Withdrawn Nodal Operating Guide Revision Requests (OGRRs)
| # |
Title |
Description |
Date Posted |
Sponsor |
Urgent |
Protocol Sections |
Current Status |
Next Group |
Next Step |
| NOGRR065 |
Authorize ERCOT to Procure Additional RRS During Severe Cold Weather |
This Nodal Operating Guide Revision Request (NOGRR) aligns with NPRR336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather, which proposes to allow ERCOT to procure additional Responsive Reserve (RRS) during cold weather conditions. |
03/09/2011
|
TNMP |
No |
4.2.3 |
Withdrawn |
|
|
| NOGRR073 |
Entity Responsible for Load Shed During EEA Level 3 |
This Nodal Operating Guide Revision Request (NOGRR) clarifies who is responsible to shed Load during an Energy Emergency Alert (EEA) Level 3 event. This NOGRR also clarifies that ERCOT is responsible for directing Load shedding. |
05/17/2011
|
Frank Owens on Behalf of Nodal Protocol and Guides Resolution Task Force (NPGRTF) |
No |
4.5.3.4 |
Withdrawn |
|
|
| NOGRR078 |
Real-Time Security Analysis Language Clean Up to Reconcile Operating Guides with Current Operation Practice |
This NOGRR clarifies that the only security analysis studies that remain in the Nodal Operating Guides are the Real-Time security studies (given that Outage Planning is now covered in Protocol Section 3.1.5.1 and Transmission Planning is now covered in Planning Guide Section 4, Transmission Planning Criteria); and modifies the language to match current ERCOT Operations practice related to which contingencies are enforced in Real-Time operations. |
09/07/2011
|
Luminant Energy |
No |
1.4, 2.2.2 |
Withdrawn |
|
|