Pending Nodal Operating Guide Revision Requests (NOGRRs)
| # |
Title |
Description |
Date Posted |
Sponsor |
Urgent |
Protocol Sections |
Current Status |
Next Group |
Next Step |
| NOGRR086 |
Clarification of Seasonal Unit Capability Testing Requirements |
This Nodal Operating Guide Revision Request (NOGRR) clarifies the seasonal unit capability testing requirement. |
11/01/2011
|
ERCOT |
No |
3.3.1 |
Pending |
ROS |
ROS for consideration. |
| NOGRR088 |
Synchronization with NPRR424, Reactive Capability Testing Requirements for IRRs |
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 424 which defines the reactive capability testing requirement for Intermittent Renewable Resources (IRRs). |
12/12/2011
|
ERCOT |
No |
3.3.2.2, 3.3.2.3 |
Pending |
TAC |
TAC Consideration |
| NOGRR089 |
Clarification of Responsibilities for Black Start Resources and QSEs |
This Nodal Operating Guide Revision Request (NOGRR) clarifies the responsibilities of the Black Start Resource and the Qualified Scheduling Entity (QSE) representing the Black Start Resource. It also clarifies language related to the Transmission Operator’s (TO’s) local Black Start plans and the QSE's Black Start procedures. |
12/14/2011
|
Luminant |
No |
4.6, 4.6.4, 8E, 9.4.2 |
Pending |
ROS |
ROS Consideration |
| NOGRR091 |
Criteria for the Selection of Operators |
This Nodal Operating Guide Revision Request (NOGRR) adds clarification to the criteria for the selection of operators in the ERCOT Region. |
|
ERCOT |
No |
1.5.5 |
Pending |
OWG |
OWG review the IA |
| NOGRR092 |
Synchronization with NPRR451 |
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with NPRR451, which implements provisions of P.U.C. Subst. R. 25.507. |
04/05/2012
|
ERCOT |
Yes |
4.5.3.3, 9.1.1, 9.1.4 |
Pending |
TAC |
TAC Consideration |
| NOGRR093 |
Synchronization with NPRR365 |
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 365, Change in Resource Outage Approvals from Eight to 45 Days, which was approved by the ERCOT Board on 9/20/11 and revised the deadline for ERCOT approval of Resource Outages from an eight-day notice to a 45-day notice while aligning the new Resource Outage timelines to match those of Transmission Outages. |
05/01/2012
|
OWG |
No |
9.1.6 |
Pending |
|
|
| NOGRR094 |
Administrative Changes for June 1, 2012 Nodal Operating Guides |
This Administrative Nodal Operating Guide Revision Request (NOGRR) updates the ERCOT Load Shed Table for 2012. |
05/02/2012
|
ERCOT |
No |
4.5.3.4 |
Pending |
|
|
| NOGRR095 |
Type 2 Special Protection System Submissions |
This NOGRR revises paragraph (13) of Section 6.2.2 to state that non-TSP equipment owners may submit Type 2 SPS proposals to ERCOT. |
05/10/2012
|
Calpine |
Yes |
6.2.2 |
Pending |
OWG |
OWG review the IA |
| NOGRR096 |
Clarification of RRS Obligation |
The Other Binding Document, Methodologies for Determining Ancillary Service Requirements, describes a process that may be used to procure additional Responsive Reserve Service (RRS). This Nodal Operating Guide Revision Request (NOGRR) references that Other Binding Document and also adds clarifying language affirming that the minimum RRS obligation remains unchanged (2300 MW), but that additional RRS may be procured if there is a reliability need. |
05/22/2012
|
the Nodal Protocol and Guides Resolution Task Force |
No |
2.3.1.1 |
Pending |
OWG |
OWG consideration |