Pending Nodal Operating Guide Revision Requests (NOGRRs)
# Title Description Date Posted Sponsor Urgent Protocol Sections Current Status Next Group Next Step
NOGRR086 Clarification of Seasonal Unit Capability Testing Requirements This Nodal Operating Guide Revision Request (NOGRR) clarifies the seasonal unit capability testing requirement. 11/01/2011  ERCOT No 3.3.1 Pending ROS ROS for consideration.
NOGRR088 Synchronization with NPRR424, Reactive Capability Testing Requirements for IRRs This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 424 which defines the reactive capability testing requirement for Intermittent Renewable Resources (IRRs). 12/12/2011  ERCOT No 3.3.2.2, 3.3.2.3 Pending TAC TAC Consideration
NOGRR089 Clarification of Responsibilities for Black Start Resources and QSEs This Nodal Operating Guide Revision Request (NOGRR) clarifies the responsibilities of the Black Start Resource and the Qualified Scheduling Entity (QSE) representing the Black Start Resource.  It also clarifies language related to the Transmission Operator’s (TO’s) local Black Start plans and the QSE's Black Start procedures. 12/14/2011  Luminant No 4.6, 4.6.4, 8E, 9.4.2 Pending ROS ROS Consideration
NOGRR091 Criteria for the Selection of Operators This Nodal Operating Guide Revision Request (NOGRR) adds clarification to the criteria for the selection of operators in the ERCOT Region. ERCOT No 1.5.5 Pending OWG OWG review the IA
NOGRR092 Synchronization with NPRR451 This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with NPRR451, which implements provisions of P.U.C. Subst. R. 25.507. 04/05/2012  ERCOT Yes 4.5.3.3, 9.1.1, 9.1.4 Pending TAC TAC Consideration
NOGRR093 Synchronization with NPRR365 This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 365, Change in Resource Outage Approvals from Eight to 45 Days, which was approved by the ERCOT Board on 9/20/11 and revised the deadline for ERCOT approval of Resource Outages from an eight-day notice to a 45-day notice while aligning the new Resource Outage timelines to match those of Transmission Outages. 05/01/2012  OWG No 9.1.6 Pending
NOGRR094 Administrative Changes for June 1, 2012 Nodal Operating Guides This Administrative Nodal Operating Guide Revision Request (NOGRR) updates the ERCOT Load Shed Table for 2012. 05/02/2012  ERCOT No 4.5.3.4 Pending
NOGRR095 Type 2 Special Protection System Submissions This NOGRR revises paragraph (13) of Section 6.2.2 to state that non-TSP equipment owners may submit Type 2 SPS proposals to ERCOT. 05/10/2012  Calpine Yes 6.2.2 Pending OWG OWG review the IA
NOGRR096 Clarification of RRS Obligation The Other Binding Document, Methodologies for Determining Ancillary Service Requirements, describes a process that may be used to procure additional Responsive Reserve Service (RRS).  This Nodal Operating Guide Revision Request (NOGRR) references that Other Binding Document and also adds clarifying language affirming that the minimum RRS obligation remains unchanged (2300 MW), but that additional RRS may be procured if there is a reliability need. 05/22/2012  the Nodal Protocol and Guides Resolution Task Force No 2.3.1.1 Pending OWG OWG consideration