the naming convention approved by TAC by removing the requirement for use of a prefix within the name of Transmission Elements. The naming convention does not and should not require inclusion of a prefix to identify Transmission Service Providers (TSPs). | 07/09/2009 | Network Data Support Working Group (NDSWG) | No | 3.10.7.1 | Approved | PRS | PRS Impact Analysis Review |
| NPRR187 | Definition for Transmission and/or Distribution Service Provider | This Nodal Protocol Revision Request (NPRR) modifies the definition for Transmission and/ or Distribution Service Provider (TDSP) to include Entities that were selected to own and operate Transmission Facilities listed in the PUCT Order in Docket 35665, Commission Staff’s Petition for the Selection of Entities Responsible for Transmission Improvements Necessary to Deliver Renewable Energy from Competitive Renewable Energy Zones.
|
07/10/2009 | Chad Seely | No | 2.1, Definitions | Approved | PRS | PRS consideration |
| NPRR188 | MVA for SCED Input | This Nodal Protocol Revision Request (NPRR) removes the Transmission Service Provider (TSP) requirement to provide MVA to be used in Real-Time sequence and Security-Constrained Economic Dispatch (SCED). This NPRR also corrects the use of Common Information Model (CIM) and corrects the Dynamic Rating requirement. | 07/10/2009 | Ebby John on behalf of the Network Data Support Working Group (NDSWG) | No | 6.5.7.1.13 | Approved | PRS | PRS Impact Analysis Review |
| NPRR189 | Ancillary Service Deployment Clarification | This Nodal Protocol Revision Request (NPRR) clarifies the difference between Ancillary Service capacity deployment and energy deployment and how it affects Security-Constrained Economic Dispatch (SCED). This NPRR also proposes non-substantive administrative changes, such as correcting acronym and defined term usage and section references. |
07/24/2009 | ERCOT | No | 6.4.8.1, 6.4.8.2, 6.5.5.2, 6.5.7.2, 6.5.7.6.2.1, 6.5.7.6.2.2, 6.5.7.6.2.3 | Approved | TAC | TAC consideration of NPRR189 |
| NPRR191 | Synchronization of PRR819, Changes to Support Revisions to the PUCT POLR and Expedited Switch Rules | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 819, Changes to Support Revisions to the PUCT POLR and Expedited Switch Rules, which provides that ERCOT shall identify, for 60 days, Electric Service Identifiers (ESI IDs) acquired in a Mass Transition to a Provider of Last Resort (POLR) so that Customers that switch from the POLR are not charged for an out-of-cycle meter read and it will also implement changes necessary to expedite the customer switching process. | 07/30/2009 | Jennifer Frederick on behalf of the Texas Standard Electronic Transaction (Texas SET) Working Group | No | 2.1, 15, 15.1.1, 15.1.1.1, 15.1.1.2, 15.1.1.3, 15.1.1.3.1, 15.1.1.3.2, 15.1.1.4, 15.1.1.5, 15.1.1.6, 15.1.1.7, 15.1.1.8, 15.1.1.9, 15.1.3, 15.1.6.3, 15.1.6.6, 15.1.8 | Approved | PRS | PRS for language consideration. |
| NPRR192 | QSE Energy and Ancillary Service Compliance Criteria | This Nodal Protocol Revision Request (NPRR) establishes performance criteria for following energy deployments and/or providing Ancillary Services which must be met by Generation and Load Resources. For performance in providing Ancillary Services, the NPRR includes criteria for both Ancillary Service Capacity Monitoring and for periods during which ERCOT has deployed Ancillary Services. The calculation of energy deployment performance is also updated. | 08/11/2009 | PUCT/TRE/ERCOT | No | 2.1, 6.5.7.6.2.3, 8.1.1.2.1.1, 8.1.1.3, 8.1.1.4, 8.1.1.4.1, 8.1.1.4.3 | Approved | BOARD | ERCOT Board Consideration |
| NPRR193 | Application of Nodal Implementation Surcharge in Verifiable Costs | This Nodal Protocol Revision Request (NPRR) allows Resources to include in their verifiable costs the Nodal Implementation Surcharge for periods while ramping up from breaker close to Low Sustained Limit (LSL). | 08/17/2009 | Ino Gonzalez for the Verifiable Cost Working Group (VCWG) on behalf of the Wholesale Market Subcommittee (WMS) | No | 5.6.1.1 | Approved | TAC | TAC consideration of NPRR193 |
| NPRR194 | Synchronization of Zonal Unannounced Generation Capacity Testing Process | This Nodal Protocol Revision Request (NPRR) replaces the seasonal testing requirement with unannounced Generation Resource testing and adds a requirement for Qualified Scheduling Entities (QSEs) to seasonally update their Resources’ High Sustainable Limits (HSLs). The NPRR also leverages existing emergency operations Settlement functionality to provide a mechanism to compensate a Generation Resource for the additional energy above the pre-test Security-Constrained Economic Dispatch (SCED) Base Point during the unannounced Generation Resource test period. This NPRR synchronizes the Nodal Protocols with the process added to the zonal Protocols pursuant to Protocol Revision Request (PRR) 750, Unannounced Generation Capacity Testing. |
08/18/2009 | ERCOT | No | 6.6.9, 6.6.9.1, 6.6.9.2, 8.1.1.2 | Approved | PRS | PRS Impact Analysis review |
| NPRR195 | Removal of McCamey Congestion Management from Nodal Protocols | This Nodal Protocol Revision Request (NPRR) removes the unique congestion management procedures for the McCamey Area from the Nodal Protocols, consistent with zonal Protocol revisions made pursuant to Protocol Revision Request (PRR) 810, Remove McCamey Congestion Management, which was approved by the ERCOT Board on August 18, 2009. This NPRR removes all mention of McCamey Flowgate Rights (MCFRIs) while leaving intact the description of Flowgate Rights (FGRs) and related Settlement equations. | 08/18/2009 | ERCOT | No | 2.2, 7.1, 7.3.1.2, 7.5.1, 7.5.3.1, 7.5.3.2, 7.7 (delete), 7.8, 7.9.1.4, 7.9.2.4 | Approved | TAC | TAC consideration of NPRR195 |
| NPRR196 | Synchronization of Nodal Protocols with PRR827, Find Transaction and Find ESI ID Functions on the MIS | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 827, Find Transaction and Find ESI ID functions on the MIS. | 08/20/2009 | ERCOT | No | 15.2, 15.2.1 (new), 15.2.2 (new), 15.2.3 (new) | Approved | TAC | TAC for consideration. |
| NPRR197 | Section 21, Synchronization of Zonal Protocols | This Nodal Protocol Revision Request (NPRR) synchronizes zonal Protocol Section 21 with the current Nodal Protocols and includes changes from PRR821, Update of Section 21, Process for Protocol Revision. | 10/30/2009 | ERCOT | No | 21 | Approved | BOARD | ERCOT Board for consideration. |
| NPRR198 | Load Used in RMR Studies | This Nodal Protocol Revision Request (NPRR) would provide guidance to ERCOT to use the peak Load forecast posted pursuant to P.U.C. Subst. R. 25.505, Resource Adequacy in the Electric Reliability Council of Texas Power Region, for the next 12 months for the Reliability Must-Run (RMR) study, except with respect to the Load in the RMR local area. This aligns the Load forecast period with the RMR contract period and ensures that the Load forecast used for the analysis is one with a reasonable probability of occurrence. This NPRR also proposes non-substantive administrative changes, shown with the author “ERCOT Market Rules.” |
11/10/2009 | PSEG TX | No | 3.14.1.2 | Approved | PRS | PRS language consideration |
| NPRR199 | Shift Factors by Resource Node | This Nodal Protocol Revision Requests (NPRR) adds the reporting requirement for ERCOT to provide Shift Factors by Resource Node. | 11/20/2009 | ERCOT | No | 4.2.3 | Approved | ||
| NPRR200 | MMS DC Tie Schedule Data Source | This Nodal Protocol Revision Request (NPRR) changes the source of Direct Current Tie (DC Tie) Schedules for use by the Market Management System (MMS) to an associated Qualified Scheduling Entity (QSE) submitted Electronic Tag (e-Tag). This NPRR also revises the definition of DC Tie Schedule and adds a new acronym to Section 2. | 11/30/2009 | ERCOT | No | 2.1, 2.2, 4.4.4, 4.4.4.1, 4.4.4.2, 4.4.4.3, 9.17.2 | Approved | PRS | PRS IA Review |
| NPRR201 | Calculation of Transmission and Distribution Losses | This Nodal Protocol Revision Request (NPRR) revises the Nodal Protocol language to align with the current practice for calculation of Transmission Losses and Distribution Losses on a seasonal versus monthly basis. | 12/03/2009 | ERCOT | No | 13.2.1, 13.2.2, 13.2.3, 13.2.4, 13.4.1 | Approved | PRS | PRS IA Review |
| NPRR202 | Clarification of Network Operations Model and State Estimator Postings | This Nodal Protocol Revision Request (NPRR) addresses the confidentiality of data in the Network Operations Model and Hourly State Estimator report. The language introduces a newly defined term for redacted-version of the Network Operations Model for non-Transmission Service Providers (TSPs) and also removes Private Use Network data from the Hourly State Estimator report. | 12/10/2009 | NATF | No | 2.1, 3.10, 3.10.1, 3.10.4, 4.2.3, 6.5.7.1.13 | Approved | BOARD | ERCOT Board Consideration |
| NPRR203 | Amend Telemetry Bus Accuracy Requirements | This Nodal Protocol Revision Request (NPRR) proposes a new term, State Estimator Bus, and proposes language changes to Section 3.10.7.5.2. | 12/22/2009 | Ebby John on behalf of the Network Data Support Working Group (NDSWG) | No | 2.1, 3.10.7.5.2 | Approved | TAC | TAC Consideration |
| NPRR204 | Update Generic Startup Cost for Reciprocating Engines | This Nodal Protocol Revision Request (NPRR) adds an Operations and Maintenance (O&M) cost for the “Reciprocating Engines” Resource category to the Resource Category Startup Offer Generic Cap determination. | 12/22/2009 | South Texas Electric Cooperative, Inc. | No | 4.4.9.2.3 | Approved | ||
| NPRR205 | Transmission and/or Distribution Service Provider (TDSP) Definition Revision | This Nodal Protocol Revision Request (NPRR) revises the definition of Transmission and/or Service Provider (TDSP) to include Entities that have been selected to own and operate Transmission Facilities and have a code of conduct approved by the Public Utility Commission of Texas (PUCT). | 01/15/2010 | Mike Grable on behalf of ERCOT | No | 2.1, Definitions | Approved | ||
| NPRR206 | Nodal Market Day-Ahead Market Credit Requirements | This Nodal Protocol Revision Request (NPRR) revises the nodal collateral requirements by Qualified Scheduling Entities (QSEs) who participate in the Day-Ahead Market (DAM). The change will potentially reduce the collateral burden for QSE’s bids while sufficiently collateralizing ERCOT. The revisions are based on discussions held at the Market Credit Working Group (MCWG). The proposed NPRR language has been developed for implementation by the Texas Nodal Market Implementation Date (December 2010). Additional changes to further improve nodal collateralization may be proposed in the future, some of which may require nodal system changes. Revisions requiring significant nodal system changes following this NPRR are not expected to be implemented by the December 2010 Texas Nodal Market Implementation Date. | 01/20/2010 | Randa Stephenson on behalf of Luminant | No | 4.4.10 | Approved | PRS | PRS for consideration. |
| NPRR207 | Unit Deselection (formerly “Hour Start Unit Deselection and Half Hour Start Unit RUC Clawback”) | This Nodal Protocol Revision Request (NPRR) would provide that ERCOT may deselect units from Reliability Unit Commitment (RUC) processes. The NPRR also creates the term “RUC Notification” to refer to an ERCOT instruction preceding a Resource’s startup time. The NPRR enables the Qualified Scheduling Entity (QSE) to self-commit, a Resource after receiving a RUC Notification but before the Resource’s startup time. |
01/22/2010 | Seth Cochran and Tom Jackson, co-chairs, for the Quick Start Task Force (QSTF) on behalf of the Wholesale Market Subcommittee (WMS) | No | 2.1, 5.5.2, 5.7.2 | Approved | ||
| NPRR208 | Registration and Settlement of Distributed Generation (DG) Less Than One MW | The Nodal Protocol Revision Request (NPRR) includes proposed language changes by the NOIE DRG Taskforce in regards to the registration requirements for Distributed Generation (DG) greater than 50 kW and less than or equal to one MW. In addition this NPRR synchronizes language approved through PRR756, Distributed Renewable Generation Modifications, with some recommended revisions consistent with the NOIE DRG Task force discussions. PRR756 was approved by ERCOT Board on 5/20/08 and was un-grey boxed upon system implementation on 11/21/09. | 01/25/2010 | Don Tucker on behalf of the NOIE DRG Taskforce | No | 2.1, Definitions 2.2, Acronyms 10.2.2, TSP and DSP Metered Entities 11.4.4.2, Load Reduction for Excess PhotoVoltaic Distributed Renewable Generation 11.4.4.3, Load Reduction for Excess Non-PhotoVoltaic Distributed Generation 16.5, Registration of Generation Resources, Loads Acting as a Resource and Emergency Interruptible Load Service Resources 18.2, Methodology 18.2.2, Load Profiles for Non-Interval Metered Loads 18.2.3, Load Profiles for Non-Metered Loads | Approved | COPS | COPS consideration |
| NPRR209 | Data Posting Changes to Comply with P.U.C. Subst. R. 25.505 | This Nodal Protocol Revision Request (NPRR) removes a requirement to post certain State Estimator information that can be used to determine Resource status, which is confidential information as per Public Utility Commission of Texas (PUCT) rules. | 02/05/2010 | Adrian Pieniazek, NRG Texas and Randy Jones, Calpine | No | 1.3.1.1, 6.5.7.1.13 | Approved | ||
| NPRR210 | Wind Forecasting Change to P50, Synchronization with PRR841 | This Nodal Protocol Revision Request (NPRR) changes the wind forecasting methodology to use a 50% probability of exceedance calculation instead of an 80% for Reliability Unit Commitment (RUC) considerations. This NPRR would align the Nodal Protocols with changes made to the zonal Protocols pursuant to Protocol Revision Request (PRR) 841, Revise Total ERCOT Wind Power Forecast (TEWPF), which was approved by the ERCOT Board on 3/23/10. | 02/09/2010 | Morgan Stanley | No | 2.1, 3.9.1, 4.2.2, 5.7.4 | Approved | BOARD | ERCOT Board consideration of NPRR210 |
| NPRR211 | Clarify Capacity Obligations of Energy Trades (formerly “Modify RUC Capacity Short Charge to Use Final Energy Trades”) | This Nodal Protocol Revision Request (NPRR) specifies that Energy Trades representing firm physical products that are entered and confirmed through ERCOT must be submitted by 1430 in the Day-Ahead for the Operating Day, and that Energy Trades representing firm physical products that are executed during the adjustment period and confirmed through ERCOT must be submitted prior to the next Hourly Reliability Unit Commitment (HRUC) execution. Additional non-substantive administrative revisions, such as correcting acronym usage and formatting, are shown with the author “ERCOT Market Rules.” |
02/11/2010 | J. Aron & Company | No | 2.1, 4.4.2, 5.4, 5.7.4.1.1 | Approved | TAC | TAC consideration of NPRR211 |
| NPRR212 | Disputing Fuel Oil Price (FOP) Costs | This Nodal Protocol Revision Request (NPRR) allows for disputes of FOP. | 02/11/2010 | Kenan Ögelman | No | 9.14.7, Disputes for RUC Make Whole Payment for Exceptional Fuel Costs. | Approved | PRS | PRS consider the Recommendation Report and Impact Analysis |
| NPRR213 | Deadlines for Initiating Alternative Dispute Resolution | This Nodal Protocol Revision Request (NPRR) amends Section 20.3 to establish deadlines for the Alternative Dispute Resolution (ADR) procedures. | 02/25/2010 | Horizon Wind Energy LLC | No | 20.3, Informal Dispute Resolution 20.4, Mediation Procedures 20.5.2, Selection of Arbitrators | Approved | ||
| NPRR214 | Wind-powered Generation Resource (WGR) High Sustained Limit (HSL) Update Process | This Nodal Protocol Revision Request (NPRR) establishes the specific timing of the WGR’s HSL update to ERCOT and specifies that, when not curtailed, the WGR’s HSL should equal the WGR’s current meter reading. | 03/12/2010 | Wind Coalition | No | 6.5.5.2 | Approved | ||
| NPRR217 | Resolution of Alignment Item A58 - Use of Different Computational Modules | This Nodal Protocol Revision Request (NPRR) clarifies the Security Sequence since ERCOT does not use the same computational modules to perform both the Real-Time sequence and Day-Ahead and hour-ahead security analysis. | 03/23/2010 | ERCOT | No | 5.5.1 | Approved | BOARD | ERCOT Board for consideration. |
| NPRR218 | Resolution of Alignment Item A71 - Add Protocol Description of the Power Balance Penalty Factor used in the SCED | This Nodal Protocol Revision Request (NPRR) will add a description of the power balance penalty factor to the Nodal Protocol sections that describe the implemented constraint set utilized in the Security-Constrained Economic Dispatch (SCED) optimization. | 03/23/2010 | ERCOT | No | 6.5.7.1.11, 6.5.7.3 | Approved | ||
| NPRR219 | Resolution of Alignment Items A33, A92, A106, and A150 - TSPs Must Submit Outages for Resource Owned Equipment and Clarification of Changes in Status of Transmission Element Postings | This Nodal Protocol Revision Request (NPRR) will require the Resource Entity to designate a Transmission Service Provider (TSP) as the responsible Entity that will manage Outage Scheduler entries for the Resource Entity for Transmission Elements owned by the Resource other than the outage of the Generation or Load Resource itself. This NPRR will also require all changes or expected changes in the status of Transmission Facilities to be in the Outage Scheduler to ensure that all Outages in the Outage Scheduler are provided to the Market Information System (MIS). | 03/24/2010 | ERCOT | No | 2.1, 3.1.5.1, 3.3.2.1, 6.3.2 | Approved | Parking Deck - Impact Analysis and Cost Benefit Analysis Review | |
| NPRR220 | Nodal Requirement of Declaring an EEA for Reserves More than 500 MW | This Nodal Protocol Request (NPRR) removes the requirement to declare an Energy Emergency Alert (EEA) prior to deploying more than 500 MW of Responsive Reserve (RRS). | 03/24/2010 | ERCOT | No | 6.5.7.6.2.2 | Approved | ||
| NPRR221 | Day-Ahead Market and Real-Time Market Default Allocation Changes | This Nodal Protocol Revision Request (NPRR) changes the way default amounts (amounts owed to ERCOT by defaulting Counter-Party 180 days after the default occurs) in the Day-Ahead Market (DAM) and Real-Time Market (RTM) are allocated. This NPRR assigns a share of the default to each Counter-Party based on the greatest of the Counter-Party’s MWh activity in either the CRR market or DAM or RTM at the Counter-Party level for the calendar month prior to the month in which the default occurs. The Counter-Party share of the default is invoiced to the Counter-Party’s Qualified Scheduling Entities (QSEs) or Congestion Revenue Right (CRR) Account Holders, pro rata based on each of the Counter-Party QSE’s or Counter-Party CRR Account Holder’s share of the Counter-Party’s maximum MWh activity. The level of MWh activity in the CRR market and DAM is measured as the greater of the MWh purchases or sales in that market and the level of MWh activity in the RTM is measured as the greater of the Counter-Party’s MWh Load or generation, excluding generation from Reliability Must-Run (RMR) Resources and other Resources during Reliability Unit Commitment (RUC)-Committed Intervals. Language that currently exists in Sections 9.4.3 and 9.7.3 was consolidated and used to create new Section 9.19. This NPRR also accelerates the DAM Invoice payment due date by one day. This NPRR also includes revisions to synchronize the Nodal Protocols with the zonal Protocols as revised by Protocol Revision Request (PRR) 817, Cease Late Payment Charges for Defaulted Entities, to clarify how much security may be held back to be used to pay subsequent minor Invoices as they come due. |
03/30/2010 | MCWG | No | 9.1.2, 9.4.1, 9.4.2, 9.4.3, 9.4.5, 9.7.2, 9.7.3, 9.7.3.1, 9.7.3.2, 9.7.3.2.1, 9.7.3.2.2, 9.7.5, 9.19, 9.19.1, 9.19.2, 9.19.2.1, 9.19.2.2 | Approved | ||
| NPRR222 | Half-Hour Start Unit RUC Clawback (Companion to NPRR207) | This Nodal Protocol Revision Request (NPRR) removes Reliability Unit Commitment (RUC) Clawback on all Half-Hour Start Units (a) that participate in the Day-Ahead Market (DAM) and (b) during Energy Emergency Alert (EEA) events. This NPRR also changes the RUC Clawback on all Half-Hour Start Units that did not participate in the DAM to 50%. | 04/09/2010 | WMS | No | 2.1, 5.7.2 | Approved | ||
| NPRR223 | Resolution of Alignment Item A73 Removal of IMM and PUC Staff Nightly Report | This Nodal Protocol Revision Request (NPRR) removes a reporting requirement. There are no specific reporting requirements from the Independent Market Monitor (IMM) and Public Utility Commission of Texas (PUCT) for ERCOT to provide a nightly report. Based on IMM requirements, a nightly report is not required. |
04/09/2010 | ERCOT | No | 17.5 | Approved | ||
| NPRR224 | Remove Dynamic Rating Requirements for Annual Planning Models | This Nodal Protocol Revision Request (NPRR) removes the use of Dynamic Rating for Annual Planning Models. |
04/09/2010 | Steady State Working Group | No | 3.10.8, 3.10.8.4 | Approved | TAC | TAC Consideration |
| NPRR225 | Standard Cost Option in Verifiable Costs | This Nodal Protocol Revision Request (NPRR) provides the option for the election of standard Operations and Maintenance (O&M) costs as a component of Startup Costs and minimum energy costs in place of filing verifiable costs through January 1, 2012. Additional non-substantive administrative revisions, such as correcting acronym and defined term usage, are shown with the author “ERCOT Market Rules.” |
04/12/2010 | WMS | No | 5.6.1, 5.6.1.1, 5.6.1.2 | Approved | PRS | PRS Impact Analysis review |
| NPRR226 | Procedure for Setting DAM Credit Requirement Parameters (formerly Procedure for Setting DAM Auction Credit Requirement Parameters) | This Nodal Protocol Revision Request (NPRR) provides language revisions to align the Nodal Protocols with the procedure developed to implement the changes approved by the ERCOT Board in NPRR 206, Nodal Market Day-Ahead Market Credit Requirements, on 2/16/10. | 04/16/2010 | ERCOT | No | 4.4.10 | Approved | PRS | PRS for initial language consideration. |
| NPRR227 | Termination of Access Privileges to Restricted Computer Systems and Control Systems | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with the language in the zonal Protocols pursuant to Protocol Revision Request (PRR) 822, Termination of Access Privileges to Restricted Computer Systems, Control Systems and Facilities formerly Removing of Access to Restricted Computer Systems, Control Systems, and Facilities. PRR822 was approved by the ERCOT Board on 10/21/09. This NPRR also includes a definition used in the zonal Protocols but not defined in the Nodal Protocol Section 2, Definitions and Acronyms |
04/23/2010 | Ann Delenela | No | 2.1, Definitions 16.14, Termination of Access Privileges to Restricted Computer Systems, Control Systems and Facilities (new) | Approved | TAC | TAC consideration |
| NPRR228 | Resolution of Alignment Items A2, A80, A83 and A93 - As-Built Treatment and Settlement of Combined Cycle Generation Resources in ERCOT Market Systems | This Nodal Protocol Revision Request (NPRR) revises the Nodal Protocol language to include a description of the treatment and Settlement of Combined Cycle Generation Resources in the ERCOT Day-Ahead, reliability and Real-Time systems. The design change for the Combined Cycle upgrades are described in the documents located at the following URLs: “Combined Cycle Plants”, http://nodal.ercot.com/docs/pd/ida/sig/SIG0003/sig0003_combined_cycle_plants_v5_0.doc; “Transmission Constraint Modeling for RT CCP Dispatch”, http://nodal.ercot.com/docs/pd/ida/sig/SIG0022/sig0022_trans_constraint_mod_RT_ccp_disp_v4.doc; “Combined-Cycle Unit Modeling in the Nodal Design”, The Combined Cycle Train design change described in the above documentation has extensive impacts on ERCOT systems and processes in the areas of Registration, Management Activities (COP and Outage Scheduler), the Day-Ahead Market (DAM), the Supplemental Ancillary Services Market (SASM) and the Reliability Unit Commitment (RUC) processes; and Settlements and Billing. This NPRR adds clarifying language to explain the “as built” system implementation of the conceptual elements of the Combined Cycle Train design change consistent with the existing Protocol treatment of all other Generation Resource types. |
04/23/2010 | ERCOT | No | 2.1, 2.2, 3.8, 3.8.1 (new), 3.8.2 (new), 3.9.1, 3.9.2, 4.5.1, 4.6.1.4 (new), 4.6.2.3.1, 4.6.4.1.1, 4.6.4.1.2, 4.6.4.1.3, 4.6.4.1.4, 5.7.1, 5.7.1.1, 5.7.1.2, 5.7.1.3, 5.7.1.4, 5.7.2, 5.7.3, 5.7.4, 5.7.4.1, 5.7.4.1.1, 5.7.5, 5.7.6, 6.5.5.2, 6.6.1.1, 6.6.3.1, 6.6.5, 6.6.5.1, 6.6.5.1.1, 6.6.5.1.2, 6.6.5.2, 6.6.5.3, 6.6.5.4, 6.6.6.1, 6.6.6.2, 6.6.6.3, 6.6.6.4, 6.6.7.1, 6.6.8.1, 6.6.9.1, 6.7.1, 7.9.3.1 | Approved | ||
| NPRR229 | Additions to Section 2, Definitions and Acronyms | This Nodal Protocol Revision Request (NPRR) incorporates certain definitions and acronyms from the zonal Protocols for terms that are used in the Nodal Protocols but are not defined in Section 2, Definitions and Acronyms. | 04/29/2010 | Sonja B. Mingo | No | Section 2.1, Definitions Section 2.2, Acronyms and Abbreviations | Approved | BOARD | ERCOT Board consideration |
| NPRR230 | Resolution of Alignment Items A40, A108, A127 and A138 and Clarification/Updates to Load and Demand Forecast, Statement of Opportunities, and Long Term Wind Power Forecast | This Nodal Protocol Revision Request (NPRR) resolves Alignment Items A40, A108, A127, and A138 and provides clarification of the three-year Load and Demand forecast requirements as well as consistency for the medium-term System Adequacy Report. The requirement to develop profile functionality for a Long-Term Wind Power Forecast has been removed. | 05/07/2010 | ERCOT | No | 2.2, 3.2.1, 3.2.2, 3.2.4, 3.12, 3.12.2, 3.13 | Approved | ||
| NPRR231 | Treatment of RMR Units in the Day-Ahead Market (formerly “Remove RMR Units from the Day-Ahead Market”) | This Nodal Protocol Revision Request (NPRR) removes ERCOT’s ability to submit Three-Part Supply Offer curves for any Generation Resource providing Reliability Must-Run (RMR) Service from participation in the Day-Ahead Market (DAM) and the Day-Ahead Reliability Unit Commitment (DRUC) process. However, ERCOT will still have the ability to use an RMR Resource to resolve local congestion issues through Verbal Dispatch Instruction (VDI). This NPRR also proposes non-substantive administrative changes, such as correcting acronym and defined term usage. These are shown below with the author “ERCOT Market Rules.” |
05/07/2010 | Luminant | No | 4.1, 4.2.1.1, 4.4.8, 4.6.2.1, 4.6.2.3.2 | Approved | ||
| NPRR232 | Clarification of Block Load Transfer Registration and Deployment | This Nodal Protocol Revision Request (NPRR) adds language to clarify the purpose of registering Block Load Transfers (BLTs) and to specify the instances of Load transfer between Control Areas for which registration is required or when optional. The proposed revision clarifies the role of Market Participants regarding registering a BLT and related roles. | 05/10/2010 | ERCOT | No | 2.1, 6.5.9.5, 6.5.9.5.1, 6.5.9.5.2 | Approved | ||
| NPRR233 | Clarifying Method of Enforcing CRR Auction Limitation on Market Submissions | This Nodal Protocol Revision Request (NPRR) clarifies the procedures and system configurations that will be utilized to ensure market transactions for Congestion Revenue Right (CRR) Auctions do not exceed the system capabilities. | 05/13/2010 | ERCOT | No | 7.5.2 | Approved | ||
| NPRR235 | Resolution of Alignment Items A36 and A131 and Clarification of Miscellaneous Requirements | This Nodal Protocol Revision Request (NPRR) resolves Alignment Items A36 and A131 by clarifying Market Information System (MIS) posting requirements and validation of Qualified Scheduling Entity (QSE) telemetry for Ancillary Services Resource Responsibility and clarifies Reliability Unit Commitment (RUC) initialization to data bases. This NPRR also proposes non-substantive administrative changes, such as correcting acronym and defined term usage. These are shown with the author “ERCOT Market Rules.” |
05/13/2010 | ERCOT | No | 3.13, 3.18, 5.5.1 | Approved | TAC | TAC consideration of NPRR235 |
| NPRR236 | Resolution of Alignment Item A83 partially, A86, A87 partially, A88 partially, and A142 - Clarify Default Actions for Missing Data and Range of Valid Data Entries for Energy Offers | This Nodal Protocol Revision Request (NPRR) clarifies system actions if the Qualified Scheduling Entity (QSE) cancels a Resource Parameter submission, if a Current Operating Plan (COP) is not submitted for any hour, and/or if a conflict in Resource Status is encountered. The NPRR also clarifies that in each hour only one Combined Cycle Generation Resource in a Combined Cycle Train may be assigned one of the On-Line Resource Status codes. | 05/13/2010 | ERCOT | No | 2.2, 3.7.1.1, 3.7.1.3, 3.8, 3.9.1, 4.4.9.3, 6.4.3, 6.4.4 | Approved | ||
| NPRR237 | Resolution of Alignment Items A22, A143, A148, A153, A160 and A169 – Clarification of NERC Reliability Standards and MIS Posting Requirements | This Nodal Protocol Revision Request (NPRR) resolves Alignment Items A22, A143, A148, A153, A160 and A169 by clarifying the role of North American Electric Reliability Corporation (NERC) Reliability Standards in relation to Protocols and several Market Information System (MIS) posting requirements. | 05/13/2010 | ERCOT | No | 6.4.5, 6.5.2, 6.5.7.1.13, 6.5.7.5, 6.5.7.6.1, 8.2 | Approved | ||
| NPRR238 | Resolution of Alignment Item A47, A59, A104, A105, A114, A115, A130, A188, and A189 - Provides Clarification and Updates to Network Operations Model Processes for Resource Entities | This Nodal Protocol Revision Request (NPRR) resolves Alignment Items A47, A59, A104, A105, A114, A115, A130, A188, and A189 by clarifying Network Model updates processes including clarification of the role the resource registration process in the model updates as well as the data submittal time requirements for Resource Entities. | 05/13/2010 | ERCOT | No | 3.3.2.1, 3.10, 3.10.1, 3.10.4, 3.10.7.1.1, 3.10.7.1.2, 3.10.7.2, 3.10.7.3, 3.10.8.2, 16.5.3 | Approved | ||
| NPRR239 | Ramp Rate Limitation of 10% per minute of On-Line Installed Capability for Wind-powered Generation Resources | This Nodal Protocol Revision Request (NPRR) proposes a requirement that certain Wind-powered Generation Resources (WGRs) limit the unit ramp rate to 10% per minute of their nameplate rating as registered with ERCOT. The proposed language is based on the concept set forth in zonal Protocol Section 6.5.13, WGR Ramp Rate Limitations. | 05/13/2010 | ERCOT | No | 6.5.7.10 | Approved | PRS | PRS Impact Analysis review |
| NPRR240 | Proxy Energy Offer Curve | This Nodal Protocol Revision Request (NPRR) states that the Entity with decision making authority over how a Resource or Split Generation Resource is offered or scheduled shall be responsible for all offers associated with each Resource, including offers represented by a proxy Energy Offer Curve. Additional non-substantive administrative revisions, such as correcting acronym usage, are shown with the author “ERCOT Market Rules.” |
05/26/2010 | Potomac Economics | No | 6.5.7.3 | Approved | ||
| NPRR241 | Aggregate Incremental Liability (AIL) Calculation and Credit Reports Publish Corrections | This Nodal Protocol Revision Request (NPRR):
1. Updates AIL calculation to reflect Max (Average Daily Transaction Extrapolated (ADTE) during the previous 60-day period) instead of ADTE to match Estimated Aggregate Liability (EAL) calculation. 2. Removes Flowgate Rights-related Credit Monitoring and Management Reports. 3. Corrects Credit Monitoring and Management Reports format from Extensible Markup Language (XML) to Microsoft Excel (XLS) format. 4. Updates the posting requirements of Future Credit Exposure (FCE) Details Reports. |
05/27/2010 | Vanessa Spells, Credit Manager | No | 16.11.4.4, Determination of Counter-Party Aggregate Incremental Liability 16.11.4.7, Credit Monitoring and Management Reports | Approved | ||
| NPRR242 | Synchronization of Nodal Protocols with PRR792 | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 792, Revised Renewable Portfolio Standards Allocation Process, Pursuant to P.U.C. Subst. R. 25.173, approved by the ERCOT Board on January 20, 2009. | 06/02/2010 | ERCOT | No | 1.3.1.1, 14.2, 14.5.2, 14.5.3 (new), 14.9.3.1, 14.9.5 | Approved | ||
| NPRR243 | Load Resource Disqualification, Unannounced Testing, and Compliance | This Nodal Protocol Revision Request (NPRR) incorporates relevant language from Protocol Revision Request (PRR) 714, Qualification and Periodic Testing of Loads acting as Resources (LaaRs), and synchronizes the Nodal Protocols with the current zonal requirements for the periodic testing and suspension of a Load Resource for non-performance. | 06/03/2010 | WMS | No | 8.1.1.1, 8.1.1.4.2 | Approved | ||
| NPRR244 | Clarification of Other Binding Documents | This Nodal Protocol Revision Request (NPRR) clarifies the concept of “Other Binding Documents” and the revision process to better align with item (j) of the Public Utility Regulatory Act, TEX. UTIL. CODE ANN. § 39.151 (Vernon 1998 & Supp. 2003) (PURA), Essential Organizations, and P.U.C.T. Subst. R. 25.503, Oversight of Wholesale Market Participants, with respect to governing documents that are public and in effect in the ERCOT Region. | 06/03/2010 | Dave Seibert | No | 1.1 Summary of the ERCOT Protocols Document | Approved | ||
| NPRR245 | Protocol Synchronization and As-Built Clarification for RUC Shortfall Calculation | This Nodal Protocol Revision Request (NPRR) proposes revisions to paragraphs (9) and (10) of Section 5.7.4.1.1 to conform these paragraphs with paragraph (1), and to clarify how to perform Settlements pursuant to paragraph (1). | 06/07/2010 | ERCOT | No | 5.7.4.1.1 | Approved | ||
| NPRR246 | Requirement for Resource Entities to Update Resource Parameters | This Nodal Protocol Revision Request (NPRR) requires Resource Entities to update their Resource Parameters after Net Dependable Capability tests, reactive capability tests, ERCOT requests, and known data changes to any Resource Parameters. | 06/08/2010 | Jay Teixeira | No | 3.7, Resource Parameters | Approved | ||
| NPRR247 | Retail Market Testing Updates Due to the Merger of the TX SET and TTPT Working Groups | This Nodal Protocol Revision Request (NPRR) creates Section 19.8, Retail Market Testing, incorporating the retail market testing process into Section 19, Texas Standard Electronic Transaction, thereby eliminating the need for Section 23, Texas Test Plan Team - Retail Market Testing. |
06/21/2010 | Jennifer Frederick on behalf of TX SET Working Group | No | 16.2.1, 16.3, 16.4, 19.8 (new), 23 (delete) | Approved | ||
| NPRR248 | Removal of Loads from NOIE Load Zone (formerly “Removal of Loads from Pre-1999 NOIE Load Zone”) | This Nodal Protocol Revision Request (NPRR) provides that a member assigned to a Non-Opt-In Entity (NOIE) Load Zone due to being in a group of NOIEs that are parties to the same pre-1999 power supply arrangement and having a 2003 peak Load in excess of 2,300 will be assigned to an appropriate Competitive Load Zone if it terminates its pre-1999 power supply arrangement. | 06/24/2010 | Kerrville Electric Cooperative and San Bernard Electric Cooperative | No | 3.4.2, 3.4.3, 7.4.2 | Approved | ||
| NPRR249 | Resolution of Alignment Item A155 and A159 – Removal of Text Reason Requirement (formerly “Removal of Text Reason Requirement”) | This Nodal Protocol Revision Request (NPRR) removes the requirement for Qualified Scheduling Entities (QSEs) with Resources to submit a text reason to ERCOT when a Resource’s telemetered High Sustained Limit (HSL) or Low Sustained Limit (LSL) deviates from a normal high or low limit. | 07/06/2010 | John Adams | No | 3.2.5, Publication of Resource and Load Information 6.4.5, Resource Status 8.1.1.1, Ancillary Service Qualification and Testing | Approved | ||
| NPRR250 | Suspension of Annual Profile ID Validation With Advanced Meter Deployment | This Nodal Protocol Revision Request (NPRR) removes the market requirement for annual Load Profile ID validation in areas where Advanced Meter System (AMS) deployment is in progress. | 07/07/2010 | Ernie Podraza on behalf of the Profiling Working Group (PWG) | No | 18.4.2, Load Profile ID Assignment | Approved | ||
| NPRR251 | Synchronization of PRR845, Definition for IDR Meters and Optional Removal of IDR Meters at a Premise Where an Advanced Meter Can be Provisioned | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 845, Definition for IDR Meters and Optional Removal of IDR Meters at a Premise Where an Advanced Meter Can be Provisioned, which clarifies the meaning of an Interval Data Recorder (IDR) Meter and provides for optional removal of IDR Meters under certain conditions for Premises where an Advanced Meter can be provisioned by the Transmission and/or Distribution Service Provider (TDSP). This NPRR also inserts grey boxed language for reporting requirements in Sections 18.6.1 and 18.6.2, to be implemented post Texas Nodal Market Implementation Date, that were removed from PRR845 due to the impact on Nodal systems and therefore deemed “Not Needed for Go-Live” by the CEO Revision Request Review process. |
07/08/2010 | Terry Bates on behalf of the Retail Metering Working Group | No | 2.1, 3.14.3, 8.1.3.1, 9.5.6, 9.5.8, 9.5.9, 9.18, 10.2.2, 10.3.2.3, 10.3.3.3, 10.9, 10.9.1, 10.9.2, 10.9.3, 11.4.3.1, 18.6, 18.6.1, 18.6.2, 18.6.3, 18.6.5, 18.6.6 | Approved | ||
| NPRR252 | Synchronization of PRR758, Clarification of Language Related to Generation Netting for ERCOT Polled Settlement Meters | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 758, Clarification of Language Related to Generation Netting for ERCOT Polled Settlement Meters, approved by the ERCOT Board on 4/15/08. The term “Metering Facility” and its definition are being struck from Section 10.1 and added to Section 2, in accordance with Nodal Protocol convention. Non-substantive administrative changes, such as correcting acronym and defined term usage are also included. |
07/15/2010 | ERCOT | No | 2.1, 3.10.7.2, 10.1, 10.3.2.3 | Approved | PUCT | |
| NPRR253 | CRR Balancing Account Invoice and Settlement and Billing Dispute Process | This Nodal Protocol Revision Request (NPRR) updates Section 9.12, and Section 9.14, with information pertaining to the ERCOT Invoice process and the statuses for processing of disputes. This NPRR also proposes non-substantive changes, such as capitalizing defined terms and use of acronyms. | 07/15/2010 | Art Deller | No | 9.12, CRR Balancing Account Invoices 9.14.1, Data Review, Validation, Confirmation, and Dispute of Settlement Statements 9.14.2, Notice of Dispute 9.14.3, Contents of Notice 9.14.4, ERCOT Processing of Disputes 9.14.4.1.3, Closed 9.14.4.1.4, Rejected (new) 9.14.4.1.4, Withdrawn 9.14.4.1.5, ADR 9.14.4.2.1, Denied 9.14.4.3, Closed (deleted) | Approved | ||
| NPRR254 | Updates to Protocol Sections 14 and 18 | This Nodal Protocol Revision (NPRR) aligns language in Section 14 with COPMGRR016, Update to Section 12, Renewable Energy Credits due to PRR 808, Clean-up and Alignment of RECs Trading Program Language with PUCT Rules (approved by TAC on 4/8/10). This NPRR also updates Section 18, Load Profiling, with terms proposed in NPRR229, Additions to Section 2, Definitions and Acronyms. | 07/15/2010 | Sonja B. Mingo | No | 14.2, Duties of ERCOT 14.2.1, Site Visits 14.3.1, Creation of Renewable Energy Credit Accounts 14.3.2, Attributes of Renewable Energy Credits and Compliance Premiums 14.4, Registration to Become a Renewable Energy Credit Generator or Renewable Energy Credit Aggregator 14.5.2, Retail Entities 14.6, Awarding of Renewable Energy Credits 14.6.2, Awarding of Compliance Premiums 14.7, Transfer of Renewable Energy Credits or Compliance Premiums Between Parties 14.8, Renewable Energy Credit Offsets 14.9, Allocation of Statewide Renewable Portfolio Standard Requirement Among Retail Entities 14.9.1, Annual Capacity Targets 14.9.2, Capacity Conversion Factor 14.9.3, Statewide Renewable Portfolio Standard Requirement 14.9.3.1, Preliminary Renewable Portfolio Standard Requirement for Retail Entities 14.9.4, Application of Offsets - Adjusted Renewable Portfolio Standard Requirement 14.9.5, Final Renewable Portfolio Standard Requirement 14.10, Retiring of Renewable Energy Credits or Compliance Premiums 14.10.1, Mandatory Retirement 14.10.2, Voluntary Retirement 14.11, Penalties and Enforcement 14.12, Maintain Public Information 14.13, Submit Annual Report to Public Utility Commission of Texas 18.2, Methodology 18.2.7.1, Sample Maintenance 18.2.8, Adjustments and Changes to Load Profile Development 18.7.1.1, Overview 18.7.2, Other Load Profiling | Approved | ||
| NPRR255 | Resolution of Alignment Item A81 - DRUC Timing and Execution when DAM is Delayed or Aborted | This Nodal Protocol Revision Request (NPRR) adds new Section 5.2.2 to describe the process that ERCOT will follow in the event that the Day-Ahead Market (DAM) is delayed or aborted. | 07/15/2010 | ERCOT | No | 4.1.2, 5.2.1, 5.2.2 (new), 5.2.2.1 (new), 5.2.2.2 (new) | Approved | ||
| NPRR256 | Synchronize Nodal Protocols with PRR787, Add Non-Compliance Language to QSE Performance Standards (formerly “Add Violation Language to QSE Performance Standards”) | This Nodal Protocol Revision Request (NPRR) aligns the Nodal Protocols with changes implemented from Protocol Revision Request (PRR) 787, Add Non-Compliance Language to QSE Performance Standards (formerly “Add Violation Language to QSE Performance Standards”), approved by the ERCOT Board on 8/18/09, and addresses the exclusion of Generation Resource Energy Deployment Performance (GREDP) during testing periods . This NPRR also addresses timing discrepancies in updating Resources’ Ancillary Service Schedule during qualification testing. As various questions currently being discussed through the Qualified Scheduling Entity (QSE) Managers Working Group (QMWG) and Nodal Advisory Task Force (NATF) are addressed by ERCOT regarding performance metrics as outlined in Nodal Protocol Section 8, Performance Monitoring, it is envisioned that additional changes from those discussions will be incorporated into this NPRR. | 07/15/2010 | Luminant | No | 2.1, 2.2, 3.1.4.6, 3.1.4.8, 8.1.1.1, 8.1.1.2.1.2, 8.1.1.2.1.3, 8.1.1.4 | Approved | ||
| NPRR257 | Synchronization with Nodal Operating Guide Section 9, Monitoring Programs and Changes to Posting Requirements of Documents Considered CEII (formerly “Synchronization with Nodal Operating Guide Section 9, Monitoring Programs”) | This Nodal Protocol Revision Request (NPRR) grey-boxes multiple sections of the Nodal Protocols to align with Nodal Operating Guide Section 9, Monitoring Programs. This NPRR also changes the posting requirement for certain Black Start documents which meet the definition of Critical Energy Infrastructure Information (CEII) and removes the requirement for posting Black Start procedures for Resource Entities that have Black Start Agreements with ERCOT since 8.1 is related to performance monitoring. | 07/23/2010 | ERCOT | No | 6.5.7.3, 6.5.9.6, 8, 8.1, 8.2, 8.3 | Approved | ||
| NPRR258 | Synchronization with PRR824 and PRR833 and Additional Clarifications | This Nodal Protocol Revision Request (NPRR): (1) Synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 824, Primary Frequency Response from WGRs and PRR833, Primary Frequency Response Requirement from Existing WGRs; (2) Refines and clarifies the definition of Generation Resource Energy Deployment Performance (GREDP); (3) Moves the definition of Measurable Event to Section 2.1; and (4) Proposes a definition for Dead Band as defined in Section 6.2.1.4, Definitions, of the zonal Operating Guides. |
07/23/2010 | PDCWG | No | 2.1, 2.2, 3.17.2, 6.5.7.6.2.2, 8.1.1.4.1, 8.1.1.4.2, 8.5, 8.5.1.1, 8.5.1.2, 8.5.1.3, 8.5.2, 8.5.2.1 | Approved | ||
| NPRR259 | Resolution of Alignment Items A175 and A176 - Settlement of Generation Resources Dispatched to Meet System Reliability Requirements | This Nodal Protocol Revision Request (NPRR) clarifies that all commitments of a specific Generation Resource in response to an ERCOT Dispatch Instruction (whether issued electronically or verbally) for the commitment of that Generation Resource will be considered to be a Reliability Unit Commitment (RUC) and will be settled in accordance with the RUC Settlement provisions described in the Nodal Protocols. | 07/28/2010 | ERCOT | No | 5.1, 6.5.9.4.1 | Approved | ||
| NPRR260 | Providing Access to MIS Secure Area to MIS Registered Users | This Nodal Protocol Revision Request (NPRR) adds "Independent Market Information System (MIS) Registered Entity" to Section 2.1 and Section 22, Attachment A. By doing so, the Standard Form Market Participant Agreement would bind Independent MIS Registered Entities to the Nodal Protocols and, in particular, provisions in Section 16.12. | 08/05/2010 | Crescent Power | No | 2.1, Definitions 16.12, User Security Administrator and Digital Certificates 16.15, Registration of Independent Market Information System Registered Entity(new) 22, Attachment A: Standard Form Market Participant Agreement | Approved | ||
| NPRR261 | Revision of Data Submission Timeline for Network Model | This Nodal Protocol Revision Request (NPRR) removes the three-month summer model and replaces it with individual model packages for each month. This NPRR also separates item (5) of Section 3.10.4 into three paragraphs for clarification of ERCOT’s requirements. | 08/09/2010 | ERCOT | No | 3.10.1, 3.10.4 | Approved | ||
| NPRR262 | Protocol Synchronization for Nodal Implementation Surcharge | This Nodal Protocol Revision Request (NPRR) modifies the Nodal Implementation Surcharge (NIS) calculation to mirror the existing zonal calculation, by including generation from Non-Modeled Generators and energy imported into the ERCOT System during a declared Emergency Condition through each Direct Current Tie (DC Tie) in response to an ERCOT Dispatch Instruction. | 08/09/2010 | ERCOT | No | 9.16.4, ERCOT Nodal Implementation Surcharge | Approved | ||
| NPRR263 | Resolution of Alignment Item A99 - Settlement Point Price Calculation When Busses are De-energized | This Nodal Protocol Revision Request (NPRR) adds the requirement for ERCOT to assign a Locational Marginal Price (LMP) for use in the calculation of Day-Ahead and Real-Time Settlement Point Prices. | 08/11/2010 | ERCOT | No | 4.5.1, 6.6.1 | Approved | ||
| NPRR264 | Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection | This Nodal Protocol Revision Request (NPRR) adds language to specify that for a new Point of Interconnection (POI), Generation Resources must comply with provisions of Other Binding Documents (OBDs), Section 3.15, Voltage Support, and Nodal Operating Guide Section 2.9, Voltage Ride-Through Requirements for Generation Resources, based upon the execution date of the most recent Standard Generation Interconnection Agreement (SGIA). For existing Generation Resources with more than one POI, compliance with these requirements is based on the execution of the SGIA relative to the POI where the Generation Resource is electrically connected. This NPRR also revises the definition of POI to clarify that the POI is determined by the voltage level and substation, rather than the location, of the relevant interconnection. |
08/12/2010 | WMS | No | 1.6.5, 2.1 | Approved | ||
| NPRR265 | MIS Secure Area Posting of Resource Category – As-Built Clarification | This Nodal Protocol Revision Request (NPRR) accounts for the posting of Resource Categories as a secure extract to the Market Information System (MIS) Secure Area in support of calculating Minimum and Maximum Resource Prices in Congestion Revenue Right (CRR) Settlement. This NPRR also adds a definition for “Resource Category.” | 08/31/2010 | ERCOT | No | 2.1, 7.9.1.3 | Approved | ||
| NPRR266 | Installed Capacity of Unregistered Distributed Generation (DG) | This Nodal Protocol Revision Request (NPRR) clarifies that only the capacity of unregistered Distributed Generation Resources (DGs) is totaled for the determination that the DG registration threshold must be lowered. | 08/31/2010 | CPS Energy | No | 16.5 | Approved | ||
| NPRR267 | Remove All References to Pseudo Devices (formerly “Allow ERCOT to Manage Operations Model Pseudo Devices”) | This Nodal Protocol Revision Request (NPRR) removes references to pseudo devices from the Nodal Protocols. |
08/31/2010 | AEP | No | 2.1, 3.10, 3.10.1, 3.10.5, 3.10.7.1, 3.10.7.5.1, 6.5.7.1.13 | Approved | ||
| NPRR268 | Posting Requirements of Verifiable Costs Documents | This Nodal Protocol Revision Request (NPRR) allows ERCOT to post the Verifiable Cost Manual publicly on the ERCOT website. | 08/01/2010 | ERCOT | No | 5.6.1 | Approved | ||
| NPRR269 | Synchronization of PRR830, Reactive Power Capability Requirement | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with Protocol Revision Request (PRR) 830, Reactive Power Capability Requirement, approved by the ERCOT Board on 11/17/2009. In addition, Nodal Protocol references to Point of Interconnection (POI) are being updated to reflect the defined term where appropriate. | 09/09/2010 | ERCOT | No | 2.1, 2.2, 3.10.7.3, 3.15, 3.15.1, 3.15.2, 6.5.7.7, 10.3.2.2, 10.3.2.3, 11.1.5 | Approved | ||
| NPRR270 | Defining the Variable Used in the Wind Generation Formula | This Nodal Protocol Revision Request (NPRR) inserts variable definitions for the wind adjust formula in the grey-boxed language for Section 11.4.4.2; and changes references of Transmission and/or Distribution Service Provider (TDSP) to Distribution Service Provider (DSP) where appropriate in Section 10.2.2. | 09/13/2010 | ERCOT | No | 10.2.2, 11.4.4.2, 11.4.4.3 | Approved | ||
| NPRR271 | Synchronization to PRR850, Weather Responsiveness Determination for Interval Data Recorders | This Nodal Protocol Revision Request (NPRR) aligns the Nodal Protocols with zonal Protocols by adding language that limits the applicability of the weather responsiveness test to Interval Data Recorder (IDR) Meters. | 09/13/2010 | ERCOT | No | 11.4.3, 11.4.3.1 | Approved | ||
| NPRR272 | Definition and Participation of Quick Start Generation Resources | This Nodal Protocol Revision Request (NPRR) provides language for effective participation of Quick Start Generation Resources (QSGRs) in Security-Constrained Economic Dispatch (SCED). Revisions for which implementation is not necessary prior to the Texas Nodal Market Implementation Date are grey-boxed. See also the White Paper entitled “Proposal for Determining Mitigated Cap Variable O&M Cost for Quick Start Generation Resources” included with this NPRR submission as an attachment. | 09/16/2010 | ERCOT | No | 2.1, 2.2, 3.8, 3.8.3, 3.9.1, 4.4.9.4.1, 6.4.6, 6.6.5.3, 6.6.9, 6.6.9.1, 8.1.1.2 | Approved | ||
| NPRR273 | Allow Use of the ONTEST Resource Status to Indicate Resource Startup, Shutdown and Test Operations | The Generation Resource Status of “ONTEST” was originally created in the Protocols to recognize generation unit test operations that could not be dispatched by Security-Constrained Economic Dispatch (SCED). These operations included testing of the unit for economic performance, emissions compliance, qualification for provision of Ancillary Services, voltage/MVaR management, and other unit testing activities. This Nodal Protocol Revision Request (NPRR) expands the use of this Resource Status to provide for Generation Resource operations during start up and shut down of the unit as well as unit testing requirements. The Resource Status “ONTEST” will allow for Qualified Scheduling Entities (QSEs) to indicate to ERCOT through telemetry that the Resource is operating in a start-up or shut-down sequence and is being manually dispatched by the QSE in addition to the original purpose to indicate that the Generation Resource is performing a test of its operations either manually dispatched by the QSE or by ERCOT as part of the testing. This Resource Status will be recognized by the current nodal systems design and will cause the SCED output Base Point to be set equal to the net real power telemetry of the Resource at the time of SCED execution. The Resource Status “ONTEST” will also be recognized in Settlements and considered a Base Point Deviation charge exemption. Resource Status will replace the Low Sustained Limit (LSL)/ High Sustained Limit (HSL) telemetry as an input to the TELHSLFLAG due to system limitations. Consistent with the additional uses of the Resource Status code, its description has been revised to remove the requirement that an Output Schedule is required when this Resource Status is assigned by the QSE. |
09/16/2010 | ERCOT | No | 3.9.1, 3.9.2, 6.4.2.4, 6.4.3, 6.5.7.8, 6.6.5 | Approved | ||
| NPRR274 | Generic Startup Costs for Combined Cycle Generation Resources – Removal of Temporal Constraint | This Nodal Protocol Revision Request (NPRR) removes the Startup Offer Generic Cap Resource Categories for Combined Cycle Generation Resources with less than five hours Off-Line. | 09/16/2010 | ERCOT | No | 4.4.9.2.3 | Approved | ||
| NPRR275 | Clarify QSE’s Ability to Make Changes to Ancillary Service Resource Responsibility In Real Time | This Nodal Protocol Revision Request (NPRR) clarifies the responsibility of Qualified Scheduling Entities (QSEs) to telemeter the Ancillary Service Resource Responsibility for each Resource in Real-Time. | 09/16/2010 | ERCOT | No | 6.3.1, 6.3.2, 6.4.6, 6.4.6.1 | Approved | ||
| NPRR276 | MIS Posting Requirement for the Network Operations Model Load Schedule | This Nodal Protocol Revision Request adds a Market Information System (MIS) Public Area posting requirement for the database load schedule. |
09/16/2010 | ERCOT | No | 3.10.1 | Approved | ||
| NPRR277 | Removal of NPRR119 Language for LDL Calculation and Modification to the SCED Ramp Rate Calculation (formerly “Removal of NPRR119 Language for LDL Calculation”) | This Nodal Protocol Revision Request (NPRR) removes changes that were made to the Low Dispatch Limit (LDL) calculation within the Resource Limit Calculator (RLC) as part of NPRR119, Resource Limit Calculator. The language in this NPRR will ensure that a Resource’s Dispatch limits are calculated taking into consideration the Resource’s current net MW output and ramp rates. This NPRR also changes the Security-Constrained Economic Dispatch (SCED) Up and Down Ramp Rate calculation (SURAMP and SDRAMP) to reduce the amount of ramp rate that is reserved for Regulation Service. |
09/16/2010 | ERCOT | No | 6.5.7.2, 8.1.1.4.1 | Approved | ||
| NPRR278 | Emergency Interruptible Load Service (EILS) Modifications to Correct Self-Provision Settlement Equations, to Accommodate Advanced Metering Infrastructure, and other Clarifications | This Nodal Protocol Revision Request (NPRR) proposes several modifications to the Nodal Protocols relating to EILS. The four changes proposed in this NPRR that ERCOT considers to be most important are as follows: · Amends Section 3.14.3, specifically paragraphs (8)(b), (c) and (d), and Sections 6.6.11.1 and 6.6.11.2 to correct a Settlement inequity for Qualified Scheduling Entities (QSEs) providing EILS through Self-Provision. · Amends Section 8.1.3.1, specifically paragraph (2)(b), to provide ERCOT with an important option for accommodating EILS Loads potentially consisting of large aggregations of Customers with Advanced Meters. · Amends paragraph (7)(f) of Section 3.14.3 to remove the requirement that EILS capacity offers must be submitted in whole MW amounts. · Adds a new paragraph (5)(e) to Section 8.1.3.1 to define a mechanism for ERCOT to reduce the payment for an EILS Load that fails two consecutive Load-shed tests in an EILS Contract Period. In addition, this NPRR proposes additional modifications related to EILS that ERCOT considers to be clarifying in nature. For additional detail regarding the revisions proposed in this NPRR, please see “Comments” section of NPRR submission form (Key Documents tab). |
09/16/2010 | ERCOT | No | 2.1, 3.14.3, 6.6.11.1, 6.6.11.2, 8.1.3.1, 8.1.3.2, 8.1.3.3, 8.1.3.3.1 | Approved | ||
| NPRR279 | Resolution of Alignment Item A144 - Clarify Posting of MCPC for DAM and SASM | This Nodal Protocol Revision Request (NPRR) conforms the Nodal Protocols to the system and business process implementation for posting of prices from the Day-Ahead Market (DAM) and any Supplemental Ancillary Services Market (SASM). Reports of clearing prices in the DAM and SASM will be reviewed and if the potential exists for a change in the prices, ERCOT will notify Market Participants and describe the nature of the error and any conditions that may have caused the error. | 09/16/2010 | ERCOT | No | 4.5.3, 6.3, 6.4.8.2.3 | Approved | ||
| NPRR280 | Move Shift Factor Posting Requirement to Real-Time | This Nodal Protocol Revision Request (NPRR) moves the requirement to post Shift Factor data from the Day-Ahead Operations section (Section 4.2.3) of the Nodal Protocols as a daily posting to the Real-Time operations section (Section 6.5.7.1.13) as an hourly posting. | 09/24/2010 | ERCOT | No | 4.2.3, 6.5.7.1.13 | Approved | ||
| NPRR281 | Replace 7-Day Forecast Requirement for QSEs Representing WGRs | This Nodal Protocol Revision Request (NPRR) eliminates the requirement that Qualified Scheduling Entities (QSEs) representing Wind-powered Generation Resources (WGRs) must provide a 7-day forecast in their COP. Instead, for hours 49-168, QSEs representing WGRs shall, using their best estimate enter a High Sustained Limit which may be based on the wind power profile as published on the ERCOT website. | 09/27/2010 | AEP Energy Partners | No | 2.1, 3.9.1 | Approved | ||
| NPRR282 | Dynamic Ramp Rates Use in SCED | This Nodal Protocol Revision Request (NPRR) proposes revisions that are intended to result in more reasonable Dispatch of Generation Resources when a telemetered Base Point requires the Resource to employ technologies that in turn change the Resource’s ramp rate. For example, when Security-Constrained Economic Dispatch (SCED) generates a new Base Point for a unit that is currently at baseload, SCED uses a static ramp rate found in the Resource Parameters database that does not accurately reflect the dynamic ramp rate that the unit can deliver as it leaves baseload status (ten MW/min. for some units) and goes into duct burners (one MW/min. for some units) or through duct burners into other technologies such as certain forms of power augmentation. Instead of using the declared static ramp rates at designated output levels, SCED should use a dynamic ramp rate that can be telemetered by the Qualified Scheduling Entity (QSE) to ERCOT using the Inter-Control Center Communications Protocol (ICCP) database with an update rate of two or four seconds, which will better match the unit’s ramp rate capability during the SCED execution. The up and down ranges of this telemetered dynamic ramp rate are best defined by ERCOT based on its experience in the Nodal Market trials and its view of the SCED Base Point outcomes and its analysis of the Generation Resource Energy Deployment Performance (GREDP) scores and Regulation Service deployed. | 09/28/2010 | Calpine | No | 2.1, 6.5.7.1.12, 6.5.7.2 | Approved | ||
| NPRR283 | Clarification of PCRR Allocation Eligibility | This Nodal Protocol Revision Request (NPRR) extends Pre-Assigned Congestion Revenue Right (PCRR) eligibility for certain wholesale supply over the high voltage Direct Current Ties (DC Ties). | 09/30/2010 | Tex-La Electric Cooperative of Texas, Inc. | No | 7.4.1 | Approved | ||
| NPRR284 | Cost Allocation Zones as They Relate to NOIE Load Zones – As Built Systems | Changes the Cost Allocation Load Zone assignment for NOIE Load Zones to a single 2003 Congestion Management Zone (CMZ) for go-live. | 09/30/2010 | ERCOT | No | 3.4.3 | Approved | ||
| NPRR285 | Generation Resource Base Point Deviation Charge Corrections | This Nodal Protocol Revision Request (NPRR) provides that an exception to the Generation Resource Base Point Deviation Charge for any 15-minute Settlement Interval which includes a Security-Constrained Economic Dispatch (SCED) interval that is less than four minutes in duration. Additional changes are proposed to Base Point Deviation Charges for over- and under-generation, to be effective upon system implementation. This NPRR also removes the Base Point Deviation Charge for all Intermittent Renewable Resources (IRRs) until corrections to the Nodal systems can be implemented so that the charge applies to IRRs only when there is clear indication that the Base Point received needs to be followed. A flag will be sent by ERCOT to the Qualified Scheduling Entity (QSE) for each Resource indicating SCED has Dispatched a Generation Resource below the High Dispatch Limit (HDL) used by SCED. This flag will be used by the Settlement system to determine when the IRR Generation Resource Base Point Deviation Charge will apply. In addition, the calculations are changed to apply the charge whether the Settlement Point Price is negative or positive. |
10/13/2010 | WMS | No | 6.5.5.2, 6.5.7.4, 6.5.7.9, 6.6.5.1, 6.6.5.1.1, 6.6.5.1.2, 6.6.5.2 | Approved | ||
| NPRR286 | DAM Credit – Non-Business Day Processing | This Nodal Protocol Revision Request (NPRR) will allow ERCOT to send Available Credit Limits (ACLs) to Counter-Parties participating in the Day-Ahead Market (DAM) and to send related collateral requests, as needed, on non-Business Days. | 10/14/2010 | ERCOT | No | 4.4.10, 16.11.4.1, 16.11.4.3, 16.11.4.4, 16.11.4.5, .11.4.6.2, 16.11.4.7, 16.11.5, | Approved | ||
| NPRR288 | Selection of CRR Load Distribution Factors for Use in CRR Monthly and Annual Auctions | As ERCOT has worked through improvements in development of the Load distribution factor values used in the Day-Ahead Market (DAM) and Network Model validation process, this Nodal Protocol Revision Request (NPRR) has been created to allow the Congestion Revenue Right (CRR) Auction process to leverage use of this alternative Load distribution factor for monthly CRR Auctions. In this manner, the monthly CRR Auction and DAM are more operationally accurate and aligned. This NPRR also includes a change to Section 7.3 to clarify that the Flowgate Revenue Rights, which ERCOT is required to auction, are those flowgates defined and described in accordance with Section 7.3.1, Flowgates. |
10/20/2010 | ERCOT | No | 7.3, 7.5, 7.5.1 | Approved | ||
| NPRR289 | Clarify Use of Raise/Lower Block Status Telemetry | This Nodal Protocol Revision Request (NPRR) inserts language into Section 6.5.5.2 to clarify the proper use of Raise Block Status and Lower Block Status telemetry points by Resource operators in Real-Time operations. | 10/28/2010 | ERCOT | No | 6.5.5.2 | Approved | ||
| NPRR290 | ERCOT Publication of DAM PSS/E Files | This Nodal Protocol Revision Request (NPRR) enhances transparency of the transmission topology (including all scheduled Outages) used in the Day-Ahead Market (DAM) by requiring ERCOT to publish certain data files (in Power System Simulator for Engineering (PSS/E format) for easy review by all Market Participants with standard power flow tools such as PTI PSS/E, Power World Simulator, etc. Much of the tools needed by ERCOT to meet the requirements of this NPRR were developed and semi-automated during the Nodal DAM market trials and this NPRR seeks to leverage that work for long term market benefit. | 10/28/2010 | Henry Durrwachter on behalf of Luminant Energy Company LLC | No | 4.5.3 | Approved | ||
| NPRR291 | Reduce the Comment Period for NPRRs and SCRs | This Nodal Protocol Revision Request (NPRR) reduces the comment period for NPRRs and System Change Requests (SCRs) from 21 days to 14 days and removes the requirement for the comment period to end at least three Business Days prior to the next regularly scheduled meeting of the subcommittee considering the NPRR or SCR. | 10/28/2010 | ERCOT | No | 21.4.3, 21.8.3 | Approved | ||
| NPRR292 | Add Key Provisions of RPG Charter to Protocols | This Nodal Protocol Revision Request (NPRR) adds certain key provisions of the Regional Planning Group (RPG) Charter and Procedures (the RPG Charter), approved by the Board in January 2009, to the Nodal Protocols without changing requirements or process. This NPRR also revises certain language within the existing Nodal Protocols for consistency with the added provisions and to coordinate with future Planning Guides. If needed, substantive changes to the planning process will be addressed through other NPRR and Planning Guide Revision Requests (PGRRs). | 10/29/2010 | Planning Working Group (PLWG) | No | 2.1, 2.2, 3.1.3.1, 3.11.1, 3.11.2, 3.11.3, 3.11.4, 3.11.4.1, 3.11.4.2, 3.11.4.3, 3.11.4.4, 3.11.4.5, 3.11.4.6, 3.11.4.7, 3.11.4.8, 3.11.4.9, 3.11.4.10, 3.11.6 | Approved | ||
| NPRR293 | Requirement to Post PTP Obligation Quantities Awarded in DAM (formerly “Requirement to Post CRR Option and Obligation Quantities Cleared in DAM or Taken to Real Time”) | This Nodal Protocol Revision Request (NPRR) adds language to specify the need for ERCOT to post quantities of Point-to-Point (PTP) Obligations that were awarded in the Day-Ahead Market (DAM). | 11/04/2010 | Luminant Energy Company, LLC | Yes | 4.5.3 | Approved | ||
| NPRR294 | Texas SET 4.0 Including: Acquisition and Transfer of Customers From One REP to Another; Meter Tampering Transactional Solution | This Nodal Protocol Revision Request (NPRR) defines the process for Mass Transition of Electric Service Identifiers (ESI IDs) from one Competitive Retailer (CR) to another CR when transitioning due to an acquisition, the process for switch hold indicator addition and removal, and other various changes deemed to be implemented with Texas Standard Electronic Transaction (TX SET) version 4.0. Changes to accommodate priority move-outs (including addition of the priority code and one hour processing of priority move-outs by ERCOT) and same day switches (changing the First Available Switch Date (FASD) to zero) are pending a Public Utility Commission of Texas (PUCT) rulemaking and are subject to revision. |
11/05/2010 | Jennifer Frederick on behalf of Texas SET Working Group | No | 15, 15.1.1, 15.1.1.2.2, 15.1.1.3, 15.1.1.4, 15.1.1.5, 15.1.1.6, 15.1.1.7, 15.1.1.8, 15.1.3, 15.1.3.1 (new); 15.1.3.2 (new) 15.1.3.1, 15.1.4.1, 15.1.4.2, 15.1.4.3, 15.1.4.4, 15.1.4.5, 15.1.4.5.1, 15.1.4.6, 15.1.4.7, 15.1.4.7.1, 15.1.4.7.2, 15.1.4.8, 15.1.5.1, 15.1.5.2, 15.1.5.3, 15.1.5.4, 15.1.5.5, 15.1.5.6, 15.1.5.7, 15.1.7. 15.1.8, 15.1.9.1, 15.1.9.2, 15.1.9.3, 15.1.9.4, 15.1.10, 15.1.10.1, 15.1.10.2, 15.1.10.3, 15.1.10.4, 15.2, 15.2.3, 15.3, 15.4.1, 15.4.1.4, 15.4.1.5, 19, 19.3.1, 19.4.1, 24.1, 24.1.1, 24.1.2.1, 24.1.2.2, 24.1.3 (new), 24.1.3.2 (new), 24.2, 24.3.1, 24.3.1.4, 24.4, 24.4.5, 24.5.1, 24.6.1, | Approved | ||
| NPRR295 | Synchronization of Protocol for Generation Resource Designation as Mothballed or Decommissioned | This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with zonal Protocol Section 6.5.9.3, Generation Resource Return to Service Updates, regarding return-to-service of Mothballed or Decommissioned Generation Resources. In addition, a clarification was made for removal of Decommissioned Generation Resources from ERCOT registration systems. | 11/11/2010 | ERCOT | Yes | 2.1, 3.14.1.9, 22, Attachment H: | Approved | ||
| NPRR296 | Remove Posting Requirement for the Annual Planning Model for the CRR Auction | This Nodal Protocol Revision Request (NPRR) removes the requirement to post a schedule for updating transmission information for the Annual Planning Model six months prior to the annual and two-year Congestion Revenue Right (CRR) Auctions. | 11/15/2010 | ERCOT | No | 3.10.2 | Approved | ||
| NPRR297 | Add Administrative NPRR Process to Nodal Protocols | This Nodal Protocol Revision Request (NPRR) adds a process for “Administrative NPRRs” to the Nodal Protocols modeled on the similar process for administrative market guide revisions contained in each of the market guides. | 11/23/2010 | ERCOT | No | 21.1, 21.6 | Approved | ||
| NPRR298 | New Definitions Related to Black Start and Clarification to the Hourly Standby Fee Payments for Black Start Resources (formerly “New Definitions Related to Black Start”) | This Nodal Protocol Revision Request (NPRR) proposes new definitions to Section 2.1 and clarifies the use of black start terminology in other sections of the Nodal Protocols. This NPRR also identifies uses of the proposed terms(s) and makes language changes if applicable and aligns the terminology and acronym related to the Hourly Standby Fee Payment with Section 6.6.8.1, Black Start Capacity Payment. | 11/29/2010 | Operations Working Group (OWG) | No | 2.1, 3.14.2, 6.5.9.6, 8.1.1.2.1.5, 22D | Approved | ||
| NPRR299 | Remove Requirement for ERCOT Board Approval of PUCT, IMM, and FERC Required Reports | This Nodal Protocol Revision Request (NPRR) modifies the Nodal Protocols to better capture the requirement for ERCOT to prepare and submit reports in accordance with its regulatory requirements. This NPRR removes the need for the ERCOT Board, Public Utility Commission of Texas (PUCT) Staff and Independent Market Monitor (IMM) to approve a schedule and format for reports. | 11/30/2010 | ERCOT | No | 17.5 | Approved | ||
| NPRR301 | Correct Energy Trade Language for Adjustment Period | This Nodal Protocol Revision Request (NPRR) revises the language in Section 4.4.2 for entering Energy Trades in the Adjustment Period to match that of the latest Edison Electric Institute.(EEI) Amendment. | 12/03/2010 | Morgan Stanley | No | 4.4.2 | Approved | ||
| NPRR302 | Correct Fuel Type Language for Mitigated Offer Cap | This Nodal Protocol Revision Request (NPRR) revises the language for the Mitigated Offer Cap to eliminate use of the Fuel Oil Price (FOP) in the calculation. | 12/07/2010 | Morgan Stanley | Yes | 4.4.9.4.1 | Approved | ||
| NPRR303 | Requirement to Post PTP Options Cleared in DAM or Taken to Real-Time | This Nodal Protocol Revision Request (NPRR) adds language to specify the need for ERCOT to post quantities of Point-to-Point (PTP) Options and PTP Options with Refund that were not cleared in the Day-Ahead Market (DAM) and taken to Real-Time for Settlement. | 12/16/2010 | Luminant Energy Company, LLC | Yes | 4.5.3 | Approved | ||
| NPRR304 | Removal of Frequency Bias Methodology Approval Requirement | This Nodal Protocol Revision Request removes the requirement for ERCOT to develop a methodology, subject to Technical Advisory Committee (TAC) approval, to determine the optimal frequency bias for given system conditions. | 12/17/2010 | ERCOT | No | 6.5.7.6.1 | Approved | ||
| NPRR305 | Timeline for Calculating the Value of X | This Nodal Protocol Revision Request (NPRR) removes from the Nodal Protocols language describing the effective date for the value of X for the purpose of determining verifiable startup costs and instead refers to the Verifiable Cost Manual as the source for such information. | 01/11/2011 | VCWG | Yes | 5.6.1.1 | Approved | ||
| NPRR306 | Revisions to Protected Information to Include Black Start Documents Considered CEII | This Nodal Protocol Revision Request (NPRR) revises Section 1.3.6 to include Black Start documents that meet the definition of Critical Energy Infrastructure Information (CEII). | 01/11/2011 | OWG | No | 1.3.6 | Approved | ||
| NPRR307 | Change SASM Offer Procedures | This Nodal Protocol Revision Request (NPRR) deletes the requirement of valid SASM offers to be at or below the value of the offers in the Day Ahead Market (DAM). | 01/11/2011 | Morgan Stanley | Yes | 6.4.8.2.1 | Approved | ||
| NPRR310 | Expand Output Schedule Acceptable Range to Include HSL and LSL | This Nodal Protocol Revision Request (NPRR) updates the criteria by which Output Schedules are deemed valid to include Output Schedules that are equal in value to the Resource High Sustained Limit (HSL) and Low Sustained Limit (LSL). | 01/14/2010 | Tenaska | No | 6.4.2.3 | Approved | ||
| NPRR311 | Correction of Wind Adjust Formula to Account for Daylight Savings Time | This Nodal Protocol Revision Request (NPRR) corrects the formula for the reduction of wind excess generation to account for Daylight Savings Time (DST) adjustments in the Spring and Fall for Electric Service Identifiers (ESI ID)s with non- Interval Data Recorders (IDR)s. | 02/01/2011 | ERCOT | No | 11.4.4.2 | Approved | ||
| NPRR312 | Clarification of QSE Requirements for Split Generation Resources | This Nodal Protocol Revision Request (NPRR) defines Master QSE, clarifies the designation and responsibilities of the Master QSE for a Generation Resource that has been split to function as two or more Split Generation Resources, and clarifies the responsibilities of the QSEs for such Split Generation Resources. This NPRR also addresses Settlement and billing disputes related to the application of integrated Real-Time telemetry from a Generation Resource that has been split to function as two or more Split Generation Resources. | 02/01/2011 | ERCOT | Yes | 2.1, 3.1.4.1, 3.8.1, 3.10.7.5.2, 6.5.5.2, 6.5.7.8, 9.14.8, 10.3.2.1, 10.3.2.1.1, 10.3.2.1.2, 10.3.2.1.3, 10.3.2.1.4, 10.3.2.1.5 | Approved | ||
| NPRR313 | Revisions to the Resource Plan Reference to Current Operating Plan for EILS and Synchronous Condensers and Black Start Notification Requirements (formerly “Updating the Term Resource Plan to Current Operating Plan”) | This Nodal Protocol Revision Request (NPRR) replaces the term “Resource Plan” with the term “Current Operating Plan” or “Availability Plan” in those instances where the change in terminology was not previously made. This NPRR also proposes adding a Black Start capable status indicator to the Availability Plan to allow ERCOT to settle payment for Black Start units programmatically; and allows Qualified Scheduling Entities (QSEs) with Black Start units to provide all of the Black Start availability through the Availability Plan. | 02/01/2011 | Luminant Energy Company LLC | No | 2.1, 3.14.3, 4.3, 22, Attachment D, Attachment F, | Approved | ||
| NPRR314 | Requirement to Post Generation Resources Temporal Constraints | This Nodal Protocol Revision Request (NPRR) adds language to specify the need for ERCOT to post to the Market Information System (MIS) Certified Area the current time since a Generation Resource last went Off-Line (in hours) and the corresponding startup time ERCOT is using for of all Off-Line Generation Resources which may be considered in any Reliability Unit Commitment (RUC) process. | 02/01/2011 | Luminant Energy Company, LLC | No | 5.1 | Approved | ||
| NPRR316 | Negative Self-Arranged Ancillary Services Quantity (formerly “Negative Self-Arranged Ancillary Services”) | This Nodal Protocol Revision Request (NPRR) allows Qualified Scheduling Entities (QSEs) to enter a negative value for a Self-Arranged Ancillary Service Quantity. | 02/02/2011 | Morgan Stanley | Yes | 2.1, 4.3, 4.4.7.1, 4.4.7.1.1 (new), 4.4.7.3, 4.4.7.4, 4.4.10, 4.5.1, 4.6.4.2.2, 4.6.4.2.3, 4.6.4.2.4 | Approved | ||
| NPRR317 | Clarification of Entity Responsible for Hydro Responsive Testing | This Nodal Protocol Revision Request (NPRR) clarifies the Entity responsible for hydro responsive testing. | 02/04/2011 | ERCOT | No | 8.1 | Approved | ||
| NPRR318 | Alignment of Nodal Registration Requirements with Current Registration Process | This Nodal Protocol Revision Request (NPRR) aligns the registration requirements in Section 16.1 with the current registration process. | 02/04/2011 | ERCOT | No | 16.1 | Approved | ||
| NPRR319 | Required Documentation to Recover Fuel Costs for RUC Deployments | This Nodal Protocol Revision Request (NPRR) clarifies what type of documentation Qualified Scheduling Entities (QSEs) must submit to ERCOT as proof of natural gas purchases when requesting additional compensation for fuel costs incurred when providing Reliability Unit Commitment (RUC) services. The NPRR further clarifies which documents are deemed acceptable as proof of fuel purchases and directs QSEs to request ERCOT Board approval for documentation not covered by the Nodal Protocols. | 02/07/2011 | ERCOT | No | 9.14.7 | Approved | ||
| NPRR320 | Minimum PTP Option Bid and Settlement (formerly "Minimum PTP Option Bids and CRR Auction Fees") | This Nodal Protocol Revision Request (NPRR) sets a minimum price on PTP Option bids (Minimum PTP Option Bid Price) of $0.010 and places a fee on each PTP Option bid awarded where the clearing price for the PTP Option bid awarded is less than the Minimum PTP Option Bid Price. Upon implementation of system changes, the revenue from the fees will be put in the Congestion Revenue Right (CRR) Balancing Account. Until system changes are implemented, the PTP Option Bidding Fee will be invoiced separately from CRR Invoices using a Miscellaneous Invoice, and the revenue from the fees will be distributed by the Monthly Load Ratio Share (LRS) and through the use of a Miscellaneous Invoice. | 02/08/2011 | Bob Wittmeyer | Yes | 2.1, 7.5.2, 7.5.2.3, 7.5.7, 7.6, 7.7 (new), 7.7.1 (new), 7.7.2 (new), 7.9.3.4, 7.9.3.5, 9.8 | Approved | ||
| NPRR321 | Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period (formerly "Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period for Qualifying Facilities") | This Nodal Protocol Revision Request (NPRR) would provide the ability for Resources to change the amounts of power in their Energy Offer Curves in the Adjustment Period. | 02/10/2011 | Calpine | No | 4.4.9.3, 5.5.2 | Approved | ||
| NPRR322 | Real-Time PTP Option Modeling | This Nodal Protocol Revision Request (NPRR) provides that all Point-to-Point (PTP) Options will be settled in the Day-Ahead Market (DAM), unless DAM fails to execute. If a Non-Opt-In Entity (NOIE) purchases a PTP Obligation in the DAM and owns a PTP Option for the same source and sink pair, and the MWs of the PTP Obligation are not more than the MWs of the PTP Option, then the PTP Obligation will settle in Real-Time as only the positive difference between the sink and source Settlement Point Prices, much like a PTP Option. This NPRR also includes a requirement that NOIEs shape the PTP Options going to Real-Time according to their Load forecast and adds a new type of Congestion Revenue Right (CRR) to handle the treatment of PTP Obligations that are treated as PTP Options for Settlement purposes. | 02/10/2011 | Luminant Energy Company LLC | Yes | 2.1, 3.2.5, 4.3, 4.4.5, 4.4.5.1, 4.4.5.2, 4.4.6, 4.4.6.1, 4.4.6.2, 4.4.10, 4.5.1, 4.5.3, 4.6.3, 6.6.10, 7.9.1.3, 7.9.1.6, 7.9.2.1, 7.9.2.2, 7.9.2.3, 7.9.3.1, 7.9.3.3, 7.9.3.4, 9.5.3, 9.19.1 | Approved | ||
| NPRR323 | Correct DAM Credit Exposure Language and Enable Qualified Expiring CRRs to Offset PTP Bid Exposure | This NPRR revises the language in Section 4.4.10 to match the implemented DAM credit exposure calculations for Three-Part Supply Offers as they relate to combined cycle and to PTP bid calculations currently identified in paragraph (6)(d) of Section 4.4.10; right size the credit exposure calculation for DAM transactions submitted via the use of an energy-only bid curve to equate to the maximum exposure; and right size the credit exposure calculation for DAM PTP bids where a qualified expiring Congestion Revenue Right (CRR) offsets cleared DAM exposure. |
02/10/2011 | Tenaska Power Services | Yes | 4.4.10 | Approved | ||
| NPRR324 | Conductor/Transformer Transmission Facility Rating | This Nodal Protocol Revision Request (NPRR) adds the Conductor/Transformer Rating, normally used for Rate C in the Annual Planning Model, as a fourth Transmission Facility Rating and adds the description from the Operating Guides to the Rating terms definitions in the Nodal Protocols. | 02/10/2011 | ERCOT | No | 2.1, 2.2, 3.10.7.1.1 | Approved | ||
| NPRR325 | Price Correction During SCED Process Failure | This Nodal Protocol Revision Request (NPRR) clarifies the Settlement method that will be used if ERCOT identifies that Real-Time Settlement Point Prices are erroneous and correcting the error will affect Real-Time Dispatch. | 02/10/2011 | ERCOT | Yes | 6.3, 6.5.9.2, 6.6.9 | Approved | ||
| NPRR326 | Adjust the Calculation of the Real-Time Settlement Point Price for a Resource Node | This Nodal Protocol Revision Request (NPRR) adjusts the calculation of the Real-Time Settlement Point Price for a Resource Node. The adjustment is to remove the Base Point weighting of the Real-Time Locational Marginal Prices (LMPs). | 02/10/2011 | ERCOT | No | 6.6.1.1 | Approved | ||
| NPRR327 | State Estimator Data Redaction Methodology | This Nodal Protocol Revision Request (NPRR) inserts language to define a redaction methodology for the posting of State Estimator data. | 02/22/2011 | ERCOT | No | 3.20 (new), 3.20.1 (new), 3.20.2 (new), 6.5.7.1.13 | Approved | ||
| NPRR328 | Clarifies Duplicative or Vague Requirements Related to Reactive Resources (formerly “Removes ERCOT Requirement for Reactive Resource Planning and the Associated Compliance Process”) | This Nodal Protocol Revision Request (NPRR) removes a duplicate requirement for ERCOT to plan reactive Resources and also removes an unassigned and vague requirement for a compliance process. | 02/23/2011 | ERCOT | No | 3.15.2 | Approved | ||
| NPRR329 | Security Classification Changes for Extracts/Reports | This Nodal Protocol Revision Request (NPRR) changes the security classification to “Public” for extracts/reports that are currently classified in the Nodal Protocols as ”Secure”; and suspends the posting of State Estimator Load Reports that reveal individual Load data. | 02/23/2011 | MIS User Group | Yes | 3.2.2, 3.2.3, 3.12, 4.2.2, 4.2.3, 4.2.3.1, 5.3, 6.3.2, 6.5.7.1.13, 6.5.9.2, 6.5.9.3.3, 9.17.1 | Approved | ||
| NPRR330 | Change in Frequency of Four Protocol Required Audits from Annual to Periodic (formerly “Change in Frequency of Five Protocol Required Audits from Annual to Periodic”) | This Nodal Protocol Revision Request (NPRR) revises the frequency for the ERCOT Internal Audit Department to perform audits from an annual basis to a periodic basis. This NPRR impacts: (1) Three annual ERCOT Internal Audit Department-performed audits that are required by paragraph (2) of Section 1.4.3.1: (a) Ethics Compliance Audit – Compliance with Code-of-Conduct and Ethics Corporate Standard (b) Confidentiality Compliance Audit – Compliance with Confidentiality and Protected Information Provisions of Protocols (c) Independence Verification Audit – ERCOT Administration of Protocols is Independent of Market Participants. The ERCOT Internal Audit Department has performed the above three audits annually since 2008. (2) One independent audit required by paragraph (5) of Section 3.10: (a) Audit of Consistent Information in Operations Models This is a new Nodal Protocol required audit and is being performed for the first time in 2011 by the ERCOT Internal Audit Department. (3) One audit required by Section 17.3.3: (a) Audit of ERCOT Market Monitoring Data Handling Processes This is a new Nodal Protocol required audit and is being performed for the first time in 2011 by the ERCOT Internal Audit Department. The ERCOT Internal Audit Department tentatively plans to perform the above five audits no less than once every three years. |
02/24/2011 | ERCOT | No | 1.4.3.1, 3.10, 17.3.3 | Approved | ||
| NPRR331 | Addition of the Balance of the Year PCRR Allocation | This Nodal Protocol Revision Request (NPRR) adds language to paragraphs (c) and (d) of Section 7.4.2 to substantiate the allocation of Pre-Assigned Congestion Revenue Rights (PCRRs) for the balance of calendar year 2011. | 02/25/2011 | ERCOT | Yes | 7.4.2 | Approved | ||
| NPRR332 | Revise QSGR Processes for COP Reporting of QSGR Assigned Off-Line Non-Spin and Application of Emergency Operations Settlement | This Nodal Protocol Revision Request (NPRR):
|
02/25/2011 | ERCOT | No | 3.8.3, 3.9.1, 6.4.6, 6.6.9 | Approved | ||
| NPRR333 | Removal of Redundant Reporting Requirement Related to Equipment Ratings | This Nodal Protocol Revision Request (NPRR) removes a redundant requirement for ERCOT to produce a report regarding equipment Ratings. |
02/25/2011 | ERCOT | No | 3.10 | Approved | ||
| NPRR335 | TSP Request for Interval Data | This NPRR aligns the Nodal Protocols with the zonal Protocols, providing TSPs the ability to request and receive interval data from ERCOT. | 03/01/2011 | Jennifer Bevill on behalf of AEP | Yes | 3.11.4, 11.1.11 | Approved | ||
| NPRR337 | Correct Section Reference in Section 1.3.1.1 Pertaining To Protected Information of DC Ties | This Nodal Protocol Revision Request (NPRR) aligns the Nodal Protocols with the Zonal Protocols by correcting the section reference in Section 1.3.1.1 to reflect the actual section that contains the Direct Current Tie (DC Tie) Schedule Information that is considered Protected Information. | 03/10/2011 | ERCOT | No | 1.3.1.1 | Approved | ||
| NPRR338 | Modifications to Support Revenue Neutrality | This Nodal Protocol Revision Request (NPRR) deducts the amount collected for the shortfall charges for Congestion Revenue Right (CRR) Owners from the amount received on all Real-Time Market (RTM) Invoices prior to prorating the payout to the RTM Invoice Recipients. It also adds language to allow ERCOT to resettle the Day-Ahead Market (DAM) in the event that a DAM Settlement error, which does not otherwise meet the Protocol requirements for resettlement, will impact ERCOT’s ability to achieve revenue neutrality. |
03/17/2011 | ERCOT | No | 9.2.5, 9.19 | Approved | ||
| NPRR339 | Modifications to Heuristic Rules to Determine LMP at De-energized Electrical Bus and Treatment of CRR Offers at De-energized Settlement Points | This Nodal Protocol Revision Request (NPRR): (a) Extends the heuristic rules to determine the Locational Marginal Price (LMP) at de-energized Electrical Buses; and (b) Changes the treatment of Congestion Revenue Right (CRR) offers when either the source or sink Settlement Point is de-energized in the DAM. | 03/18/2011 | ERCOT | Yes | 4.4.5, 4.5.1, 6.6.1 | Approved | ||
| NPRR341 | Remove Ancillary Service Offers from SASM that do not Meet the Lead Time | This Nodal Protocol Revision Request (NPRR) proposes to modify input data processing of Supplemental Ancillary Services Markets (SASMs) to remove offers that do not meet the lead time for each hour in the SASM study period. | 03/23/2011 | ERCOT | Yes | 6.4.8.2.2 | Approved | ||
| NPRR342 | Notification and Actions to Address Outcomes Inconsistent With Efficient Operation of the ERCOT Market | This Nodal Protocol Revision Request (NPRR) details the process for notifying Market Participants of market outcomes in the Day-Ahead Market (DAM) and Real-Time Market (RTM) that are inconsistent with the “efficient operation of the market” in the ERCOT Region, as that term is defined in paragraph (c)(2) of P.U.C. Subst. R. 25.503, Oversight of Wholesale Market Participants. This NPRR gives ERCOT discretion to implement corrective measures and advise Market Participants to discontinue practices that are inconsistent with efficient operation of the ERCOT-administered markets. This NPRR allows the ERCOT CEO to deem any NPRR designed to correct such activity as Urgent. It is assumed that prior to taking actions allowed by NPRR342, ERCOT shall consult with the Independent Market Monitor (IMM) and Public Utility Commission of Texas (PUCT) Staff regarding actions that are inconsistent with the efficient operation of ERCOT-administered markets. |
03/30/2011 | ERCOT | Yes | 4.1, 4.5.3, 6.1, 6.3 | Approved | ||
| NPRR343 | CRR Bid and PTP Obligation Bid Criteria Change | This NPRR would remove the ability to bid for CRRs in the CRR auction or bid for PTP Obligations in the DAM that exist entirely within a station. For the DAM, the implementation would be in two phases: (1) Initial implementation phase where ERCOT manually posts the disallowed Electrically Similar Settlement Points, and programmatically removes those transactions before running the DAM; and (2) Phase after system implementation for automated posting of Electrically Similar Settlement Points built from the 0600 DAM study (supporting Power System Simulator for Engineering (PSS/E) file postings in NPRR290, ERCOT Publication of DAM PSS/E Files) – the DAM solution engine would not award those transactions inclusive of any outages received by 1000 – and automated post-DAM disclosure of the final list of Electrically Similar Settlement Points applicable to the DAM solution. As such, the DAM language contains grey-boxed language to clarify how this would be handled in the two different phases. For CRRs, the implementation for disallowing PTP Obligation bids for Electrically Similar Settlement Points would be in two phases: (1) Initial implementation phase where ERCOT manually identifies and removes each Electrically Similar Settlement Point PTP Obligation bid submitted to the CRR Auction prior to the market optimizations; and (2) Final implementation phase where the CRR application detects and prevents Electrically Similar Settlement Point PTP Obligation bids when the CRR Auction bid portfolio is entered by the Market Participant. In both implementation phases, ERCOT shall post the Electrically Similar Settlement Points with the CRR Auction Market Notice. |
03/30/2011 | ERCOT | Yes | 2.1, 4.2.3, 4.4.6.1, 4.4.6.2, 4.4.9.5.1, 4.4.9.6.1, 4.5.3, 7.5.2.3, 7.5.3.2 | Approved | ||
| NPRR344 | Define RMR Fuel Adder | This Nodal Protocol Revision Request (NPRR) defines the term “fuel adder” as reported by Resource Entities when filing Reliability Must-Run (RMR) contracts. The NPRR also clarifies that the fuel adder will be true-up to reflect actual fuel costs incurred. | 04/01/2011 | ERCOT | No | 3.14.1.16, 6.6.6.2 | Approved | ||
| NPRR346 | Removal of Redundant Posting Requirement Related to Electrical Bus Changes | This Nodal Protocol Revision Request (NPRR) removes a redundant requirement for ERCOT to produce a report regarding Electrical Bus changes. | 04/05/2011 | ERCOT | No | 3.5.1 | Approved | ||
| NPRR347 | Single Daily Settlement Invoice and Updates to Credit Calculations, including addition of a Minimum Collateral Exposure Component (formerly “Counter-Party Invoice and Single Daily Settlement Invoice”) | This Nodal Protocol Revision Request (NPRR) proposes invoicing activity at the Counter-Party level based on the net amount of each Counter-Party’s Qualified Scheduling Entitie’s (QSE’s) and Congestion Revenue Right (CRR) Account Holder’s charges and credits. This NPRR also combines the Day-Ahead Market (DAM) and the Real-Time Market (RTM) Invoices into a single daily Settlement Invoice for these activities. The Settlement Invoice posting on a Business Day includes Operating Days for which a DAM Statement or RTM Statement is posting on the same Business Day. The Settlement Invoice due date is three Bank Business Days after the Settlement Invoice posts. To align with the concept of a single daily Settlement Invoice, this NPRR also requires: (a) adaptation of the language for partial payments and late fees; (b) adaptation of the language for the Default Uplift Invoice; (c) changes to related credit formulas; and (d) automation of the minimum collateral calculation given an increase in the frequency of the calculation. Also, since with this change, Real-Time Settlement Statements will generally be invoiced between three to ten days sooner, this NPRR also proposes reducing the average daily transaction extrapolated multiplier from 40 days to 35 days based on the median reduction in exposure of approximately five days |
04/06/2011 | ERCOT | Yes | 2.1, 9.1.2, 9.3, 9.4, 9.4.1, 9.4.2, 9.4.4, 9.4.5, 9.5.6, 9.6, 9.7, 9.7.1, 9.7.2, 9.7.4, 9.8, 9.10, 9.12, 9.13, 9.14.2, 9.19, 9.19.1, 9.19.2.2, 16.11.4.1, 16.11.4.3, 16.11.4.4, 16.11.4.7 | Approved | ||
| NPRR348 | Generation Resource Start-Up and Shut-Down process | As part of this Nodal Protocol Revision Request (NPRR), Protocol language concerning the use of the "ONTEST" Resource Status during Start-Up and Shut-Down has been removed. Language has been added to address the Start-Up and Shut-Down processes. For Start-Up, language is added so that Resources are exempt from Base-Point Deviation Charges and Generation Resource Energy Deployment Performance (GREDP) metrics when the Resources average base-point value is below the average telemetered Low Sustainable Limit (LSL). The expectation is that when a Resource is receiving base-points below its LSL, the Resource is starting up/shutting down and not necessarily responding to Security Constrained Economic Dispatch (SCED) instructions. For Shut-Down, a new Resource Status is created called "SHUTDOWN". This status will be used by the Resource Limit Calculator (RLC) to calculate dispatch limits for SCED which ramp a Resource down to 0 MW according to the Resource’s provided ramp rate. Again, a Resource will be exempt from Base-Point Deviation Charges and GREDP metrics when the Resource’s average base-point is below the average telemetered LSL. |
04/06/2011 | ERCOT | No | 3.9.1, 6.4.2.4, 6.4.3, 6.5.7.2, 6.5.7.8, 6.6.5, 8.1.1.4.1 | Approved | ||
| NPRR350 | Change to the Security Classification of the System Ancillary Service Capacity Monitor Dashboard | This Nodal Protocol Revision Request (NPRR) proposes changing the posting category of items that make up the System Ancillary Service Capacity Monitor Dashboard from MIS Secure Area to MIS Public Area. | 04/11/2011 | Jackie Ashbaugh on behalf of the MIS User Group | Yes | 6.3.2, 6.5.7.5 | Approved | ||
| NPRR351 | SCED Look-Ahead Step 1: Pricing: Calculate Non-Binding Prices and Basepoints for Initial Research into SCED Look-Ahead and allow Consumers to have a Forward Price Projection (formerly “Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes”) | Using the inputs specified in this Nodal Protocol Revision Request (NPRR), ERCOT will calculate prices and base points over the next hour, using an hour-long optimization instead of a five-minute optimization. These calculated prices and base points will initially be non-binding, although it is anticipated that these will become binding as Security-Constrained Economic Dispatch (SCED) Look-Ahead progresses in future phases. Not covered by this NPRR are the larger pieces of SCED Look-Ahead, like Real-Time commitment of generators and Load Resources (possibly replacing or eliminating the Non-Spinning Reserve (Non-Spin) product), Real-Time co-optimization of energy and Ancillary Services (including determining when the co-optimization occurs), whether to charge make-whole charges and to whom they should be charged to, and how these revisions will support the overall market design and Resource adequacy requirements. |
04/13/2011 | WMS | Yes | 6.3.2, 6.5.7.3 | Approved | ||
| NPRR352 | Real-Time HSL Telemetry for WGRs | This Nodal Protocol Revision Request (NPRR) changes the process by which Qualified Scheduling Entities (QSEs) determine the High Sustained Limits (HSLs) to telemeter for Wind-powered Generation Resources (WGRs). The requirement that QSEs set the HSL equal to output immediately following a release from curtailment is removed. Instead QSEs will be expected to use their best judgment to determine the output capability of the WGR with the expectation that the value will consider the net real power of the WGR, turbine availability, weather conditions, and whether the WGR output is being affected by compliance with a Security-Constrained Economic Dispatch (SCED) instruction. | 04/13/2011 | ERCOT | Yes | 6.5.5.2 | Approved | ||
| NPRR353 | Administrative Changes for the May 1, 2011 Protocols | This Administrative Nodal Protocol Revision Request (NPRR) corrects a reference within the Protocols due to Competitive Metering Guide and Retail Market Guide changes associated with RMGRR094, Adding the Competitive Metering Guide to the Retail Market Guide. | 04/14/2011 | ERCOT | No | 10.1 | Approved | ||
| NPRR354 | Revisions to Non-Spin Performance Criteria Language and Provision for ICCP Telemetry of Non-Spin Deployment | This Nodal Protocol Revision Request (NPRR) clarifies the performance criteria for Non-Spinning Reserve (Non-Spin) Service deployments, adds language for provision of a Non-Spin deployment flag to Qualified Scheduling Entities (QSEs) via Inter-Control Center Communications Protocol (ICCP), and adds a requirement for Extensible Markup Language (XML) notification to all QSEs when Non-Spin is deployed. Specifically, a clarification for the requirement that a Resource be “released to SCED” is added to Sections 6.5.7.6.2.3 and 8.1.1.4.3 to clarify the expectation of ERCOT that at 25 minutes after receipt of the deployment instruction, the Resource must be participating in Security-Constrained Economic Dispatch (SCED) at a net MW output at least equal to its Low Sustained Limit (LSL). The requirements for the three Resource types providing Non-Spin have been divided into separate paragraphs, one each for Load, On-Line and Off-Line Generation Resources. In addition, Generation Resources that are providing Non-Spin from Off-Line Generation Resources would be entitled to receive a compliance exemption for documented start-up loading failures. This language is adopted from the zonal Protocols and is included to recognize the difficulty inherent in unit start-up from a cold state for immediate deployment. | 04/15/2011 | WMS | No | 6.5.7.6.2.3, 8.1.1.4.3 | Approved | ||
| NPRR355 | Adjust the Calculation of the Real-Time Settlement Point Price for a Load Zone | This Nodal Protocol Revision Request (NPRR) removes the energy-weighting in the current calculation for the Real-Time Settlement Point Price (RTSPP) for a Load Zone. It also adds a new RTSPP for a Load Zone that is energy-weighted (Real-Time Settlement Point Price Energy-Weighted (RTSPPEW)) and adjusts the appropriate formulas that use these prices. This NPRR also corrects the Real-Time Price for the Energy Metered for each Resource meter at bus (RTRMPR b) in the event that the Energy at bus near Real-Time (EBNRT) is less than or equal to zero. This NPRR also includes several minor, non-substantive corrections. |
04/27/2011 | ERCOT | No | 6.6.1.2, 6.6.3.1, 6.6.3.2, 6.6.3.3, 6.6.3.5 | Approved | ||
| NPRR356 | EEA Changes Related to Dispatch Instructions and BLTs | This Nodal Protocol Revision Request (NPRR) changes the need to issue Dispatch Instructions to suspend any ongoing ERCOT-required generating unit or Resource performance testing and moves the requirement to inquire about the availability of Block Load Transfers (BLTs) from Energy Emergency Alert (EEA) Level 2A to EEA Level 2B. | 05/04/2011 | ERCOT | No | 6.5.9.4.1, 6.5.9.4.2 | Approved | ||
| NPRR357 | Revisions to Collateral Requirements Concerning CRR Auctions (formerly “Multi-Month CRR Auction and Revisions to Collateral Requirements”) | The Nodal Protocol Revision Request (NPRR) proposes revisions to collateral requirements for Congestion Revenue Right (CRR) Auctions including a pre-CRR Auction screening process to determine the maximum potential exposure of each CRR Account Holder and a path-specific adder to be defined by an ERCOT Board-approved methodology. | 05/04/2011 | Luminant | Yes | 7.5, 7.5.1, 7.5.2, 7.5.5.3, 7.5.6, 7.5.6.1, 7.5.6.2, 7.5.6.3, 9.8, 16.11.4.5, | Approved | ||
| NPRR358 | Clarification of Responsible Entity for Binding Obligations | This Nodal Protocol Revision Request (NPRR) replaces the term “Generation Entity” with “Resource Entity,” where appropriate, to provide clarity that for binding obligations the Resource Entity is designated as the Entity obligated under the Protocols. This NPRR also modifies the definition of Generation Entity. | 05/04/2011 | ERCOT | No | 2.1, 3.14.1.9, 3.14.1.10, 3.14.1.12, 3.14.1.16, 5.6.1, 8.1.1.2.1.4, 11.2.2, 11.5.2, 22E, 22H, | Approved | ||
| NPRR359 | Monthly TDSP Load Report | This Nodal Protocol Revision Request (NPRR) creates a new secure report to provide aggregate Load data for Transmission Service Providers (TSPs) and Distribution Service Providers (DSPs) in a monthly posting. | 05/04/2011 | Market Information System (MIS) User Group | No | 11.5.1.2 | Approved | ||
| NPRR360 | Summary Report of HDL and LDL | This Nodal Protocol Revision Request (NPRR) creates a new posting for the sum of High Dispatch Limit (HDL) and the sum of Low Dispatch Limit (LDL) and any Generation Resource instances of manual overrides of HDL or LDL to the Market Information System (MIS) Public Area after every Security-Constrained Economic Dispatch (SCED) run. This NPRR also adds the requirement to post any Qualified Scheduling Entity (QSE) instances of manual overrides of HDL and LDL for a Generation Resource to the MIS Certified Area after every SCED run. |
05/04/2011 | Jackie Ashbaugh on behalf of the MIS User Group | No | 6.5.7.1.13 | Approved | ||
| NPRR361 | Real-Time Wind Power Production Data Transparency | Current Protocols require that forecasted and actual wind power production be posted hourly. This Nodal Protocol Revision Request (NPRR) is twofold:
These reports will compliment the new Public Aggregated Wind Dashboard proposed in System Change Request (SCR) 765, Public Aggregated Wind Dashboard. |
05/04/2011 | Jackie Ashbaugh on behalf of the Market Information System (MIS) User Group | No | 4.2.2 | Approved | ||
| NPRR362 | Changes to PRC Calculation | This Nodal Protocol Revision Request (NPRR) aligns the Protocols with the current systems. The proposed changes properly reflect the current Responsive Reserve (RRS) which is supplied from Load Resources into the PRC calculation. This NPRR also deletes the method for calculating the PRC from Energy Emergency Alert (EEA) Levels 1 and 2. | 05/04/2011 | ERCOT | No | 6.5.7.5, 6.5.9.4.2 | Approved | ||
| NPRR364 | Clarify Active and Inactive SCED Constraint Reporting | This Nodal Protocol Revision Request (NPRR) clarifies the reporting requirements for Security-Constrained Economic Dispatch (SCED) constraints and aligns the Protocols with current practices. | 05/04/2011 | ERCOT | No | 6.5.7.1.11 | Approved | ||
| NPRR365 | Change in Resource Outage Approvals from Eight to 45 Days (formerly “Change in Resource Outage Approvals from Eight to 90 Days”) | Consistent with Recommendation 6B of the March 15, 2011, Report of the Rotating Blackout Operations Task Force of the ERCOT Board, this Nodal Protocol Revision Request (NPRR) revises the deadline for ERCOT approval of Resource Outages from an eight-day notice to a 45-day notice while aligning the new Resource Outage timelines to match those of Transmission Outages. | 05/04/2011 | ERCOT | Yes | 3.1.1, 3.1.4.4, 3.1.6, 3.1.6.4, 3.1.6.5, 3.1.6.6, 3.1.6.8, 3.1.6.9, 3.1.6.10 | Approved | ||
| NPRR369 | Black Start Service Requirement Revisions | This NPRR allows ERCOT to conduct unannounced testing of Black Start Resources and further proposes language changes that would allow a Resource Entity representing a contracted Black Start Resource to request that an alternate Generation Resource substitute in place of the Black Start Resource if the alternate Generation Resource meets testing and verification under established qualification criteria to ensure Black Start Service. | 05/18/2011 | ERCOT | Yes | 3.14.2, 4.3, 6.6.8.1, 8.1.1.2.1.5, 22D, 22I | Approved | ||
| NPRR370 | Supplementary Ancillary Services Market Modifications | This Nodal Protocol Revision Request (NPRR) corrects the Supplemental Ancillary Services Market (SASM) to eliminate the notice periods when ERCOT needs to strike a SASM for Ancillary Services that are undeliverable or the result of a Qualified Scheduling Entity’s (QSE’s) failure to provide the service. | 05/26/2011 | Morgan Stanley | No | 6.4.8.2 | Approved | ||
| NPRR372 | Administrative Changes for the July 1, 2011 Protocols to Update Audit References | This Administrative Nodal Protocol Revision Request (NPRR) updates references within Section 1.4.4 and Section 8.2 from SAS 70 to the new Statement on Standards for Attestation Engagements 16 (SSAE 16). | 06/01/2011 | ERCOT | No | 1.4.4, 8.2 | Approved | ||
| NPRR374 | Modification of SCR Process and Urgency Requirements | This Nodal Protocol Revision Request (NPRR) consolidates the System Change Request (SCR) process and NPRR process so that the governing subcommittee for both SCRs and NPRRs is the Protocol Revision Subcommittee (PRS). This NPRR also modifies the requirements for Urgency. | 06/06/2011 | ERCOT | No | 21 | Approved | ||
| NPRR375 | Extend the Reporting Horizon for CDR Inputs | This Nodal Protocol Revision Request (NPRR) extends existing reporting requirements for Mothballed Generation Resource return-to-service probabilities, Generation Resources with associated Load, and Switchable Generation Resources, from five to ten years. | 06/06/2011 | ERCOT | No | 3.14.1.9, 10.3.2.4, 16.5.4 | Approved | ||
| NPRR376 | CRR Volume Limitation Enhancements | This Nodal Protocol Revision Request (NPRR) establishes that Congestion Revenue Right (CRR) Account Holders are not included in the CRR transaction volume limitation process if they do not own open CRR positions or have credit allocated to the CRR Auction. This NPRR also expands ERCOT’s requirement to notify CRR Account Holders about issues pertaining to the transaction limitation. | 06/07/2011 | DC Energy | Yes | 2.1, 7.5.2, 7.5.2.1, 7.5.2.3, 7.5.3.2, 7.5.4 | Approved | ||
| NPRR377 | Alternate Inputs to Base Point Deviation Charge | This Nodal Protocol Revision Request (NPRR) will align the Adjusted Aggregated Base Points (AABP) formula with the inputs to the Generation Resource Energy Deployment Performance (GREDP) measure. The current formula for AABP inaccurately assesses Base Point Deviation charges for under and over generation when shortened Security-Constrained Economic Dispatch (SCED) intervals occur. Additionally, this NPRR includes bill determinants to track the over and under generated volumes and correct language for bill determinants P1 and P2. | 06/07/2011 | ERCOT | No | 6.6.5, 6.6.5.1.1, 6.6.5.1.2, 6.6.5.2, 6.6.5.3, | Approved | ||
| NPRR379 | EILS Dispatch Sequence and Performance Criteria Upgrades | This Nodal Protocol Revision Request (NPRR) improves the operational value of Emergency Interruptible Load Service (EILS); and strengthens and clarifies a number of performance criteria for EILS by:
|
06/08/2011 | ERCOT | No | 2.1, 3.14.3, 6.5.9.4.2, 6.6.11.1, 8.1.3.1, 8.1.3.2, 8.1.3.3, 8.1.3.3.1 | Approved | ||
| NPRR380 | Minor Changes to Default Uplift Invoice | This Nodal Protocol Revision Request (NPRR) provides minor corrective and clarifying changes to the allocation methodology used for the Default Uplift Invoice. | 06/08/2011 | ERCOT | No | 9.19.1 | Approved | ||
| NPRR382 | Verbal RUC Committed or Decommitted Resources Report | This Nodal Protocol Revision Request (NPRR) creates two new reports on the Market Information System (MIS) Secure Area for verbal Reliability Unit Commitment (RUC) commitments/decommitments, one following the Day-Ahead Reliability Unit Commitment (DRUC) and one following the Hourly Reliability Unit Commitment (HRUC) to stay consistent with the current RUC data delivery process. | 06/08/2011 | Jackie Ashbaugh on behalf of the MIS User Group | No | 5.3 | Approved | ||
| NPRR383 | Unconfirmed Trades Reports | This Nodal Protocol Revision Request (NPRR) creates a new report for unconfirmed trades on the Market Information System (MIS) Certified Area that will provide timely information regarding the trades that have not yet been confirmed for the upcoming hour and all remaining hours of the Reliability Unit Commitment (RUC) Study Period so that Market Participants may make adjustments as necessary to conduct business. | 06/08/2011 | Jackie Ashbaugh on behalf of the MIS User Group | No | 4.4.12, 4.4.2.2, 4.4.7.3.2 | Approved | ||
| NPRR384 | Revisions to Support SCR766 , Load Zone and Hub LMPs Distributed by ICCP (formerly “Load Zone Price Distributed by ICCP”) | This Nodal Protocol Revision Request (NPRR) clarifies language that supports system changes proposed in System Change Request (SCR) 766, Load Zone and Hub LMPs Distributed by ICCP (formerly "Load Zone Price Distributed by ICCP"). SCR766 should provide quicker distribution of the Load Zone prices and the Hub prices that are available with each Security-Constrained Economic Dispatch (SCED) execution. |
06/08/2011 | ERCOT | No | 6.3.2 | Approved | ||
| NPRR387 | Hydro RRS Deployment Under Frequency Relay Set Point | This Nodal Protocol Revision Request (NPRR) clarifies that for hydro Generation Resources operating in the synchronous condenser fast-response mode to provide Responsive Reserve (RRS), the initiation setting of the automatic under frequency relay setting shall not be lower than 59.80 Hz. It also includes language to address the instances when a hydro Generation Resource operating in synchronous condenser fast-response mode is triggered by an under frequency relay device without a corresponding RRS deployment by ERCOT. Additionally, this NPRR is a companion to Nodal Operating Guide Revision Request (NOGRR) 068, Hydro-Responsive Reserve, and has been prepared in coordination with ERCOT Staff. Changes to revise the use of “hydro-powered Resource” to “hydro Generation Resource” and revisions to Section 3.8 references are also proposed in this NPRR. |
06/15/2011 | LCRA | Yes | 3.8, 3.8.4, 3.10.7.2, 3.10.7.5.2, 3.18, 4.4.9.2.2, 6.5.9.2, 8.1.1.4.2 | Approved | ||
| NPRR388 | Clarification of Quick Start Generation Resource Performance Criteria | This Nodal Protocol Revision Request (NPRR) clarifies the requirements regarding the performance criteria of a Quick Start Generation Resource (QSGR) during a Security-Constrained Economic Dispatch (SCED) deployment. | 07/06/2011 | Luminant Energy | Yes | 8.1.1.2 | Approved | ||
| NPRR389 | Modification of Voltage Support Requirements to Address Existing Non-Exempt WGRs | This Nodal Protocol Revision Request (NPRR) clearly defines the Reactive Power capability requirements for Wind-powered Generation Resources (WGRs) that commenced operation on or after February 17, 2004, and have a signed Standard Generation Interconnection Agreement (SGIA) on or before December 1, 2009 (Existing Non-Exempt WGRs). These Existing Non-Exempt WGRs will fall into two categories: (1) Those whose current design allows them to meet the Reactive Power capability requirement described in paragraph (3) of Section 3.15. In these cases, the Reactive Power profile is depicted graphically as a rectangle. (2) Those whose current design does not allow them to meet the Reactive Power capability requirement described in paragraph (3) of Section 3.15. These WGRs must conduct engineering studies using the Summer/Fall 2010 Voltage Profiles to determine their actual Reactive Power capability and must, at a minimum, provide Reactive Power proportional to the real power output (a Reactive Power profile depicted graphically as a triangle). This NPRR further requires that all new Generation Resources shall have an engineering study, or demonstrate through performance testing, to show compliance with the Reactive Power capability requirements of paragraph (3) of Section 3.15 before beginning commercial operations. This NPRR also modifies the definition of “Automatic Voltage Regulator (AVR)” to better address the practical differences in Resource technology in providing this capability. |
07/06/2011 | ERCOT | No | 2.1, 3.15 | Approved | ||
| NPRR390 | Clarification of the Applicability of the Use of the Refund Option | This Nodal Protocol Revision Request (NPRR) clarifies the ability to request refund option Pre-Assigned Congestion Revenue Rights (PCRRs) across high voltage Direct Current Ties (DC Ties). |
07/06/2011 | ERCOT | Yes | 7.4.2 | Approved | ||
| NPRR391 | Shortening RTM Settlement and Payment Timeline and Eliminate ACH as a Mode of Payment | This Nodal Protocol Revision Request (NPRR) shortens the posting timeline for the Real-Time Initial Statement by one Business Day, and shortens cash clearing for the Settlement Invoices in which it will be included by one Bank Business Day. This NPRR also eliminates the option of making payments using Automated Clearing House (ACH) funds. |
07/06/2011 | ERCOT | No | 9.5.4, 9.7.1, 9.7.4, 9.9.1`, 9.11.1, 9.19.2.1 | Approved | ||
| NPRR392 | Credit Review During CRR Auction | This Nodal Protocol Revision Request (NPRR) provides for a credit review on preliminary CRR Auction results before CRR Auction results are finalized and posted to ensure that post auction collateral requirements under Section 16, Registration and Qualification of Market Participants, for the proposed CRR awards are within a Counter-Party’s Available Credit Limit (ACL). If a Counter-Party does not have or provide the required Financial Security, this NPRR provides for voiding that Entity’s bids and offers and rerunning the CRR Auction without that Entity’s bids and offers. |
07/14/2011 | ERCOT | Yes | 7.5.5.3 | Approved | ||
| NPRR393 | SCED Constraint Management Transparency | This Nodal Protocol Revision Request (NPRR) creates a reporting requirement to provide transparency into Security-Constrained Economic Dispatch (SCED) constraint management decisions. | 07/14/2011 | Bill Barnes on behaf of J Aron and Company | No | 6.5.7.1.11 | Approved | ||
| NPRR394 | Outage Reporting | This Nodal Protocol Revision Request (NPRR) clarifies that material derates for Resources are greater than 10MW. | 07/14/2011 | Edison Mission | No | 2.1, 3.1.4.8 | Approved | ||
| NPRR395 | CRR Auction Offer Award Disclosure | This Nodal Protocol Revision Request (NPRR) adds a requirement for ERCOT to post Congestion Revenue Right (CRR) Auction offer awards following each CRR Auction in the exact fashion CRR Auction bid awards are currently posted on the Market Information System (MIS) Public Area. | 07/15/2011 | DC Energy | No | 7.5.3.1 | Approved | ||
| NPRR396 | Reduce Standard O&M Costs | This Nodal Protocol Revision Request (NPRR) reduces the standard Operations and Maintenance (O&M) costs permitted to be used in lieu of actual, verifiable O&M costs by NPRR225, Standard Cost Option in Verifiable Costs, which was approved by the ERCOT Board in June 2010. | 07/19/2011 | City of Eastland | Yes | 5.6.1 | Approved | ||
| NPRR397 | Balance of the Day Ancillary Service Market | This Nodal Protocol Revision Request (NPRR) allows the Supplemental Ancillary Services Market (SASM) to be operated as a balance of the day market for Ancillary Services. | 08/01/2011 | Morgan Stanley | No | 4.4.7.4, 6.4.8.2, 6.7.2, 6.7.3 | Approved | ||
| NPRR398 | Changes to Resource Category Minimum-Energy Generic Heat Rates | This Nodal Protocol Revision Request (NPRR) changes the Resource Category Minimum-Energy Generic Heat Rates for several fuel type Resource categories as described below. | 08/03/2011 | ERCOT | No | 4.4.9.2.3 | Approved | ||
| NPRR399 | Updates to Protocol Sections Related to Settlements and Billing | This Nodal Protocol Revision Request (NPRR) includes updates to miscellaneous, non-substantive corrections to various Protocol sections related to Settlements and billing. Revisions include corrections to Protocol references and variable clarifications. | 08/03/2011 | ERCOT | No | 4.4.9.3.3, 4.6.2.3.2, 4.6.3, 5.6.1, 6.6.3.4, 6.6.5, 6.6.6.3, 6.6.9, 6.7.3 , 7.5.6.1, 7.5.6.2, 7.5.6.3, 9.5.3, Real-Time Market Settlement Charge Types 9.5.6, RTM Resettlement Statement | Approved | ||
| NPRR400 | Eliminate Unsecured Credit for CRR Auctions and for Future Credit Exposure and Eliminate Netting of FCE with CCE | This Nodal Protocol Revision Request (NPRR) requires that a) the Future Credit Exposure (FCE) component of the collateral calculation and b) the CRR Auction credit limit be collateralized with cash, letter of credit or a surety bond. Unsecured credit and unsecured credit through guarantees will no longer be available for this. This NPRR also eliminates netting of FCE with Current Credit Exposure (CCE) for all Counter-Parties. To accomplish the above ERCOT considered the approaches listed below:
(1) Establish separate collateral “pools” for Qualified Scheduling Entity (QSE) and CRR activities (similar to zonal); and (2) Continue with a combined collateral pool, but providing sublimits for activity that must be secured.
ERCOT has used the second approach in the NPRR as it provides the most flexibility and ability to maximize use of collateral.
The NPRR addresses three areas:
(1) Splits the Total Potential Exposure (TPE) into two portions: (a) Total Potiential Exposure Secured (TPES) is the TPE that must be secured with cash, letter of credit or surety bond; and (b) Total Potential Exposure Any (TPEA) is the TPE that may be secured with any form of collateral. TPEA will include all exposure not included in TPES.
(2) Defines subcomponents of Financial Security and establishes additional requirements to maintain adequate secured collateral: (a) Secured Collateral (cash, letter of credit or surety bond) (b) Remainder Collateral (Financial Security minus TPES minus Net Positive Exposure of approved CRR Bilateral Trades)
(3) Redefines Available Credit Limit(ACL) and provides for separate calculations of ACL for the Day Ahead (DAM) (ACLD) and CRR (ACLC) markets. ACL for CRRs must be collateralized with Secured Collateral. |
08/03/2011 | ERCOT | Yes | 16.11, 16.11.4.1, 16.11.4.3, 16.11.4.6, 16.11.4.6.1, 16.11.4.6.2, 16.11.5, | Approved | ||
| NPRR401 | Clarification of Timing for a Generation Resource to be Considered Self-Committed | This Nodal Protocol Revision Request (NPRR) removes language that broadly allows Qualified Scheduling Entities (QSEs) to self-commit between the time RUC executes and the time that the QSE receives the RUC instruction, but does not speak to the Settlement treatment and can result in conflicting commitment information. This NPRR clarifies the timing by which a QSE may self-commit a Generation Resource, specifically the timing of the self-commitment required in order for the Generation Resource to be considered self-committed by a RUC process and in Settlement of that same RUC process. | 08/03/2011 | ERCOT | No | 5.3, 5.5.2, 5.6.2 | Approved | ||
| NPRR402 | Clarification of Pre-DAM RUC Instruction Sequence | This Nodal Protocol Revision Request (NPRR) clarifies the treatment of Reliability Unit Commitment (RUC) instructions for instances in which ERCOT issues instructions prior to the closing of the Day-Ahead Market (DAM) submission window and to clarify how a Qualified Scheduling Entity (QSE) may self-commit in such a scenario. | 08/08/2011 | ERCOT | No | 2.1, 2.2, 5.1 | Approved | ||
| NPRR403 | Revised FASD Calculation for TX SET Version 4.0 Release | This Nodal Protocol Revision Request (NPRR) revises the First Available Switch Date (FASD) calculation to include the availability of same day switches on Saturday. | 08/15/2011 | Market Coordination Team (MCT) | No | 15.1.1 | Approved | ||
| NPRR404 | Clarification of Form of Notice of Suspension of Operations | This Nodal Protocol Revision Request (NPRR) removes an obsolete reference to excess energy payment options from the form of Notification of Suspension of Operations in Section 22, Attachment E. | 08/25/2011 | ERCOT | No | 22E | Approved | ||
| NPRR405 | Clarification of DC Tie Load into Operational Systems and Processes | This Nodal Protocol Revision Request (NPRR) clarifies that Direct Current Tie (DC Tie) exports are to be treated as Load. | 08/29/2011 | EDF Trading North America, LLC | No | 4.4.4, 5.1, 5.4, 5.5.2, 6.3.2 | Approved | ||
| NPRR406 | Clarification of the Timeline for Calculating the Value of X at Minimum Energy Level | This Nodal Protocol Revision Request (NPRR) clarifies that the effective date for the value of X as applied to fuel at the minimum energy level is described in the Verifiable Cost Manual. This clarification is consistent with paragraph (a) of Section 5.6.1.1, Verifiable Startup Costs, which also contains language that references the Verifiable Cost Manual for the effective date of the value of X. | 09/02/2011 | ERCOT | No | 5.6.1.2 | Approved | ||
| NPRR407 | Credit Monitoring Posting Requirements (formerly “Credit Monitoring Credit Parameters Posting Requirements”) | This Nodal Protocol Revision Request (NPRR) adds language to require posting of current and previously effective credit parameters to the Market Information System (MIS) Certified Area. |
09/06/2011 | Tenaska | No | 4.4.10, 16.11.4.7 | Approved | ||
| NPRR408 | Clarification of ERCOT Authority to Deny Energization of Non-Compliant Generators | This Nodal Protocol Revision Request (NPRR) clarifies ERCOT’s authority to deny energization of a new or materially changed All-Inclusive Generation Resource if ERCOT determines the Resource Entity cannot demonstrate that the Resource would be able to comply with technical standards in the Protocols, the Planning Guide, the Nodal Operating Guides, and Other Binding Documents. | 09/06/2011 | ERCOT | No | 1.6.5, 16.5 | Approved | ||
| NPRR411 | Administrative Changes for the October 1, 2011 Protocols | This Administrative Nodal Protocol Revision Request (NPRR) updates the Protocols to reflect the name change of Texas Regional Entity (TRE) to Texas Reliability Entity (Texas RE). | 09/08/2011 | ERCOT | No | 8.1.1.3, 8.1.1.4., 8.1.1.4.2, 8.1.1.4.3, 21.1, 21.2, 21.3, 21.4.3, 21.4.4, 21.4.10.1, 21.4.10.2, 21.4.10.3, 21.7, 21.8.3, 21.8.4, 21.8.11.1, 21.8.11.2, 21.8.11.3, | Approved | ||
| NPRR412 | Quick Start Generation Resource Compliance Metric Adjustments | This Nodal Protocol Revision Request (NPRR) clarifies the requirements regarding the performance criteria of a Quick Start Generation Resource (QSGR). | 09/12/2011 | South Texas Electric Coop., Inc. | No | 8.1.1.2 | Approved | ||
| NPRR413 | Oklaunion Exemption Calculation Verification | This Nodal Protocol Revision Request (NPRR) adds details to Section 4.4.4.2 to describe the ERCOT adjustment process when Oklaunion-exempt Load exceeds the actual net output of the Oklaunion Resource and adds the requirement to designate a non-exempt Qualified Scheduling Entity (QSE). | 09/12/2011 | ERCOT | No | 4.4.4.2 | Approved | ||
| NPRR414 | UFE Calculation Clarifications | This Nodal Protocol Revision Request (NPRR) clarifies language in the Unaccounted for Energy (UFE) calculation. | 09/12/2011 | ERCOT | No | 2.1, 11.4.6, 11.4.6.1 | Approved | ||
| NPRR415 | Inadvertent Interchange and Inadvertent Energy Clarification | This Nodal Protocol Revision Request (NPRR) modifies language in Section 6.5.4 related to inadvertent energy. | 09/21/2011 | Frank Owens on behalf of Nodal Protocol and Guides Resolution Task Force (NPGRTF) | No | 6.5.4 | Approved | ||
| NPRR417 | TDSP Submittal of Consumption and Demand Values for AMS ESI IDs | This Nodal Protocol Revision Request (NPRR) documents an existing market process where the Transmission and/or Distribution Service Providers (TDSPs) are providing consumption and demand data for Advanced Metering System (AMS) Electric Service Identifiers (ESI IDs) so the data can be utilized in the implementation of NPRR251, Synchronization of PRR845, Definition for IDR Meters and Optional Removal of IDR Meters at a Premise Where an Advanced Meter Can be Provisioned. | 10/04/2011 | ERCOT | No | 10.3.3.3 | Approved | ||
| NPRR419 | Revise Real-Time Energy Imbalance and RMR Adjustment Charge | This Nodal Protocol Revision Request (NPRR): (1) revises the Real-Time Energy Imbalance equations to determine intermediate data elements for the Resource’s share of the generation site total revenues; (2) revises the Resource Node, Load Zone, and Hub Real-Time Energy Imbalance equations to determine volumetric imbalance for each Qualified Scheduling Entity (QSE) and Settlement Point; and (3) revises the Reliability Must-Run (RMR) Adjustment Charge to charge the QSE for the revenues paid in accordance with the energy imbalance calculation. | 10/05/2011 | ERCOT | No | 6.6.3.1, 6.6.3.2, 6.6.3.3, 6.6.6.3 | Approved | ||
| NPRR421 | Clarification of RMR Notifications | This Nodal Protocol Revision Request (NPRR) updates the Protocols to ensure that ERCOT issues Market Notices to Market Participants contemporaneously with ERCOT’s activities with Reliability Must-Run (RMR) Unit and Must-Run Alternative (MRA) Resource owners. | 10/24/2011 | Edison Mission Marketing & Trading | No | 2.1, 3.14.1, 3.14.1.1, 3.14.1.2, 3.14.1.3, 3.14.1.5, 3.14.1.6, 3.14.1.7, 3.14.1.8, 3.14.1.9, 22F | Approved | ||
| NPRR422 | Public DAM Shift Factors | This Nodal Protocol Revision Request (NPRR) creates a new report to provide Day-Ahead Shift Factors on the Market Information System (MIS) Public Area. | 10/27/2011 | Jackie Ashbaugh on behalf of the MIS User Group | No | 4.5.3 | Approved | ||
| NPRR423 | Add Voltage Support Requirement for IRRs and Allow SCADA Control of Static VAr Devices if Approved by ERCOT (formerly “Add Voltage Support Requirement for IRRs and Allow Manual Control of Static VAr Devices if Approved by ERCOT”) | This Nodal Protocol Revision Request (NPRR) includes Intermittent Renewable Resources (IRRs) in the voltage requirement and clarifies the reactive requirement to be the same as Wind-powered Generation Resources (WGRs). This NPRR also proposes that switchable static Volt-Ampere reactive (VAr) devices can be Supervisory Control and Data Acquisition (SCADA) controlled if approved by ERCOT. | 11/02/2011 | ERCOT | No | 3.15 | Approved | ||
| NPRR424 | Reactive Capability Testing Requirements for IRRs | This Nodal Protocol Revision Request (NPRR) defines the reactive capability testing requirement for Intermittent Renewable Resources (IRRs). | 11/02/2011 | ERCOT | No | 8.1.1.2.1.4 | Approved | ||
| NPRR426 | Standing Non-Spin Deployment in the Operating Hour for Generation Resources Providing On-Line Non-Spin | This Nodal Protocol Revision Request (NPRR) requires Qualified Scheduling Entity (QSE) action that routinely releases certain On-Line Non-Spinning Reserve (Non-Spin) energy to Security-Constrained Economic Dispatch (SCED) without the need for ERCOT to issue a Non-Spin deployment instruction. The changes in Section 6.5.7.6.2.3 do not invalidate any other existing requirements contained in this section. Those Generation Resources not subject to the provisions contained in paragraph (5) of Section 6.5.7.6.2.3 must respond to any Non-Spin deployment or recall instruction issued by ERCOT Operators in accordance with the Technical Advisory Committee (TAC)-approved Non-Spinning Reserve Service Deployment and Recall Procedure. There will not be any validation rules to verify the requirements added by this NPRR. The onus is on all QSEs to make the submission/telemetry changes needed to implement these new requirements. |
11/09/2011 | ERCOT | Yes | 6.5.7.6.2.3 | Approved | ||
| NPRR427 | Energy Offer Curve Requirements for Generation Resources Assigned Reg-Up and RRS | This NPRR adds a requirement for the Energy Offer Curve to be set at the System-Wide Offer Cap (SWCAP) for the capacity reserved for Responsive Reserve (RRS) Service Ancillary Service Resource Responsibility and Regulation Up (Reg-Up) Ancillary Service Resource Responsibility because of the Day-Ahead Market (DAM) or Supplemental Ancillary Services Market (SASM) Ancillary Service awards, or Self-Arranged Ancillary Service Quantity. If RRS and/or Reg-Up Ancillary Service Resource Responsibility is reassigned to a Generation Resource during the Adjustment Period in accordance with Protocol Section 6.4.6, QSE-Requested Decommitment of Resources and Changes to Ancillary Service Resource Responsibility of Resources, it is expected that the Qualified Scheduling Entity (QSE) shall submit an Energy Offer Curve that meets the requirements of Section 6.4.3.2. Energy Offer Curve for Responsive Reserve and Regulation Up Capacity, for the Generation Resource newly assigned Ancillary Service Resource Responsibility for RRS and/or Reg-Up prior to the end of the Adjustment Period. If the Ancillary Resource Responsibility for RRS and/or Reg-Up is reassigned in accordance with Protocol Section 6.4.6 from a Generation Resource that experiences a Forced Outage, Derate, or Startup Loading Failure during the Operating Period, it is expected that the QSE shall submit an Energy Offer Curve that meets the requirements of Section 6.4.3.2 as soon as reasonably practicable after the event. QSE updates to an Energy Offer Curve entered at the end of the Adjustment Period become effective in ERCOT systems at the next Operating Period. Therefore, if RRS or Reg-Up Ancillary Service Resource Responsibility is moved from one Generation Resource to another in the QSE's portfolio during an Operating Hour, any change to the Energy Offer Curve will be effective in the next Operating Period. There will not be any validation rule put in to verify the rules added by the new Protocol language. The onus is on QSE’s to make the submission/telemetry changes needed to implement the new Protocol language. |
11/09/2011 | ERCOT | Yes | 6.4.3.2 | Approved | ||
| NPRR428 | Energy Offer Curve Requirements for Generation Resources Assigned Non-Spin Responsibility | This Nodal Protocol Revision Request (NPRR) adds a requirement for the Energy Offer Curve to be at or above $120 for On-Line Non-Spinning Reserve (Non-Spin) capacity and at or above $180 for Off-Line Non-Spin capacity. If Non-Spin Ancillary Service Resource Responsibility is reassigned to a Generation Resource during the Adjustment Period in accordance with Section 6.4.6, QSE-Requested Decommitment of Resources and Changes to Ancillary Service Resource Responsibility of Resources, the Qualified Scheduling Entity (QSE) shall submit an Energy Offer Curve that meets the requirements of Section 6.4.3.1 for the Generation Resource newly assigned Ancillary Service Resource Responsibility for Non-Spin prior to the end of the Adjustment Period. If the Ancillary Service Resource Responsibility for Non-Spin is reassigned in accordance with Section 6.4.6 from a Generation Resource that experiences a Forced Outage, Derate, or Startup Loading Failure during the Operating Period, the QSE shall submit an Energy Offer Curve that meets the requirements of Section 6.4.3.1 as soon as reasonably practicable after the event. QSE updates to an Energy Offer Curve entered at the end of the Adjustment Period become effective in ERCOT systems at the next Operating Period. Therefore, if Non-Spin is moved from one Generation Resource to another in the QSE's portfolio during an Operating Hour, any change to the Energy Offer Curve will be effective in the next Operating Period. There will not be any validation rules to verify the requirements added by this NPRR. The onus is on all QSEs to make the submission/telemetry changes needed to implement these new requirements. |
11/09/2011 | ERCOT | Yes | 6.4.3.1 | Approved | ||
| NPRR430 | Corrections Related to NPRR357, Revisions to Collateral Requirements Concerning CRR Auctions, and Clarification to Collateral Requirements | This Nodal Protocol Revision Request (NPRR) clarifies the collateral requirements for Congestion Revenue Right (CRR) Account Holders and Counter-Parties who participate in the CRR market. The change will correct certain formula issues in the ERCOT Board-approved NPRR357, Revisions to Collateral Requirements Concerning CRR Auctions, that result in the overcollateralization of CRR Account Holders and Counter-Parties. Further, the specific equations are removed as they more appropriately belong in a white paper that has been created by the ERCOT CRR team in parallel with this NPRR in the same manner as was done for Day-Ahead Market (DAM) credit. With this correction to the Protocols, the CRR credit screening will be consistent with the treatment of the DAM credit exposure equations. | 11/28/2011 | ERCOT | No | 7.5.5.3 | Approved | ||
| NPRR431 | Board Priority Revision Requests | This Nodal Protocol Revision Request (NPRR) proposes a unique status for Revision Requests to designate ERCOT Board priority action items – Board Priority Revision Request. A Board Priority Revision Request would be the result of a vote from the ERCOT Board to direct ERCOT staff to develop a Revision Request that would address a specific issue raised at the ERCOT Board, to officially designate that NPRR as a Board Priority NPRR that will be processed similar to an NPRR with Urgent status, and to request that a resolution of the issue be worked through the Market Participant process by a specific time.
This NPRR also requires ERCOT’s opinion on a Revision Request in the TAC recommendation to the ERCOT Board. |
11/30/2011 | ERCOT | No | 21.4.8, 21.5 | Approved | ||
| NPRR432 | Deployment of Resources to Alleviate Anticipated Emergency Conditions (formerly "Deployment of Resources to Alleviate Imminent Emergency Conditions") | This Nodal Protocol Revision Request (NPRR) institutes parameters governing ERCOT’s utilization of emergency authority under Section 6.5.1.1 when ERCOT seeks to deploy Resources to maintain ERCOT System reliability when Emergency Conditions are anticipated. The NPRR provides a process for ERCOT to procure and deploy Resources that may be used to alleviate anticipated Emergency Conditions in a manner not otherwise delineated in the Protocols and Operating Guides, and requires that such procurements be made only upon approval of the ERCOT Board. In addition to establishing procedural steps for such procurements, the NPRR includes steps to minimize impacts on the broader market. These steps include prohibiting such Resources from being offered into the Day-Ahead Market (DAM) or used solely to reduce local congestion. The proposed market protections also include steps to ensure that the Resources deployed pursuant to this NPRR would be among the last in line for economic Dispatch, so as not to displace Resources that are On-Line and offering into the market. |
12/02/2011 | ERCOT | Yes | 6.5.1.1 | Approved | ||
| NPRR433 | Clarification of Ancillary Service Obligation Calculation Process | This Nodal Protocol Revision Request (NPRR) clarifies the ERCOT process regarding the calculation of Ancillary Service Obligations. | 12/09/2011 | ERCOT | No | 4.2.1.2 | Approved | ||
| NPRR434 | Increase the Capacity Limitation of a Generation Resource Providing RRS | This Nodal Protocol Revision Request (NPRR) increases the amount of Responsive Reserve (RRS) that can be supplied by a Generation Resource to 24%. | 12/27/2011 | Robert Helton on behalf of the Reliability Deployment Task Force | Yes | 3.16 and 3.18 | Approved | ||
| NPRR435 | Requirements for Energy Offer Curves in the Real Time SCED for Generation Resources Committed in RUC | This Nodal Protocol Revision Request (NPRR) adds a requirement for the Qualified Scheduling Entity (QSE) of a Generation Resource committed by the Reliability Unit Commitment (RUC) process to submit an Energy Offer Curve that prices all energy from Low Sustained Limit (LSL) to High Sustained Limit (HSL) at the System-Wide Offer Cap (SWCAP) for RUC committed intervals. When Generation Resources are committed in the Day Ahead or during the Adjustment Period in the RUC process, the QSE shall submit an Energy Offer Curve for the Generation Resource that meets the above requirements no later than the end of the Adjustment Period immediately preceding the Operating Period that includes an Operating Hour coincident with the first hour of the RUC Dispatch Instruction. QSE updates to an Energy Offer Curve entered at the end of the Adjustment Period become effective in ERCOT systems at the start of the next Operating Period. Therefore, if a Generation Resource is committed by an ERCOT Operator issued Verbal Dispatch Instruction(VDI) for the Operating Hour in the immediate Operating Period, then it is expected that the QSE shall submit an Energy Offer Curve that meets the requirements described above as soon as reasonably practicable after receipt of the VDI. ERCOT systems will not validate that the Energy Offer Curve for RUC-committed Generation Resources meet the requirements described above. QSEs are solely responsible to make the submission changes needed to implement the Protocol requirements described in this NPRR. |
01/03/2012 | ERCOT | Yes | 6.4.3.1 (new) | Approved | ||
| NPRR437 | Allow Aggregation of Multiple Generators Into A Single Resource For Market and Engineering Modeling | This Nodal Protocol Revision Request (NPRR) will allow aggregation of similar qualified non-wind-powered generators into an Aggregate Generation Resource (AGR) for market and engineering modeling purposes. | 01/23/2012 | ERCOT | Yes | 2.1, 2.2, 3.10.7.2, 4.4.9.2.3, 4.6.2.3.1, 5.6.1, 5.7.1.1, 5.7.3, 6.5.5.2, 16.5 | Approved | ||
| NPRR439 | Updating a Counter-Party’s Available Credit Limit for Current Day DAM | This Nodal Protocol Revision Request (NPRR) will provide flexibility for Counter-Parties to increase the credit limit available for the Day-Ahead Market (DAM) on the day the DAM is running by posting additional Financial Security under certain circumstances after ERCOT has already set a daily credit limit. |
01/25/2012 | ERCOT | No | 16.11.4.6, 16.11.4.6.2 | Approved | ||
| NPRR441 | Revision of Dynamic Rating Recommendation Posting Timeline | This Nodal Protocol Revision Request (NPRR) will allow the frequency of posting the list of transmission lines recommended for Dynamic Ratings from semi-annual to annual. | 02/01/2012 | ERCOT | No | 3.10.8.4 | Approved | ||
| NPRR442 | Energy Offer Curve Requirement for Generation Resources Providing Reliability Must-Run Service | This Nodal Protocol Revision Request (NPRR) adds the following requirements for Reliability Must-Run (RMR) Units that ERCOT has made available for commitment in accordance with Section 4.4.8: (1) A requirement for the RMR Unit’s Energy Offer Curve to be set at the System-Wide Offer Cap (SWCAP) for Generation Resources providing RMR Service; and (2) A requirement for ERCOT to construct a Mitigated Offer Cap curve for Resources contracted for capacity pursuant to paragraph (2) of Section 6.5.1.1, ERCOT Control Area Authority, such that those Resources are not mitigated in Security-Constrained Economic Dispatch (SCED) and hence will be Dispatched for local constraints only if the prices are higher than or equal to SWCAP. If a Reliability Unit Commitment (RUC) unit is deployed, ERCOT will submit an Output Schedule or Energy Offer Curve for the Generation Resource at the SWCAP. |
02/03/2012 | Morgan Stanley | Yes | 4.4.8, 4.4.9.4.1, 6.4.3 | Approved | ||
| NPRR448 | Clarification of Database Query Results | This Nodal Protocol Revision Request (NPRR) clarifies the information returned through a database query or an extract on the Market Information System (MIS) Public Area. | 03/07/2012 | Kathryn Thurman on behalf of Texas Standard Electronic Transaction (SET) Working Group | Yes | 15.2 | Approved | ||
| NPRR449 | Reduce Maximum CRR Transaction Limit in Auctions | This Nodal Protocol Revision Request (NPRR) reduces the potential of oversubscription of Congestion Revenue Right (CRR) Auctions due to bid volumes by reducing the first round transaction limit from 10,000 to a value established by the Technical Advisory Committee (TAC). | 03/13/2012 | WMS | Yes | 7.5.2 | Approved | ||
| NPRR450 | Revise Requirements for Contracts to Procure Additional Capacity to Alleviate Emergency Conditions (formerly “Revise Board Approval Requirement for Contracts to Procure Additional Capacity to Alleviate Emergency Conditions”) | The Nodal Protocol Revision Request (NPRR) revises the process approved in NPRR432, Deployment of Resources to Alleviate Anticipated Emergency Conditions, for execution of contracts with Resources to alleviate anticipated Emergency Conditions. Consistent with the ERCOT Board’s discussion at its February 2012 meeting, this NPRR provides that such contracts may be executed by ERCOT, subject to the Notice provisions already included in NPRR432. This NPRR adds language that ERCOT will provide notice to the ERCOT Board of executed contracts at the first ERCOT Board meeting after the contract is signed. This provision is consistent with the notice to the ERCOT Board provided for Reliability Must Run (RMR) Agreements under Section 3.14.1.3, ERCOT Report to Board on Signed RMR Agreements. This NPRR also proposes revisions to remove the limitation in the procurement of Loads under NPRR432 to Loads that are currently registered with ERCOT as Load Resources. |
03/14/2012 | ERCOT | Yes | 6.5.1.1 | Approved | ||
| NPRR451 | Implementation of New P.U.C. Subst. Rule 25.507, Electric Reliability Council of Texas (ERCOT) Emergency Response Service (ERS) | This NPRR is required to implement the provisions of the newly revised P.U.C. Subst. R. 25.507, Electric Reliability Council of Texas (ERCOT) Emergency Interruptible Load Service (EILS). Project 39948, Rulemaking to Electric Reliability Council of Texas (ERCOT) Emergency Interruptible Load Service (EILS), was adopted by the Public Utility Commission of Texas (PUCT) on March 22, 2012. |
03/15/2012 | ERCOT | Yes | 2.1, 2.1, 3.14, 3.14.3, 3.14.3.1 (new), 3.14.3.2 (new), 3.14.3.3 (new), 3.14.3.4 (new), 6.5.9.4, 6.5.9.4.2, 6.5.9.4.3, 6.6.11, 6.6.11.1, 6.6.11.2, 8.1.3, 8.1.3.1, 8.1.3.1.1 (new), 8.1.3.1.2 (new), 8.1.3.1.3 (new), 8.1.3.1.3.1 (new), 8.1.3.1.3.2 (new), 8.1.3.1.3.3 (new), 8.1.3.1.4 (new), 8.1.3.2 | Approved |